SOLARGROUP | Official channel EN
857 subscribers
359 photos
1 video
8 files
413 links
Only for News sharing

Invite link for the Channel:
https://t.me/joinchat/Re-4NKo3dcCjTfCd
Download Telegram
to view and join the conversation
Фото от Dima
Special webinar today with a Special Guest Pavel Filippov. Pavel Filippov is the head of advertising and public relations at SOLARGROUP. As a top management staff, he will tell you about the latest news and achievements of the project and SOLARGROUP. He will also answer whatever questions you have for him, which will help you understand the project better.

Won’t you like to hear from SOLARGROUP's top official and get answers to your questions firsthand?

You can’t just afford to miss today’s webinar.

Zoom link: https://is.gd/solargroup_nigeria
Date: 29.08.2021
Time: 17:00 (5pm Nigerian Time)
Duyunov vs Musk, or how Tesla "invents" new technologies

23.08.21

"Tesla Model Y got a heat pump to save energy for heating" - such information, published in a number of online sources about innovative technologies, couldn't be left unnoticed and sparked wide audience interest.
The articles describe the benefits and operation of the heat pump:

"...in Tesla Model Y the heat pump is located next to the electric motor, which is able to generate heat during operation. It can be used to heat the passenger compartment as well as to keep the traction batteries at optimum temperature during the cold season. Without a heat pump, you would have to use the traction batteries to heat the cells, but if you have a heat pump, you can save a little bit of charge."

This solution is portrayed to the audience as innovative, but is it really so?

The fact is that the patent application for this technical solution was submitted back in 2013 by some Russian engineers, including D.A. Duyunov. You can find the patent No. 25692
​​📌 Week results in the project "Duyunov's motors"

Last week, the construction of the "Sovelmash" D&E passed the 80-day mark: that's how much time has passed from the start of installing the first girder to the installation of the last column of the testing and production building.

The construction of the office and amenity building is also underway:

- installation of basement floor slabs,

- reinforcement strapping for the first section of the elevator shaft.

Other work is also in progress at the construction site.

On August 25, the journalist and writer Alexander Sherstyuk, whose article marked the beginning of the project back in 1994, visited the construction site. Back then his article about Professor Nikolay Yalovega was published in the Zelenograd newspaper "41". Dmitriy Duyunov became interested in the article, he met Nikolay Yalovega, the author of the combined winding scheme for electric motors presented in the article, after which he continued working in this direction independently.

The journalist visited "Sovelmash", got acquainted with its management, visited the leased premises of the company as well as the construction site, where our camera crew filmed an interview with him.

On August 28, SOLARGROUP's national representative office opened in Nepal. To celebrate this, an online conference was held with the participation of SOLARGROUP's top managers Pavel Shadskiy and Pavel Filippov, national partner in India and Nepal Gulshan Kumar Birdi, CEO of ASPP Weihai Victor Arestov. During the first day, the conference was viewed by more than 1,200 people. We will tell you more about the event in the coming days. Follow our news!
​​📌 What can be achieved in 80 days | "Sovelmash" construction site

In the new video, our film crew will show you the changes that have taken place at the construction site over 80 days since the first girder was installed.

Today, on August 27, the installation of the last column of the testing and production building has been completed, and at the moment only six axes of the office and amenity building remain to be mounted.

Enjoy watching!
​​📌 Installation of the "Sovelmash" D&E office and amenity building has started | Day 85

Work on erecting the "Sovelmash" design and engineering technology department is rapidly progressing at the "Alabushevo" construction site. The installation of metal structures for the future office and amenity building has begun, the formation of staircases continues — the reinforcement strapping is being performed, removable formwork is being installed and preparation for concrete pouring is underway, roofing work has begun on the testing and production site, earthwork is well underway - the layout of the sewage system is being carried out and individual sections are being tested for leaks, a truck with reinforcement mesh and other materials to begin casting the concrete overlaps and floor is being unloaded.
Enjoy watching!
​​📌 Finish of SOLARGROUP promos first flow: congratulations to the winners!

All summer long they were working hard to achieve results. The three-month marathons of the first flow in the "Fast Start" and "Team Power" promos have been completed. Our congratulations to the participants and winners!

To recap, during each of the three months, the partners had to meet the qualification requirements. In "Fast Start" — to invite new investors and achieve the "Specialist" status. In "Team Power" - to increase the number of new investors and partners in the first level of their structure.

A total of 455 partners from 20 countries took part in the promotions. Every fourth of them demonstrated good results. During the summer, they invited 436 new investors and 47 new partners with income to the project.

Six of the most persistent and determined ones were able to qualify and reach the finals. We are sincerely proud of the results they have demonstrated!

The finalists of the "Fast Start" promo are:
Stanislaus Suka Honing (Indonesia),
Namoijam Rishikanta Singh (India),
Sangita Madhao Gurnule (India),
Rafael Boli Ruing (Indonesia),
Liza Michelle Flores Madrid (Honduras).

Each of them has invited 22 new investors to the project and each will receive as a bonus:
a paid package of investment shares worth $ 1,000;
+1 % to the referral remuneration in the first level.

The finalist of the "Team Power" promo did not just complete the qualification. He raised the bar much higher, invited 2 times more investors than required, and almost 4 times more partners.

Ly Phan Thi Khanh (Vietnam). +30 new investors and +11 new partners.

For his fantastic activity, the finalist of the "Team Power" receives:
a paid $ 1,000 investment package;
plus 2 % to the referral remuneration in the second level.

All the finalists of the promotions will be invited to an online meeting, where they will be able to communicate with the leaders in an informal setting, tell about their experience of participating in the promo and directly ask questions to the management. Their stories will be included in our new project "The Book of Success Stories". And we will definitely share them with you.

The result of the first promos flow is a great incentive for the participants of the ongoing second and third flows, whom we are also supporting. We wonder if they will be able to raise the bar even higher? We are sure that this is possible, and we wish success to all the partners who have accepted this challenge!
​​📌 Week results in the project "Duyunov's motors"

Last week the construction of the "Sovelmash" design and engineering technology department continued at the construction site in "Technopolis "Moscow".

-The erection of metal structures for the future office and amenity building started.
- The formation of staircases was carried out, including: reinforcement strapping, installing removable formwork, preparations for casting concrete.
- Roofing work started in the testing and production area.
- The earthwork continued: layout of the sewage system along with testing individual sections for leaks.
- Unloading of construction materials.

The "Sovelmash" specialists compared two angle grinders (UShM): a standard one by "Interskol" with a commutator motor and the same UShM modernized by applying the combined winding "Slavyanka" technology. The comparative tests revealed that the "Slavaynka" based UShM cuts metal faster, is more comfortable to operate due to a lower noise and vibration level.
Watch the test video here - https://youtu.be/7LfZLwJakGA

A national representative office of SOLARGROUP opened in Italy: the 16th in the world and the 6th in Europe. To celebrate this event, an online conference was held with the participation of the company's top managers and leading partners as well as the top officials of the project. The audience was addressed by: Pavel Filippov, Pavel Shadskiy, Victor Arestov, Andrey Lobov. As well as Birdi Gulshan Kumar, who has become the national partner of SOLARGROUP in Italy. We will tell you more about the event in the coming days. Follow the project news!
​​📌 Standard UShM and UShM with "Slavyanka": comparing the noise level and cutting speed

"Sovelmash" compared two angle grinders: a standard one by "INTERSKOL" with a commutator motor and the same UShM by "INTERSKOL", but with a replaced electric motor developed by "Sovelmash" by applying the combined winding "Slavyanka" technology.

The test was carried out under the same conditions: the same material was used for cutting, the same size disc was used for cutting. The "Slavyanka" assembly version of the angle grinder has a slower disc rotation speed than the standard UShM, but despite this, the cutting speed of "Slavyanka" is higher.

Also, the test revealed that the "Slavyanka" based angle grinder operates more smoothly than the standard motor machine, and the noise level of the "Slavyanka" based grinder is much lower.

To find out more, watch the video!

Please subscribe to the channel and follow the updates — the story is to be continued soon!
​​📌 SOLARGROUP's national representative offices in Italy and Nepal opened

Within a week, SOLARGROUP opened national representative offices in two parts of the world at once.
On August 28 - in Nepal.
On September 4 - in Italy.
Both countries are in the top ten by investments in the project "Duyunov's motors". Birdi Gulshan Kumar, who also represents SOLARGROUP in India, became the national partner in each of them.

Online conferences dedicated to the project "Duyunov's motors" were held to mark the opening of the representative offices. The participants of the events were addressed by: the top managers at SOLARGROUP Pavel Shadskiy and Pavel Filippov, the national partner Gulshan Kumar Birdi, CEO of ASPP Weihai Victor Arestov, representative of "STIIN" Andrey Lobov.

From them, the audience of the conferences learned key information about the project and the progress of erecting the "Sovelmash" engineering center, the latest developments of transport by applying the "Slavyanka" technology and profitable offers for investors. Besides, the participants were able to ask their questions online to the top officials and get answers to them.

During the first day, more than 1,200 people watched the online conference in Nepal, and more than 200 participants in Italy.

The national and leading partners in these countries will continue to work actively. SOLARGROUP's experience has shown that wherever the national representative offices are opened, the interest and investments in the project increase considerably.

In total, national representative offices have been opened in 18 countries around the world, five of them — this year. The plan is to continue until the end of 2021.
​​📌 German businessmen learned about the project "Duyunov's motors"

The project "Duyunov's motors" was presented on August 22 at a meeting of entrepreneurs in Geseke, Germany. The presentation was held by the national leader of SOLARGROUP in Germany Johann Butschbach and the company's leading partner Vadim Zhitko.

The event was organized by the European Business Projects Agency that unites the representatives of various projects and companies in order to connect, exchange experience and establish business ties. The last meeting was the first one since December 2019, after the pandemic started. About 20 representatives of various business areas took part in it.

Johann Butschbach and Vadim Zhitko told the audience about the project "Duyunov's motors" and answered their questions, which mainly related to the peculiarities of investing. The participants of the meeting exchanged contacts for further cooperation.

We should add that, in addition to participating in offline events, SOLARGROUP's leading partners in Germany are successfully developing the project online.

Here are the most significant results of this work.

Germany is one of the first countries in the world to open SOLARGROUP's national representative office (in autumn 2019).
Webinars in German for investors, partners and new participants are held weekly.
Among all the countries, Germany ranks 5th in terms of investments in the project.

In July 2021, the national partner Johann Butschbach visited the construction site in Moscow where the "Sovelmash" D&E is being built and personally talked with Dmitriy Duyunov. This trip, as well as the meeting with the business representatives, was an excellent impetus to continue the active work of the German partners aimed at attracting investments in the project.
​​📌 Equipment to create the automated production line for motors with "Slavyanka" has been delivered to Moscow

Despite the delivery difficulties, including the restrictions associated with the Covid-19 pandemic, the equipment for the "Sovelmash" design and engineering technology department (D&E) arrived in Moscow and will soon be delivered to the company's leased premises in Zelenograd.

As we have stated in previous posts, this equipment for the "Sovelmash" production line consists of a number of units, namely:
1. a machine for insulating slots of electric motor stators;
2. an automated machine for winding coil groups of electric motor stators;
3. machines for retracting winding coils into the slots of electric motor stators;
4. machines for forming the frontal parts of winding:
machine for flaring the frontal parts,
intermediate molding machine,
final molding machine;
5. a machine for banding and binding the frontal parts of stator winding.

This equipment will make it possible to create a production line for electric motors; among other things, this equipment will be capable of producing motors of energy efficiency class IE3 and IE4 with the mass dimensions of energy efficiency class IE1 motors, which is especially important in view of the requirements for energy efficiency of technical devices in Russia and the EU.
Commercialization of the "Slavyanka" technology through motor development is a complex product that includes: preparation of the terms of reference, creation of a motor prototype, testing, automated production of a small-scale pilot batch, installation of equipment for mass production at the customer's site, equipment adjustment, preparation of necessary tooling for specific motor dimensions, etc.
The purchased equipment is necessary precisely for testing the entire technological workflow of producing electric rotating machines. As a result, a potential customer will receive a ready-made and well-established automated production line capable of producing serial batches of motors.
All the processes in the company, including those related to the D&E construction, are proceeding in accordance with the plan. Of course, real life makes its adjustments, but any large-scale project at different stages of its development undergoes certain difficulties that unite and make the team even stronger and more solid.
Thank you for being with us! It's time to consolidate your position by purchasing a new investment package in the project!
​​📌 How the angle grinders are tested

Recently we have posted a video demonstrating the cutting speed of two angle grinders (UShM): a standard one by "INTERSKOL" with a commutator motor and the same grinder by "INTERSKOL" with a replaced electric motor developed by "Sovelmash" by applying the combined winding "Slavyanka" technology.

In the new video, the head of the information and analytics department Alexander Sudarev will talk about the technology of testing angle grinders.
The angle grinders are tested on the test bench with the help of the hardware and software complex, some specially designed tooling is used, the UShM is connected to the small load machine with air cooling, special couplings are used, a strain gauge sensor is connected and then the information is transmitted to the measuring stand from where it goes to the computer screen through the software specially developed by the "Sovelmash" specialists.

You will find out what the equipment and tools for testing angle grinders look like in this video!
​​📌Include a gift of 200 shares in the referral link: new feature in the back office

Do you support the project "Duyunov's motors", want to increase your partner structure and get more investment shares?
Generate your referral link with a gift and invite to the project with it. After the invitee registers in the back office, you will both receive 200 investment shares.

👉How to create a referral link with a gift

Go to the "For Partners" section in the back office, the "Referral Links" subsection, the "Link Generation" tab.
First, check the box next to the "Gift Link" option.
Then fill in the required fields to generate the link.
Find the created link in the same tab, under the generation form. You can copy it by clicking the corresponding icon located to the right of the link. You can also delete the generated link there.

👉 How to share the link

Publish a post on your page, for example, with the news about the "Sovelmash" D&E construction, using information from the official project sources. In the post, add a call from yourself to register in the back office and get bonus shares, and place a referral link next to it.

By clicking on the link, a person will get to the back office login page, where they will see a banner with an invitation to register in the back office and receive 200 investment shares as a gift.

👉 How to get the gift shares

After the registration is completed, the new project participant will be assigned to the first level of your partner structure. Each of you will be credited 200 investment shares.

The gift shares will be permanently assigned to you only if the participant passes verification within 30 calendar days after the registration, otherwise the shares will be cancelled. Explain this to the person you invite.

Within a month, an unlimited number of new participants can be registered using a referral link with a gift. In addition to this offer, the project also has the standard option "Gift to a friend" on the main page of the back office.

Use the new feature to increase the number of your shares, expand the first level of the partner structure and help promote the project!
​​📌 Week results in the project "Duyunov's motors"

On the construction site in the SEZ "Technopolis "Moscow", the construction of the "Sovelmash" design and engineering technology department is progressing in accordance with the established procedure. This week, the following activities continued:

- installation of metal structures for the office and amenity building,

- casting of staircases,

- roofing work,

- preparation of the warehouse for accepting the enclosing structures and much more. ⠀

Equipment for setting up the automated production line to make the "Slavyanka"-based motors has been delivered to the "Sovelmash" territory in Zelenograd. Despite the difficulties and delays in delivery from China due to Covid-19 restrictions, the equipment for the "Sovelmash" D&E has arrived at the prepared premises. The installation process will begin soon.

The "Sovelmash" specialists continued work on the modernization of the Milwaukee angle grinder (UShM). The factory commutator motor was replaced with an induction electric motor based on the "Slavyanka" combined winding technology manufactured by "Sovelmash". After that, the motor tests began.
​​📌 Equipment for the automated production line has been delivered to "Sovelmash" ⠀

We are happy to inform all the project participants of the good news! On September 11, the equipment purchased in China to set up the automated line for the production of electric motors was dlivered to the leased premises of "Sovelmash" in Zelenograd.

The automated line is necessary for testing the entire technological production workflow for electric rotating machines. This, in turn, is one of the tasks for achieving the project goal: commercialization of the "Slavyanka" technology through development of electric motors. We wrote more about this here - https://reg.solargroup.pro/en/site/newsinfo/1995

To recap, the production line equipment comprises a number of machines, namely:

1. a machine for insulating slots of electric motor stators;
2. an automated machine for winding coil groups of electric motor stators;
3. a machine for retracting winding coils into the slots of electric motor stators;
4. machines for forming the frontal parts of winding:
- a machine for flaring the frontal parts,
- an intermediate molding machine,
- a final molding machine;
5. a machine for banding and binding the frontal parts of stator winding.

New premises were leased and renovated for the equipment. After installing the production line, the premises are to be used for training the specialists who will daily operate the new equipment. Here the work methodologies will be elaborated, programs created, equipment optimized, debugged, necessary tooling created, motor prototypes produced, including small batches, which will clearly demonstrate the capabilities of automated production for certain motor models by applying the combined winding technology "Slavyanka".

The purchased equipment will make it possible to produce motors of energy efficiency classes IE3 and IE4 in the weight and dimensions of energy efficiency class IE1 motors. This is especially relevant in view of the requirements for energy efficiency of technical devices in Russia and the EU.

The work performed in this direction by the "Sovelmash" specialists will make it possible to reach the operating capacities in the shortest possible time after the D&E is put into operation.

https://youtu.be/hVyQyfkcQZ0
📌All offers for investors in one place: new section "Promo offers for investors" in the back office

Do you want to be updated on the current special offers and invest in the project with maximum benefits? A new section has appeared in the back office where all the current offers are collected.

To open the section, click "Promotions" in the main page menu of the back office. In the window that opens, select "For Investors". Or follow the link https://reg.solargroup.pro/en/promo/materials .

You will see the list of all special offers for investors that are currently available in the project. By clicking on the short description of the offer, you open a page with details, where you will learn:
🔺terms of the offer,
🔺benefits from using it,
🔺the validity period of the offer.

After clicking the button in the description text, you will immediately be directed to the page where you can use the offer. This is convenient: you do not need to spend time searching for the right offer in the back office.

We recommend each participant of the project to view the section. Thanks to the information it contains
🔺the beginners will be able to invest on the most beneficial current conditions,
🔺the investors will learn the most profitable way to increase the number of their shares,
🔺the partners will receive a convenient tool for working with investors and attracting investments in the project.

The new section "Promotions for investors" is available in all languages of the back office. We remind you that earlier the section named "Promo offers for partners" appeared in the back office, which will be useful to everyone who wants to develop their partner business.

Study, use, share information with the other project participants!
​​📌All offers for investors in one place: new section "Promo offers for investors" in the back office

Do you want to be updated on the current special offers and invest in the project with maximum benefits? A new section has appeared in the back office where all the current offers are collected.

To open the section, click "Promotions" in the main page menu of the back office. In the window that opens, select "For Investors". Or follow the link https://reg.solargroup.pro/en/promo/materials .

You will see the list of all special offers for investors that are currently available in the project. By clicking on the short description of the offer, you open a page with details, where you will learn:
🔺terms of the offer,
🔺benefits from using it,
🔺the validity period of the offer.

After clicking the button in the description text, you will immediately be directed to the page where you can use the offer. This is convenient: you do not need to spend time searching for the right offer in the back office.

We recommend each participant of the project to view the section. Thanks to the information it contains
🔺the beginners will be able to invest on the most beneficial current conditions,
🔺the investors will learn the most profitable way to increase the number of their shares,
🔺the partners will receive a convenient tool for working with investors and attracting investments in the project.

The new section "Promotions for investors" is available in all languages of the back office. We remind you that earlier the section named "Promo offers for partners" appeared in the back office, which will be useful to everyone who wants to develop their partner business.

Study, use, share information with the other project participants!
​​📌 "Sovelmash" D&E construction panorama appeared on "Yandex. Maps"

Now everyone can view the site where the "Sovelmash" design and engineering technology department is being built online in detail. Its panoramic picture is available here - https://yandex.com/maps/-/CCUmbCweGB

The enterprise where energy-efficient motors with the "Slavyanka" combined winding will be developed is being built on the territory of the special economic zone "Technopolis "Moscow", site number 16 of the "Alabushevo" site.

The planned completion date of the "Sovelmash" D&E construction and the state commission of the facility is July 2022.

You can monitor the construction progress in weekly videos posted on our official channels. Follow the project news!
​​📌 Construction site news: the last column for the "Sovelmash" innovative center has been installed | Day 99

A significant event at the construction site where the "Sovelmash" innovative center is being built — the last column of the office and amenity building has been installed, and there are only a few hours left before the moment when it will be possible to say: "The installation of the supporting frame for the "Sovelmash" design and engineering technology department has been completed!"

Enjoy watching!

Follow our official channels and stay tuned for the company's news!