Archi + Tech time💡
5.9K subscribers
3.63K photos
57 videos
61 files
941 links
⌛️ Explore the #future of #tech and #architecture! Uncover cutting-edge concepts, #AI breakthroughs, fashion design innovations, art, scientific discoveries, and more.

Questions? @techtimeeee

Follow the future — tailor your interests in these dynamic…
Download Telegram
Allied Works’ winning proposal for Ohio Veterans Memorial and #Museum in Columbus / 2014. The project is conceived as an architecture of two acts. The first is an act of landscape, where the surrounding parkland is cut, carved and lifted into the sky, creating a processional path to the sanctuary, a place of ceremony, celebration and reflection - a civic room for the city of Columbus,” explains Allied Works.

“The second is an act of structure, where a series of concentric arches rise from the earth to hold the sanctuary above. These bands of interwoven concrete hold and protect the museum and its occupants within, creating a labyrinthine journey of exhibitions that illuminate ideas of service, duty and remembrance."

#Architect: Allied Works Architecture
#Photos by: MIR, Allied Works Architecture

━━━━━⊱💡⊰━━━━━
♻️ @techtimee ♻️
♻️ @techtimee ♻️

📱 Follow the FUTURE 📲
#3dprinted #architecture to see more of robotic 3d printed projects like the ITKE-ICD’s Research Pavilion which was built by robots in 2014 as part of a successful series of research pavilions.

The project showcases the potential of novel design, simulation and fabrication processes in architecture. The pavilion was planned and constructed within one and a half years by students and researchers within a multi-disciplinary team of biologists, paleontologists, architects and engineers.

The specific robotic fabrication process includes the winding of 6 individual layers of glass and carbon fibers. In total 36 individual elements were fabricated, whose geometries are based on structural principles abstracted from the beetle elytra. Each of them has an individual fiber layout which results in a material efficient load-bearing system.


━━━━━⊱💡⊰━━━━━
♻️ @techtimee ♻️
♻️ @techtimee ♻️

📱 Follow the FUTURE 📲
Lumion Pro 11.0.1.9 by [Z][TPC].torrent
48.3 KB
━━━━━⊱💡⊰━━━━━
♻️ @techtimee ♻️
♻️ @techtimee ♻️

📱 Follow the FUTURE 📲
Autodesk_3DS_MAX_2022_40_x64_41_Multilanguage_Crack_FileWomen_.torrent
168.5 KB
Autodesk 3DS MAX #2022 (torrent)
━━━━━⊱💡⊰━━━━━
♻️ @techtimee ♻️
♻️ @techtimee ♻️

📱 Follow the FUTURE 📲
Autodesk Revit 2022 (x64) Multilanguage [FileCR].zip.torrent
22.6 KB
Autodesk Revit #2022 (torrent)

━━━━━⊱💡⊰━━━━━
♻️ @techtimee ♻️
♻️ @techtimee ♻️

📱 Follow the FUTURE 📲
big_builds BIG #designreveal for OPPO’s new R&D headquarters in #Hangzhou, China, will exemplify the OPPO design philosophy of pursuing the perfect balance between redefined aesthetics and innovative technology, in a building that will be environmentally, economically, and socially sustainable- a responsible citizen and iconic gateway to Hangzhou’s Future #Sci-Tech City


━━━━━⊱💡⊰━━━━━
♻️ @techtimee ♻️
♻️ @techtimee ♻️

📱 Follow the FUTURE 📲
#Al_Bahar_Towers
The #Aedas studio was chosen to design the new headquarters of the Abu Dhabi Investment Council after an international competition for the commission. The two 25-floor office towers have capacity for between 1000 and 1100 employees in each. The design concept is both culturally and environmentally appropriate and meets the goals of the 2030 Development Plan for Abu Dhabi which was recently published.

Architect : Abdulmajid Karanouh + Aedas Arquitectos
Associate Architect : Diar Consult
Engineer : Arup
Acoustic Engineer : Arup
Construction Company : Al-Futtaim Carillion
Founder : Council Investment Abu Dhabi
Designed in : 2008
Built in : 2009-2012
Height : 147.0 m
Roof Height : 145.1 m
Top Floor Height :120.0 m
Floors : 27
Land Area : 100.080 m²
Floor Area : 56.000 m²
Façade : Facade responsive
Location : Abu Dhabi, United Arab Emirates

━━━━━⊱💡⊰━━━━━
♻️ @techtimee ♻️
♻️ @techtimee ♻️

📱 Follow the FUTURE 📲