Mechanical Engineer
996 subscribers
165 photos
30 videos
28 files
538 links
Building services, Haydraulic engineer, engineering news, interesting engineering, technology, career and Includes all specifications.
Download Telegram
Forwarded from B l S l E
BIM dictionary

Actual Cost:


Actual Cost is the total amount incurred to convert the Planned Value into the Earned Value. PV is part orEarned Value Management.

#BIMDictionary
#ActualCost

Join us | @HydraulicEngineer