Napata Engineering
33 subscribers
13 photos
4 videos
3 files
7 links
Download Telegram
Rock excavation in progress
๐Ÿ‘3๐Ÿ‘1
Earthwork progress on the completion ๐Ÿ˜Š
๐Ÿ‘2๐Ÿ‘1
๐Ÿ”ฅ2
Forwarded from Napata Engineering
๐ŸŽ‰ Napata Engineering Inauguration Special ๐ŸŽ‰
โ€œGreen Builds. Strong Africa.โ€ ๐ŸŒ๐Ÿ’š

To celebrate our official launch in Ethiopiaโ€™s construction industry,
Napata Engineering proudly offers a FREE ETABS Course for Ethiopians! ๐Ÿ‡ช๐Ÿ‡น

๐Ÿ“Œ Course Details
๐Ÿ”น Topic: Structural Analysis of Reinforced Concrete Building
๐Ÿ”น Mode: Live on Zoom
๐Ÿ”น Date: Tuesday, October 7, 2025
๐Ÿ”น Time: 9:00 PM โ€“ 9:40 PM (East Africa Time)
๐Ÿ”น Open for: Students, graduates & professionals
๐Ÿ”น 100% Free โ€“ Limited seats!

๐Ÿ“ฒ Join Zoom Session Here:
๐Ÿ‘‰ https://us04web.zoom.us/j/79268653963?pwd=6n0caG215X8djWkMpScY3JCXVaXp4G.1

๐ŸŒ Donโ€™t forget to subscribe & follow us on all our platforms for more updates:

Telegram
https://t.me/Civilengineeringethiopia
https://t.me/napataengineering

Tiktok
https://www.tiktok.com/@napata.engineerin?_t=ZM-8zYCJn9JO9I&_r=1

Website
https://napataeng.com/

๐Ÿš€ Together, we build sustainably for Ethiopia & Africa.
Due to a technical meeting at the same time as the ETABS class scheduled for today, the session is rescheduled to 4:30 local. Thanks All ๐Ÿ˜Š
2018 1st Q. CONSTRUCTION WORKS ONLY DIRECT COST 01.02.2018.pdf
24.2 MB
แ‹จ2018 1แŠ› แˆฉแ‰ฅ แ‹“แˆ˜แ‰ต แ‹จแŠฎแŠ•แˆตแ‰ตแˆซแŠญแˆฝแŠ• แˆตแˆซแ‹Žแ‰ฝ แ‰€แŒฅแ‰ฐแŠ› แ‹‹แŒ‹ แŒฅแŠ“แ‰ต

2018E.C 1st Quarter Construction Works (Only Direct Cost)

แ‹จแŠ แ‹ฒแˆต แŠ แ‰ แ‰ฃ แŠจแ‰ฐแˆ› แŠ แˆตแ‰ฐแ‹ณแ‹ฐแˆญ แ‹ฒแ‹›แ‹ญแŠ•แŠ“ แŒแŠ•แ‰ฃแ‰ณ แˆตแˆซแ‹Žแ‰ฝ แ‰ขแˆฎ แŒˆแ…
Forwarded from Napata Engineering
Qorannoo_Gabaa_galteewwan_ijaarsaa_Marsaa_2ffa_Bara_201822222.pdf
18.9 MB
แ‹จ2018 แ‹“.แˆ 2แŠ› แˆฉแ‰ฅ แ‹“แˆ˜แ‰ต แ‹จแŒแŠ•แ‰ฃแ‰ณ แˆฅแˆซแ‹Žแ‰ฝ แ‹จแ‰€แŒฅแ‰ฐแŠ› แ‹‹แŒ‹ (Direct Cost) แŒฅแŠ“แ‰ต แˆฐแАแ‹ต

Oromia Construction Authority (OCA)
๐Ÿ“ฑ+251911544779 / +251919380898

๐Ÿ” #Share with your friends
Forwarded from Napata Engineering
Media is too big
VIEW IN TELEGRAM
๐Ÿ“ฃ EARTH-MOVING WORK UPDATE โ€“ Napata Engineering

We are pleased to announce that earth-moving operations have officially begun. Our team is fully prepared to deliver reliable excavation, hauling, and site-preparation services with quality and efficiency.

If you need earth-moving or related construction work, please reach out to us:

๐Ÿ“ž Phone: 0911544779
๐Ÿ“ง Email: info@napataeng.com

๐ŸŒ Website: www.napataeng.com

We are ready to support your project with professional execution and dependable service.

Thank you,
Napata Engineering
โค1
Forwarded from Napata Engineering
๐Ÿ“ฃ EARTH-MOVING WORK UPDATE โ€“ Napata Engineering

We are pleased to announce that earth-moving operations have officially begun. Our team is fully prepared to deliver reliable excavation, hauling, and site-preparation services with quality and efficiency.

If you need earth-moving or related construction work, please reach out to us:

๐Ÿ“ž Phone: 0911544779
๐Ÿ“ง Email: info@napataeng.com

๐ŸŒ Website: www.napataeng.com

We are ready to support your project with professional execution and dependable service.

Thank you,
Napata Engineering
This image made me think of pre-contract cost planning as it relates to the construction sector here in Ethiopia. The underlying message of this image is simple but powerful:

Some things burn when rushed. Others become a masterpiece with time.

This concept applies directly to pre-contract cost management. In our industry, the pressure to accelerate cost plans, BoQs, and estimates is becoming increasingly common. Design packages are often issued without prior notice, and cost teams are expected to deliver comprehensive outputs within unrealistic timeframes. While this may seem efficient in the moment, the consequences of rushing this foundational stage are significant:

- Incomplete scope coverage
- Inaccurate quantities and measurements
- Insufficient risk consideration
- Unreliable budgets
- Increased variations and claims during construction
- Misalignment between client, consultant, and contractor expectations

These outcomes mirror the โ€œburntโ€ result: a process forced too quickly ultimately fails to serve its purpose.

Conversely, when adequate time is provided during the pre-contract phase, the results consistently demonstrate value:

- Accurate and dependable cost plans
- Detailed BoQs aligned with the latest design intent
- Properly assessed commercial and technical risks
- Budgets that remain stable throughout the project lifecycle
- Reduced variation exposure and smoother post-contract delivery
- Stronger trust and transparency among project stakeholders

Pre-contract work forms the financial blueprint of the project. Treating it as a box-ticking exercise or compressing timelines only shifts risk downstream, often at significantly higher cost.

As the analogy suggests, quality outcomes require time, structure, and the right conditions. Investing in the early stages ensures that the project begins on a solid commercial footing, minimising disputes and maximising value as the project progresses.

In pre-contract cost management, time is not an obstacle; it is a critical component of achieving the best possible outcome.
Forwarded from Napata Engineering
This media is not supported in your browser
VIEW IN TELEGRAM
๐Ÿšœโœจ EARTH-MOVING WORK UPDATE โ€“ Napata Engineering

Weโ€™re excited to announce that our earth-moving operations are now in full action!
From excavation to hauling and complete site preparation, our team is delivering fast, efficient, and high-quality results for every project.

๐ŸŽฅ Check out the attached night-shift work video!
It showcases our team working tirelessly around the clockโ€”because at Napata Engineering, your project timeline is our priority.

Whether youโ€™re starting a new construction project or need reliable earth-moving support, weโ€™re here to serve you with professional execution, modern equipment, and dependable service.

๐Ÿ“ž Phone: 0911544779
๐Ÿ“ง Email: info@napataeng.com
๐ŸŒ Website: www.napataeng.com

Green Builds, Strong Africa
Napata Engineering โ€” Moving Earth, Building Progress.
๐Ÿ”ฅ1
Forwarded from Firaol C.
Forwarded from Napata Engineering
SBD_Works_ICB__November-Final_2.pdf
1.9 MB
Standard Bidding Document (SBD) For Procurement of Works For International Competitive Biddings (ICB)

๐Ÿ“ฑ+251911544779 / +251919380898

๐Ÿ” #Share with your friends
Channel photo updated
แˆ˜แˆ‹แ‹ แ‹จแŠฅแˆตแˆแˆแŠ“ แŠฅแˆแАแ‰ต แ‰ฐแŠจแ‰ณแ‹ฎแ‰ฝ แ‰ แˆ™แˆ‰ แŠฅแŠ•แŠณแŠ• แˆˆแ‹’แ‹ต แŠ แˆ-แˆแŒฅแˆญ แ‰ แ‹“แˆ แ‰ แˆฐแˆ‹แˆ แŠ แ‹ฐแˆจแˆณแ‰ฝแˆ::

แŠขแ‹ต แˆ™แ‰ฃแˆจแŠญ!
Forwarded from Napata Engineering
Media is too big
VIEW IN TELEGRAM
๐Ÿš Drone Progress Update | B+G+7 + Terrace Project

Napata Engineering proudly presents the latest aerial view of our B+G+7 + Terrace building project as we reach the final floor stage. The structure is rapidly taking shape through precision engineering, quality workmanship, and dedicated teamwork. Every level reflects our commitment to excellence, safety, and modern construction standards. Stay connected for more progress updates as we move closer to completion. ๐Ÿ—๏ธโœจ
๐Ÿ”ฅ1
Forwarded from Napata Engineering
Eid Mubarak to all Muslims around the world from Napata Engineering. May this blessed occasion bring peace, happiness, prosperity, and unity to you and your families. ๐ŸŒ™โœจ