آشنایی اجمالی با انجمن های متولی و همچنین آمار های کلی در زمینه
"#استاندارد #پیشرو در طراحی #محیطی و #انرژی"
#Leadership in #Energy and #Environmental #Design (#LEED)
"#استاندارد #پیشرو در طراحی #محیطی و #انرژی"
#Leadership in #Energy and #Environmental #Design (#LEED)
دفترچه راهنمای بیم : شهرداری نیویورک
#NEW #YORK #CITY #DEPARTMENT OF #DESIGN+ #CONSTRUCTION #July 2012
#Michael R. #Bloomberg, #Mayor #David J. #Burney, #FAIA, #Commissioner #David #Resnick, AIA, #Deputy #Commissioner
#BIM #Guidelines
@bimiran @ehsan_nayeri
#NEW #YORK #CITY #DEPARTMENT OF #DESIGN+ #CONSTRUCTION #July 2012
#Michael R. #Bloomberg, #Mayor #David J. #Burney, #FAIA, #Commissioner #David #Resnick, AIA, #Deputy #Commissioner
#BIM #Guidelines
@bimiran @ehsan_nayeri
Springtime - time to check office air quality.
#design #technology #interiordesign #BIM
http://ow.ly/4mSaQ6
#design #technology #interiordesign #BIM
http://ow.ly/4mSaQ6
#Design
Design begins with an assessment of needs and continues with a full program of work, cost estimate and schedule. Design itself is accomplished in phases from preliminary to final.
#Procure
Procure encompasses all the activity necessary for identifying, specifying, evaluating, purchasing and delivering the thousands of materials and manufactured products used in a building or infrastructure project.
#Assemble
Assemble replaces construct as modern buildings and infrastructure projects are increasingly assemblies of manufactured products. Assembly includes coordination, scheduling and quality assurance.
#Operate
Operate includes all activity necessary to operate a completed building or infrastructure project including monitoring, maintaining, upgrading and eventually recycling.
The four rings are interlocked in the buildingSMART logo, illustrating the need for interoperability and teamwork between all participants.
Design begins with an assessment of needs and continues with a full program of work, cost estimate and schedule. Design itself is accomplished in phases from preliminary to final.
#Procure
Procure encompasses all the activity necessary for identifying, specifying, evaluating, purchasing and delivering the thousands of materials and manufactured products used in a building or infrastructure project.
#Assemble
Assemble replaces construct as modern buildings and infrastructure projects are increasingly assemblies of manufactured products. Assembly includes coordination, scheduling and quality assurance.
#Operate
Operate includes all activity necessary to operate a completed building or infrastructure project including monitoring, maintaining, upgrading and eventually recycling.
The four rings are interlocked in the buildingSMART logo, illustrating the need for interoperability and teamwork between all participants.
BSI_BS_8536_1_2015.pdf
1.1 MB
#BSI #Standards #Publication
#BS 8536-1:2015
#Briefing for #design and
#construction –
#Part 1: #Code of #practice for #facilities
#management ( #Buildings
#infrastructure)
#BS 8536-1:2015
#Briefing for #design and
#construction –
#Part 1: #Code of #practice for #facilities
#management ( #Buildings
#infrastructure)
BS_8536_2_2016.pdf
730.1 KB
#Briefing for #design and
#construction –
Part 2: #Code of #practice for #asset
#management ( #Linear and
#geographical #infrastructure)
#construction –
Part 2: #Code of #practice for #asset
#management ( #Linear and
#geographical #infrastructure)
BIM Unlimited is an international team of individuals led by a desire to create innovative architecture within a collaborative BIM workflow. A number of the team have previous experience of a Build Live competition. The lead architect #Ruben #Fernandez and his team of architects at #Estudio Caribe have created some sophisticated architectural concepts in previous competitions with complex, non standard geometry and the rest of the multidisciplinary team are once again looking forward to responding to these concepts this time around. The major disciplines within the team use a different primary software within their specialist fields of #Architecture, #Structural #Design and Analysis, #MEP Design, Pedestrian Flow Analysis and Environmental Analysis. They exchange their #BIM #models using #IFC . We look forward to seeing what we can create in the short timeframe allowed. #Hyperloop
Just released Voxel2Gcode v0.1.2 for Grasshopper and Dynamo.
#3dprinting #voxel #code #design #opensource
https://github.com/nonoesp/Voxel2GCode
#3dprinting #voxel #code #design #opensource
https://github.com/nonoesp/Voxel2GCode
Forwarded from عکس نگار
How did GRAPHISOFT go from a start-up in communistera Hungary to a progressive world-leading technology company?
Our latest documentary, shot on location in Budapest, explores the remarkable journey of Gábor Bojár and his team. From the early days developing ARCHICAD, to securing Steve Jobs' backing and the growth of the impressive GRAPHISOFT Park
this is one not to miss!
#graphisoft #archicad #bim #design #software #construction #architect #architecture #tech #hungary ( image courtesy of GRAPHISOFT )
Our latest documentary, shot on location in Budapest, explores the remarkable journey of Gábor Bojár and his team. From the early days developing ARCHICAD, to securing Steve Jobs' backing and the growth of the impressive GRAPHISOFT Park
this is one not to miss!
#graphisoft #archicad #bim #design #software #construction #architect #architecture #tech #hungary ( image courtesy of GRAPHISOFT )
#BSI Introduces #BIM #Kitemark for #Design and #Construction work
thebimcenter.com/2017/03/bsi-introduces-bim-kitemark-for-design.html
thebimcenter.com/2017/03/bsi-introduces-bim-kitemark-for-design.html
Forwarded from BIM Experts
#Design
Design begins with an assessment of needs and continues with a full program of work, cost estimate and schedule. Design itself is accomplished in phases from preliminary to final.
#Procure
Procure encompasses all the activity necessary for identifying, specifying, evaluating, purchasing and delivering the thousands of materials and manufactured products used in a building or infrastructure project.
#Assemble
Assemble replaces construct as modern buildings and infrastructure projects are increasingly assemblies of manufactured products. Assembly includes coordination, scheduling and quality assurance.
#Operate
Operate includes all activity necessary to operate a completed building or infrastructure project including monitoring, maintaining, upgrading and eventually recycling.
The four rings are interlocked in the buildingSMART logo, illustrating the need for interoperability and teamwork between all participants.
Design begins with an assessment of needs and continues with a full program of work, cost estimate and schedule. Design itself is accomplished in phases from preliminary to final.
#Procure
Procure encompasses all the activity necessary for identifying, specifying, evaluating, purchasing and delivering the thousands of materials and manufactured products used in a building or infrastructure project.
#Assemble
Assemble replaces construct as modern buildings and infrastructure projects are increasingly assemblies of manufactured products. Assembly includes coordination, scheduling and quality assurance.
#Operate
Operate includes all activity necessary to operate a completed building or infrastructure project including monitoring, maintaining, upgrading and eventually recycling.
The four rings are interlocked in the buildingSMART logo, illustrating the need for interoperability and teamwork between all participants.