Arun-3 Hydro Electric Project:
Context: Cabinet approves investment proposal for transmission component of Arun-3 Hydro Electric Project (Nepal portion) by Sutlej Jal Vikas Nigam(SJVN) Limited.
Impact: The project will provide surplus power to India strengthening economic linkages with Nepal. The power from the project shall be exported from Dhalkebar in Nepal to Muzaffarpur in India.
The Arun-3 Hydro Electric project (900 MW) is located on Arun River in Sankhuwasabha District of Eastern Nepal.
#currentaffairs for Paper 1
#Environment
@NETGSET
#NET2020
Context: Cabinet approves investment proposal for transmission component of Arun-3 Hydro Electric Project (Nepal portion) by Sutlej Jal Vikas Nigam(SJVN) Limited.
Impact: The project will provide surplus power to India strengthening economic linkages with Nepal. The power from the project shall be exported from Dhalkebar in Nepal to Muzaffarpur in India.
The Arun-3 Hydro Electric project (900 MW) is located on Arun River in Sankhuwasabha District of Eastern Nepal.
#currentaffairs for Paper 1
#Environment
@NETGSET
#NET2020