๐‚๐จ๐ง๐ฌ๐ญ๐ซ๐ฎ๐œ๐ญ๐ข๐จ๐ง ๐“๐ž๐œ๐ก๐ง๐จ๐ฅ๐จ๐ ๐ฒ & ๐Œ๐š๐ง๐š๐ ๐ž๐ฆ๐ž๐ง๐ญ
1.4K subscribers
93 photos
13 videos
30 files
19 links
Welcome to Construction technology & Mgt ๐Ÿ“ | Your hub for civil engineering insights, construction tips, and industry updates. Building knowledge, one post at a time!"

Contact Via @Selamawiit12

Join us
Download Telegram
๐Ÿ”ด ๐Ÿ”ด แ‹จG+1 แˆ…แŠ•แƒ แŒแŠ•แ‰ฃแ‰ณ แ‹จแˆตแˆซ แˆแˆแ‹ต แˆˆG+15 แˆ…แŠ•แƒ แŒแŠ•แ‰ฃแ‰ณ แŒจแˆจแ‰ณ แ‹จแˆตแˆซ แˆแˆแ‹ตแАแ‰ต แˆ˜แ‹ซแ‹ แŠฅแŠ•แ‹ฐแˆšแ‰ฝแˆ แ‹ซแ‹แ‰ แŠ–แˆซแˆ? ๐Ÿ”ด๐Ÿ”ด

แ‰ แŒแ‹ฐแˆซแˆแŠ“ แŠ แ‹ฒแˆต แŠ แ‰ แ‰ฃ แŠจแ‰ฐแˆ› แ‹จแŒแ‹ฅ แˆ˜แˆ˜แˆชแ‹ซแ‹Žแ‰ฝ แˆ‹แ‹ญ แˆˆแˆ˜แŠ•แŒˆแ‹ตแŠ“ แˆ…แŠ•แƒ แ•แˆฎแŒ€แŠญแ‰ถแ‰ฝ แ‹จแŒแŠ•แ‰ฃแ‰ณ แˆตแˆซ แ‹จแˆšแ‹ˆแ‹ณแ‹ฐแˆจแ‹ แ‹จแŠ แŒˆแˆญ แ‹แˆตแŒฅ แˆตแˆซ แ‰ฐแ‰‹แˆซแŒญ แ‰ แˆšแˆ†แŠ•แ‰ แ‰ต แŒŠแ‹œแฃ แˆŠแˆฐแˆซ แŠจแ‰ณแˆฐแ‰ แ‹ แˆตแˆซ แ‰ แŠ แŠ•แ‹ต แ‹ฐแˆจแŒƒ แ‹แ‰… แ‹ซแˆˆ แˆแˆแ‹ต แ‰ฐแ‰€แ‰ฃแ‹ญแАแ‰ต แ‹ญแŠ–แˆจแ‹‹แˆแข แˆˆแˆแˆณแˆŒแก
๐ŸŸข แ‰ แŠ แ‹ฒแˆต แ‹จแŒ แŒ แˆญ แˆ˜แŠ•แŒˆแ‹ต แŒแŠ•แ‰ฃแ‰ณ แˆตแˆซ แ‹ˆแ‹ญแˆ แ‰ แˆ˜แŠ•แŒˆแ‹ต แ‹ฐแˆจแŒƒแ‹Žแ‰ฝ แˆ›แˆปแˆปแ‹ซ แ•แˆฎแŒ€แŠญแ‰ถแ‰ฝ แ‹จแ‰ฐแŒˆแŠ˜ แ‹จแˆ˜แŠ•แŒˆแ‹ต แŒแŠ•แ‰ฃแ‰ณ แˆตแˆซ แˆแˆแ‹ต แŠจแŠ แˆตแ‹แˆแ‰ต แŠฎแŠ•แŠญแˆชแ‰ต (Asphalt Concrete) แ‰ แˆตแ‰ฐแ‰€แˆญ แˆˆแŠ แˆตแ‹แˆแ‰ต แ‹จแˆ›แˆแ‰ แˆต แˆตแˆซ (for asphalt surfacing) แˆˆแˆ˜แ‹ˆแ‹ณแ‹ฐแˆญ
๐ŸŸก แˆ›แŠ•แŠ›แ‹แˆ แ‹จแŠ แˆตแ‹แˆแ‰ต แˆตแˆซ (DBST/TST/AC) แ‹ˆแ‹ญแˆ แŠฅแŠ•แ‹ฐ แŠ แ‹จแˆญ แˆ˜แŠ•แŒˆแ‹ต แ‹ซแˆ‰ แˆŒแˆŽแ‰ฝ แ‰ฐแˆ˜แˆณแˆณแ‹ญ แ‹จแˆ˜แŠ•แŒˆแ‹ต แŒแŠ•แ‰ฃแ‰ณ แˆตแˆซแ‹Žแ‰ฝ แˆ‹แ‹ญ แ‹จแ‰ฐแŒˆแŠ˜ แˆแˆแ‹ต แˆˆแŠ แˆตแ‹แˆแ‰ต แŠฎแŠ•แŠญแˆชแ‰ต (Asphalt Concrete) แ•แˆฎแŒ€แŠญแ‰ถแ‰ฝ
๐Ÿ”ต แˆˆแˆ…แŠ•แƒ แŒแŠ•แ‰ฃแ‰ณ แˆฅแˆซ แ‹จแˆšแŒ แ‹จแ‰€แ‹ แ‹แ‰…แ‰ฐแŠ› แˆ˜แˆตแˆแˆญแ‰ต แˆŠแˆฐแˆซ แŠจแ‰ณแˆฐแ‰ แ‹ แ‹จแˆ…แŠ•แƒ แˆตแˆซ แ‰ แŠ แŠ•แ‹ต แ‹ฐแˆจแŒƒ แ‹แ‰… แ‹ซแˆˆ แˆ˜แˆ†แŠ• แŠ แˆˆแ‰ แ‰ต( แˆˆแˆแˆณแˆŒ แ‰ แŠ แАแˆตแ‰ฐแŠ› แˆ…แŠ•แƒ (<G+5) แˆตแˆซ แˆแˆแ‹ต แ‹ซแˆˆแ‹ แ‹จแŠ แŒˆแˆญ แ‹แˆตแŒฅ แˆตแˆซ แ‰ฐแ‰‹แˆซแŒญ แˆˆแˆ˜แŠซแŠจแˆˆแŠ› (G+5 to15) แˆ…แŠ•แƒ แŒแŠ•แ‰ฃแ‰ณ แˆตแˆซ แ‰ฐแ‰€แ‰ฃแ‹ญแАแ‰ต แ‹ญแŠ–แˆจแ‹‹แˆแข

Key Note: แŒจแˆจแ‰ณแ‹แŠ• แ‹ซแ‹ˆแŒฃแ‹ แ‰ฐแ‰‹แˆแˆ แˆ†แА แ‰ฐแ‹ˆแ‹ณแ‹ณแˆช แ‹จแˆตแˆซ แˆแˆแ‹ต แˆ˜แˆตแˆแˆญแ‰ฑ แ‰ แ‹šแˆ… แˆ˜แˆแŠฉ แŠซแˆแ‰ฐแ‰€แˆ˜แŒ  แˆ›แˆตแ‰ฐแŠซแŠจแˆ แ‹ˆแ‹ญแˆ แŠฅแŠ•แ‹ฒแˆตแ‰ฐแŠซแŠจแˆ แˆ›แˆตแ‹ฐแˆจแŒ แ‹ญแŒˆแ‰ฃแˆแข
โค1
แ‹จแ‹แŒช แ‰€แˆˆแˆ แ‰ แ‹แ‹ต แ‹‹แŒ‹ แŒˆแ‹แ‰ผ แˆžแ‹ซแ‰ฐแŠ› แˆฅแˆซแ‹แŠ• แ‰ขแ‹ซแ‰ แˆ‹แˆฝแ‰ฅแŠแˆต แ‹จแˆšแˆ แˆตแŒ‹แ‰ต แ‰ฅแ‹™ แŒŠแ‹œ แŠจแ‰ฃแˆˆแ‰คแ‰ต แ‹ญแАแˆณแˆ แกแก
๐Ÿ”ดแ‹ญแˆ…แŠ• แˆฅแŒ‹แ‰ต แˆˆแˆ˜แ‰…แˆจแ แŠฅแАแ‹šแˆ…แŠ• 3 แˆ˜แˆฐแˆจแ‰ณแ‹Š แАแŒˆแˆฎแ‰ฝ แŠ แ‹ตแˆญแŒ‰
๐Ÿ‘‰1. แ‹จแˆแ‰ณแˆฐแˆฉแ‰ตแŠ• แˆžแ‹ซแ‰ฐแŠ› แ‰ แŒฅแŠ•แ‰ƒแ‰„ แˆแˆจแŒก แก
โญ•๏ธแˆแˆแ‹ต แ‹ซแˆˆแ‹ แˆ˜แˆ†แŠ‘แŠ• แ‹จแˆฐแˆซแ‰ธแ‹แŠ• แˆฅแˆซแ‹Žแ‰ฝ แ‰ แˆ›แ‹จแ‰ต แŠ แˆจแŒ‹แŒแŒก
โญ•๏ธแˆตแАแˆแŒแ‰ฃแˆญ แ‹ซแˆˆแ‹ แˆ˜แˆ†แŠ‘แŠ• แŠฅแˆญแŒแŒ แŠ› แˆแŠ‘
โญ•๏ธแ‹จแˆซแˆฑแŠ• แ‰ฅแ‰ป แˆณแ‹ญแˆ†แŠ• แ‹จแŠฅแŠ“แŠ•แ‰ฐแŠ•แˆ แˆƒแˆณแ‰ฅ แ‹จแˆšแ‰€แ‰ แˆ แˆ˜แˆ†แŠ‘แŠ• แ‹ซแˆจแŒ‹แŒแŒก

๐Ÿ‘‰2. Sample/แŠ“แˆ™แŠ“ แŠฅแŠ•แ‹ฒแˆฐแˆซแˆ‹แ‰ฝแˆ แŠ แ‹ตแˆญแŒ‰
โญ•๏ธแˆ™แˆ‰ แˆˆแˆ™แˆ‰ แ‹ˆแ‹ฐแˆฅแˆซ แŠญแˆ˜แŒแ‰ฃแ‰ฑ แ‰ แŠแ‰ต แˆณแˆแ•แˆ แ‰ แ‰ตแŠ•แˆฝ แ‰ฆแ‰ณ/แŒแ‹ตแŒแ‹ณ แˆ‹แ‹ญ แˆ™แˆ‰ แˆ„แ‹ฐแ‰ฑแŠ• แˆฐแˆญแ‰ถ แ‹จแˆ˜แŒจแˆจแˆป แŒˆแŒฝแ‰ณแ‹ แˆแŠ• แŠฅแŠ•แ‹ฐแˆšแˆ˜แˆตแˆ แˆˆแŠ“แŠ•แ‰ฐ แˆ›แˆณแ‹จแ‰ต แ‹ญแŠ–แˆญแ‰ แ‰ณแˆแข แŠซแˆแ‰ฐแˆ˜แ‰ปแ‰น แŠฅแŠ•แ‹ฒแ‰€แ‹ญแˆญ แŠซแˆแ‰ปแˆˆ แ‹ฐแŒแˆž แˆŒแˆ‹ แˆ™แ‹ซแ‰ฐแŠ› แˆ›แˆแŒฃแ‰ต แ‹ญแŠ–แˆญแ‰ฃแ‰ฝแŠ‹แˆแข
๐Ÿ‘‰3. แˆฅแˆซแ‹แŠ• แ‹จแˆšแŠจแ‰ณแ‰ฐแˆแˆ‹แ‰ฝแˆ แ‰ฃแˆˆแˆ™แ‹ซ แ‹ซแˆตแˆแˆแŒ‹แ‰ฝแŠ‹แˆแข
โญ•๏ธแ‹จแˆšแˆฐแˆซแ‹แŠ• แˆฅแˆซ แŠฅแŠ“แŠ•แ‰ฐ แˆ˜แŠจแ‰ณแ‰ฐแˆ แŠซแˆแ‰ปแˆ‹แ‰ฝแˆ แˆตแˆˆแ‰€แˆˆแˆ แŠฅแ‹แ‰€แ‰ต แ‹ซแˆˆแ‹ แ‰ฃแˆˆแˆ™แ‹ซ/ แˆ˜แˆƒแŠ•แ‹ฒแˆต แˆ˜แ‹ตแ‰ฃแ‰ฝแˆ แŠฅแ‹ซแŠ•แ‹ณแŠ•แ‹ณแŠ•แ‹ฑแŠ• แˆ‚แ‹ฐแ‰ต แŠฅแŠ•แ‹ฒแŠจแ‰ณแ‰ฐแˆแˆ‹แ‰ฝแˆ แˆ›แ‹ตแˆจแŒ แ‹ญแŠ–แˆญแ‰ฃแ‰ฝแŠ‹แˆแข
๐ŸŸ แ‰คแ‰ณแ‰ฝแˆแŠ• แ‰€แˆˆแˆ แˆ›แˆตแ‰€แ‰ฃแ‰ต แŠซแˆฐแ‰ฃแ‰ฝแˆ แ‰ แˆณแ‹ญแ‰ต แŠฅแŠ•แŒ‚แАแˆญ แ‹จแˆšแˆ˜แˆฉ แ‰ฃแˆˆแˆ™แ‹ซแ‹Žแ‰ฝแŠ• แ‹ญแ‹˜แŠ• แ‰ แˆ™แ‹ซแ‹Š แˆฅแАแˆแŒแ‰ฃแˆญแŠ“ แ‰ แŠจแแ‰ฐแŠ› แŒฅแˆซแ‰ต แ‰ แ‰ฐแˆ˜แŒฃแŒฃแŠ แ‹‹แŒ‹ แŠฅแŠ•แ‹ตแŠ•แˆฐแˆซแˆ‹แ‰ฝแˆ แŠจแˆแˆˆแŒ‹แ‰ฝแˆ แ‰ 0910734529 แ‹ญแ‹ฐแ‹‰แˆ‰แˆแŠ•
โค2
๐Ÿ”คThe process of constructing a building or a bridge does not happen in a factory under controlled conditions.

๐ŸฉธThe success of any construction project isnโ€™t just about materials or machines โ€” it's about people.

๐ŸฉธItโ€™s the engineers, site supervisors, foremen, and workers who turn a dream into a finished building.

๐ŸฉธUnlike factory work, construction happens in unpredictable environments โ€” with changing weather, site challenges, and safety risks.

๐ŸฉธThatโ€™s why the decision-making and problem-solving skills of the construction management team are critical.

๐ŸฉธAt the end of the day, a successful project is the result of a strong, smart, and committed team on the ground. ๐Ÿ’ช๐Ÿ‘ทโ€โ™‚๏ธ๐Ÿ‘ทโ€โ™€๏ธ
@Constructionzone
โค1
๐Ÿ— Construction Tip of the Day:
What Is a Plumb Line?


A plumb line is a simple but powerful tool used to check vertical alignment in construction.

๐Ÿ“ Itโ€™s made of a string with a weight at the bottom (called a plumb bob).
๐Ÿ“Œ When suspended, gravity pulls it straight โ€” giving a true vertical reference.

๐Ÿ”ง Used For:

Ensuring walls are perfectly vertical

Aligning door and window frames

Setting columns and formworks

โœ… Why it matters:
Even small deviations from vertical can cause structural problems, misalignment, or cracking over time.

Master the plumb line = Master precision.
Simple tools, powerful results.

@constructionzone
๐Ÿ‘1
๐Ÿ“š Construction Tip of the Day:

๐Ÿ”ถ What Is Curing in Concrete?

Curing is one of the most important steps after concrete placement โ€” but often overlooked!

๐Ÿงฑ What is it?
Curing is the process of maintaining moisture in concrete after it has been poured to ensure proper strength development.

โœ… Why is it important?

๐Ÿ”ถPrevents cracks due to early drying

๐Ÿ”ถImproves durability

๐Ÿ”ถEnsures full strength is achieved

๐Ÿ”ถReduces surface dusting and shrinkage

๐Ÿ•’ Standard curing time is 7 to 14 days, depending on the mix and weather.

๐Ÿ’ก Tip: Cover your concrete with plastic sheets or wet burlap, or keep it moist by regular watering.

๐Ÿ”ถProper curing = Long-lasting structure!

Share to help someone new in construction learn the basics.

@constructionzone
โค3๐Ÿ‘3
๐Ÿ“š Construction Tip of the Day:

What Is Formwork?


๐Ÿ”ด Formwork is the temporary mold into which concrete is poured and shaped until it hardens.

๐Ÿ›  Types of Formwork:

Timber formwork โ€“ easy to shape, affordable

Steel formwork โ€“ reusable, durable, and gives a smooth finish

Plastic formwork โ€“ lightweight and best for repetitive structures

โœ… Why itโ€™s important:

๐ŸŸ  Defines the shape and size of concrete elements

๐ŸŸ  Ensures safety during pouring

๐ŸŸ  Affects the quality of surface finish

๐ŸŸ Influences the speed and cost of the project

๐Ÿ’ก Tip: Always oil the formwork before pouring to prevent sticking and ensure easy removal!

Strong formwork = Strong and accurate structure.

@Constructionzone
Share for your friend who is new for construction.
โค2๐Ÿ‘1
๐Ÿ“š Construction Tip of the Day

What Is a Footing Pad?

A footing pad (also called an isolated footing) is the base of a column โ€” it spreads the load from the column into the soil.

๐Ÿ— Used when:

๐Ÿ”ถ The building has columns that carry concentrated loads

๐Ÿ”ถ The soil bearing capacity is sufficient

๐Ÿ”ถ Load is not shared between multiple columns

๐Ÿ”ง Key Features:

๐Ÿ”ถ Usually square or rectangular in shape

๐Ÿ”ถ Made from reinforced concrete

๐Ÿ”ถ Size depends on load and soil strength

โœ… Why it matters:

๐Ÿ”ถ Prevents settlement or sinking

๐Ÿ”ถ Distributes weight evenly

๐Ÿ”ถ Ensures stability of the entire structure

๐Ÿ’ก Tip: Always ensure proper compaction under the footing and check reinforcement placement before pouring concrete!

๐Ÿ”ด A strong structure starts from the ground โ€” and footing pads are the first step.


๐Ÿ‘ท๐Ÿพโ€โ™€๏ธ Found this helpful? Share with a friend whoโ€™s studying engineering or working on site!

@constructionzone
โค7
๐Ÿ”จ Construction Tip of the Day

๐Ÿ‘‰Check Levels Twice โ€“ Pour Once!


๐Ÿงถ Before pouring concrete, always double-check your formwork levels using a spirit level or laser level.
A small mistake in level can lead to costly rework, uneven floors, and drainage issues.

๐Ÿ”‘ Mark critical points clearly
๐Ÿ”‘Reconfirm slope for slabs and drainage
๐Ÿ”‘Make sure all workers are aware of the benchmark

๐Ÿง  "Measure twice, pour once!"

๐Ÿ“ค Share with your crew or construction buddies!

@Constructionzone
๐Ÿ‘2โค1
๐Ÿงฑ Construction Tip of the Day
Handle Blocks Right โ€“ Build Strong Walls!


๐ŸŸ Proper block laying is key to the strength, alignment, and durability of any masonry wall.

โœ… Start with a solid and level foundation
โœ… Soak the blocks briefly before laying (if dry) to prevent moisture loss from the mortar
โœ… Use the right mortar mix (commonly 1:4 or 1:5 cement to sand ratio)
โœ… Always maintain straight lines with a masonโ€™s line
โœ… Stagger joints (like a brick pattern) for better bonding
โœ… Check plumb and level after every 2โ€“3 courses

๐Ÿง  โ€œStrong walls start with careful hands.โ€

๐Ÿ“ค Share this tip with your team and build better together!
@Constructionzone
โค5๐Ÿ‘4
โญ•๏ธ แŒ แ‰ƒแˆš แˆ€แˆณแ‰ฅ โญ•๏ธ
โญ•๏ธแ‰คแ‰ต แŠ แˆฐแˆช แ‹ˆแ‹ญแˆ แ‹จแŠฎแŠ•แˆตแ‰ตแˆซแŠญแˆฝแŠ• แ‰ฃแˆˆแˆ™แ‹ซ แŠจแˆ†แŠ“แ‰น แ‹ญแˆ„แŠ• แˆ›แ‹ˆแ‰… แ‹ˆแ‹ฐแŠแ‰ต แˆŠแŒ แ‰…แˆ›แ‰ฝแˆ แˆตแˆˆแˆšแ‰ฝแˆ
แ‹ญแАแ‰ แ‰ฅ โญ•๏ธ
๐Ÿ—Join For Construction Related Content๐Ÿ—
๐Ÿ‘‡๐Ÿ‘‡๐Ÿ‘‡
๐Ÿ‘‰@Constructionzone
๐Ÿ‘2
โญ•๏ธHow I prepare a price/cost for a project?โญ•๏ธ

When I start pricing a project, I follow a simple principles so nothing slips through: Here we goo

๐Ÿ‘‰1. Understand the design
I go through the drawings and specs first. If I donโ€™t understand the work, the numbers wonโ€™t make sense.

๐Ÿ‘‰2. Break the project into work items
Concrete, masonry, plaster, tiles, paint, etc. I list everything clearly so the BOQ flows in a logical order. You can use sample BoQ

๐Ÿ‘‰3. Take off quantities
I measure all items from the drawings. Accuracy here saves headaches later.

๐Ÿ‘‰ 4. Apply unit rates
I build rates based on:
๐Ÿ”ธ Material price
๐Ÿ”ธ Labor cost
๐Ÿ”ธ Equipment/transport if needed
๐Ÿ”ธSmall overhead allowance

๐Ÿ‘‰I also compare with past projects or market rates to make sure the pricing is reasonable.

6. Add contingency
๐Ÿ”ถConstruction always has surprises. A small buffer keeps your estimate realistic.

๐ŸŸกGood BOQ + clear pricing = confidence before starting work.๐ŸŸก
Join For More
๐Ÿ‘‡๐Ÿ‘‡๐Ÿ‘‡
@constructionzone
โค2
โญ•๏ธ Why Scheduling Matters in Constructionโ“
๐Ÿ‘‰A construction schedule is not just dates on paper. It is a control tool. Without a schedule:
๐Ÿ’โ€โ™‚ Materials arrive late
๐Ÿ’โ€โ™‚Workers wait idle
๐Ÿ’โ€โ™‚Costs increase
๐Ÿ’โ€โ™‚Projects delay
๐Ÿ‘‰A good schedule helps you: ๐Ÿ’โ€โ™‚Control time
๐Ÿ’โ€โ™‚Control cost
๐Ÿ’โ€โ™‚Coordinate trades
๐Ÿ’โ€โ™‚ Predict problems early
๐Ÿ›‘ No schedule = no control๐Ÿ›‘

โญ•๏ธSimple Rule of Good Schedulingโญ•๏ธ

๐Ÿ‘‰A schedule must answer 3 questions:
๐Ÿ’โ€โ™‚What activity?
๐Ÿ’โ€โ™‚When does it start?
๐Ÿ’โ€โ™‚When does it finish?

๐Ÿ›‘If your schedule cannot answer these clearly, itโ€™s useless.
๐Ÿ‘‰Even a simple Excel schedule is better than no schedule.
Join๐Ÿ‘‰ @constructionzone
๐Ÿ‘4โค2
191_แ‹จแŠฎแŠ•แˆตแ‰ตแˆซแŠญแˆฝแŠ•_แˆ›แ‹•แ‹ตแŠ•_แˆแ‰ƒแ‹ต_แŠ แˆแŒปแŒธแˆ_แˆ˜แˆ˜แˆชแ‹ซ_แ‰แŒฅแˆญ_191_2018.pdf
283.2 KB
แ‰ แŠ แ‹ฒแˆต แŠ แ‰ แ‰ฃ
โ€‹แ‰ แŠฎแŠ•แˆตแ‰ตแˆซแŠญแˆฝแŠ• แˆ›แ‹•แ‹ตแŠ• แˆฅแˆซ แˆ‹แ‹ญ
โ€‹แ‹จแ‰ฐแˆฐแˆ›แˆซแ‰ฝแˆ แŠ แˆแˆšแ‹Žแ‰ฝแŠ“ แ‰ฐแ‰‹แˆซแŒฎแ‰ฝ!
โ€‹แˆฐแŠ” 2018
โ€‹แ‹จแ‹ˆแŒฃแ‹แŠ• แŠ แ‹ฒแˆฑแŠ• แˆ˜แˆ˜แˆชแ‹ซ
โ€‹แˆฐแˆแ‰ณแ‰ฝแŠ‹แˆ?
โ€‹แˆตแˆซแ‰ฝแˆ แŠฅแŠ•แ‹ณแ‹ญแˆตแ‰ฐแŒ“แŒŽแˆ
โ€‹แŠฅแАแ‹šแˆ…แŠ• แŠ แˆซแ‰ต แ‹ˆแˆณแŠ แАแŒฅแ‰ฆแ‰ฝ
โ€‹แ‰ แแŒฅแАแ‰ต แŠฅแ‹ˆแ‰!
โ€‹แŠ แŠ•แ‹ฐแŠ›แก แ‹จแˆแ‰ƒแ‹ต แ‹˜แˆ˜แŠ• แŒˆแ‹ฐแ‰ฅ โณ
โ€‹แˆˆแŒฅแ‰แˆญ แ‹ตแŠ•แŒ‹แ‹ญ แˆ›แˆแˆจแ‰ป แˆแ‰ƒแ‹ต
โ€‹แ‰ขแ‰ แ‹› แŠฅแˆตแŠจ แŠ แˆแˆตแ‰ต แ‹“แˆ˜แ‰ตแค
โ€‹แˆˆแŒˆแˆจแŒ‹แŠ•แ‰ฒแฃ แˆˆแŠ แˆธแ‹‹แŠ“ แˆˆแАแŒญ แ‹ตแŠ•แŒ‹แ‹ญ แ‹ฐแŒแˆž
โ€‹แŠฅแˆตแŠจ แˆแˆˆแ‰ต แ‹“แˆ˜แ‰ต แ‰ฅแ‰ป แАแ‹ แ‹จแˆšแˆฐแŒ แ‹แข
โ€‹แ‰ แ‹จแ‹“แˆ˜แ‰ฑ แˆ˜แ‰ณแ‹ฐแˆตแˆ แŠ แˆˆแ‰ แ‰ต!
โ€‹แˆแˆˆแ‰ฐแŠ›แก แŠญแˆแŠญแˆ แ‰€แŒ แŠ“แ‹Žแ‰ฝ ๐Ÿšซ
โ€‹แŠจแ‰คแ‰ตแ‹Ž แ‹ˆแ‹ญแˆ แŠจแŠฎแŠ•แˆตแ‰ตแˆซแŠญแˆฝแŠ• แˆณแ‹ญแ‰ตแ‹Ž แŠ แŒ แŒˆแ‰ฅ
โ€‹แˆ›แˆแˆจแ‰ต แŠ แ‹ญแ‰ฝแˆ‰แˆ!
โ€‹แŠจแˆ˜แŠ–แˆชแ‹ซ แˆ˜แŠ•แ‹ฐแˆญแŠ“ แŠจแŠขแŠ•แ‹ฑแˆตแ‰ตแˆช แ“แˆญแŠญ
โ€‹แŠ แˆแˆตแ‰ต แˆ˜แ‰ถ แˆœแ‰ตแˆญแค
โ€‹แŠจแŠจแแ‰ฐแŠ› แŠคแˆŒแŠญแ‰ตแˆชแŠญ แˆ˜แˆตแˆ˜แˆญ
โ€‹แˆƒแ‹ซ แŠ แˆแˆตแ‰ต แˆœแ‰ตแˆญแค
โ€‹แŠจแ‹ˆแŠ•แ‹ แ‹ณแˆญแ‰ป แ‹ฐแŒแˆž
โ€‹แˆฐแˆ‹แˆณ แˆœแ‰ตแˆญ แŠญแˆแˆ แ‹แˆตแŒฅ
โ€‹แˆ›แ‹•แ‹ตแŠ• แˆ›แˆแˆจแ‰ต แˆ™แˆ‰ แ‰ แˆ™แˆ‰ แŠญแˆแŠญแˆ แАแ‹!
โ€‹แˆฆแˆตแ‰ฐแŠ›แก แŠ แ‹ฒแˆต แˆแ‰ƒแ‹ต แˆˆแˆ›แ‹แŒฃแ‰ต ๐Ÿ“‹
โ€‹แ‰ แŠ แ‹ฒแˆฑ แŠ แˆฐแˆซแˆญ แˆ˜แˆ แˆจแ‰ต
โ€‹แˆ›แˆ˜แˆแŠจแ‰ต แ‹ซแˆˆแ‰ฃแ‰ฝแˆ แ‰ แ–แˆญแ‰ณแˆ แ‰ฅแ‰ป แАแ‹!
โ€‹แ‰ แˆ•แŒ‹แ‹Š แŠ แˆ›แŠซแˆช แ‹จแ‰ฐแŠ“
โ€‹แ‹จแŠ แ‹‹แŒญแАแ‰ต แŒฅแŠ“แ‰ต แŠฅแŠ“
โ€‹แ‹จแŠ แŠซแ‰ฃแ‰ข แ‰ฐแ…แ‹•แŠ– แŒแˆแŒˆแˆ› แˆ›แ‰…แˆจแ‰ฅ
โ€‹แŒแ‹ดแ‰ณแ‰ฝแˆ แАแ‹!
โ€‹แˆˆแ‹ฐแˆจแˆฐ แŒ‰แ‹ณแ‰ต แˆ›แˆตแ‰ฐแŠซแŠจแ‹ซ แ‹จแˆšแˆ†แŠ•
โ€‹แ‹จแ‹แ‹ญแŠ“แŠ•แˆต แ‹‹แˆตแ‰ตแŠ“แˆ
โ€‹แ‰ แ‰ฃแŠ•แŠญ แˆ›แˆตแŒˆแ‰ฃแ‰ต แ‹ญแŒ แ‰ แ‰…แ‰ฃแ‰ฝแŠ‹แˆแข
โ€‹แŠ แˆซแ‰ฐแŠ›แก แ‹จแ‹ตแŠ•แŒ‹แ‹ญ แˆ˜แแŒซ แˆ›แˆฝแŠ–แ‰ฝ โš™๏ธ
โ€‹แ‹จแ‹ตแŠ•แŒ‹แ‹ญ แˆ˜แแŒซ แˆ›แˆฝแŠ•
โ€‹แ‹ˆแ‹ญแˆ แ‰ฃแ‰บแŠ•แŒ แ•แˆ‹แŠ•แ‰ต แˆˆแˆ˜แ‰ตแŠจแˆ
โ€‹แˆแ‰ƒแ‹ต แ‹จแˆšแˆฐแŒ แ‹แค
โ€‹แ‹จแˆ›แ‹•แ‹ตแŠ• แˆ›แˆแˆจแ‰ต แˆแ‰ƒแ‹ต แˆ‹แˆˆแ‹แŠ“
โ€‹แ‰ แŠซแ‰ฃแ‹ แ‹แˆตแŒฅ แ‰ แ‰‚ แ‰ฆแ‰ณ แˆˆแˆŒแˆˆแ‹
โ€‹แˆฐแ‹ แ‰ฅแ‰ป แАแ‹!
โ€‹แ‹จแˆ›แˆฝแŠ• แˆ˜แ‰ตแŠจแ‹ซ แˆแ‰ƒแ‹ฑแˆ
โ€‹แŠจแˆ›แˆแˆจแ‰ป แˆแ‰ƒแ‹ฑ แŒ‹แˆญ แŠ แ‰ฅแˆฎ แ‹ซแ‰ แ‰ƒแˆแข