Mendell Helium #MDH
6 subscribers
4 photos
3 videos
2 files
15 links
Mendell Helium (AQSE: MDH) – Producing from top Kansas wells, including a 5.1% helium strike. With strong infrastructure deals, expansion plans, and even a Bitcoin twist, MDH is ahead in the race for U.S. helium dominance. Join our unofficial MDH channel.
Download Telegram
πŸš€ Mendell Helium (MDH.PL) – Tiny Cap, Big Moves Coming! πŸš€

Why this Β£2.7m microcap is buzzing right now:

πŸ”₯ Nebraska β€œJasper” Well

Drilling NOW, results due end of Aug 2025

Cost < $100k 🀯

Historic test = 94% methane, 950 BTU β†’ perfect for cheap power ⚑

Ideal for Bitcoin mining πŸ’»πŸ’° β†’ scalable to thousands of wells

πŸ’¨ Kansas – Rost Well

Production targeted for early Sept 2025

Revenue: $100k+/month β†’ covers ALL overheads βœ…

Extra cash = new wells + Bitcoin treasury

Costs under budget, more land being leased

πŸ’» Bitcoin Strategy

Smart play: stranded gas β†’ BTC mining πŸ”₯

3 options: buy, lease, or JV (partners already knocking!)

BitGo custody set up β†’ ready to roll

πŸ“ˆ Corporate Catalysts

RTO with M3 Helium + AIM listing in Sept 🎯

Access to producing wells + huge Hugoton field

⚑ Near-term catalysts lined up:

Jasper results (Aug)

Rost production (Sept)

RTO + AIM listing (Sept)

πŸ’Ž With multiple shots on goal + such a tiny cap, even modest success could mean a big re-rate.

πŸ‘‰ Bottom line: This isn’t just words anymore – August & September could be game-changers.
This media is not supported in your browser
VIEW IN TELEGRAM
🚨 Exclusive Mendell Helium Update (MDH.PL) 🚨

πŸ“ Nebraska, USA – The rig has officially arrived to drill the Jasper well! πŸ‡ΊπŸ‡Έ

πŸ› οΈ Drilling expected to be completed by end of August 2025.

πŸ’» Jasper could power a future Bitcoin mining project thanks to its ideal setup (incl. fibre optic cable nearby ⚑).

πŸ‘‰ This is a major near-term catalyst for Mendell β€” drilling underway now, with results just weeks away.

πŸ’Ž With a tiny market cap, even modest success here could be transformational.
πŸ‘1
πŸ“’ Mendell Helium (MDH.PL) – Ops Update

Fort Dodge, Kansas (Rost Well)

πŸ› οΈ Prep for de-watering underway β†’ first ops expected early Sept 2025

βœ… Project under budget

πŸ’¨ Helium tested at 5.1% with low hydrocarbons

πŸ“¦ Off-taker already lined up β†’ helium sales could begin even before PSA connection!

Nebraska (Jasper Well)

🚧 Drilling has started β†’ completion expected end of Aug 2025

πŸ’° Ultra-low cost (< $100k total)

⚑ Fibre optic cable located near site β†’ ideal for Bitcoin mining potential

♻️ Recycled casing sourced β†’ costs cut further

CEO Nick Tulloch:

β€œWe’re on track in both Kansas and Nebraska. The equipment is coming together at Rost, and Jasper drilling is progressing as planned. We’re entering a very exciting phase.”
πŸ‘1
Further update on Fort Dodge & Nebraska operations.pdf
145.2 KB
Quick update on Mendell Helium's M3 Helium ops in Kansas & Nebraska

No bad news here, just solid progress with some typical bumps! Mendell’s got an option to buy M3 Helium, extended to Sept 30, 2025, so they’re taking their time to get it right.

In Fort Dodge, KS, the Rost 1-26 well is almost ready to roll!

De-watering starts this week, with all key gear (separator, pump, PSA unit, compressor) arriving now or soon. They’ve got a buyer ready for the raw helium gas, and once the PSA’s online, they’ll purify it to ~75%. Big revenue potential! CEO’s calling it β€œvery exciting.”

Nebraska’s Jasper well hit snags

Rainy weather and a pesky pump leak slowed drilling. But the team’s back this week with fixed equipment to check the well and add support if needed. These are normal drilling hiccups, and M3’s still pumped about the project’s potential.

Bottom line:

Rost is close to cash flow, and Jasper’s issues are fixable. No red flags, just progress in a promising helium play. Stay tuned!

πŸš€ #MendellHelium
⚑ Not all bad here, team. Yes, Jasper hit weather + equipment delays, but the issues were mechanical, not geological β€” they’ve already fixed the pump and are heading back this week. Management still optimistic.

Meanwhile πŸ‘‰ Rost is about to start de-watering THIS week ffwith PSA commissioning underway and an off-taker lined up. That means helium sales could start very soon πŸ’¨πŸ’°.

So, while Jasper’s slowed a bit, Rost is moving full speed and revenue is finally within sight πŸš€.
❀1
Yeah, Jasper delays are frustrating, but honestly Nick must be feeling it just like we are.

Those issues were weather + a faulty pump, not the project itself.

The good news πŸ‘‰ Rost is finally set for de-watering this week and that’s the step that brings in revenue πŸ’¨πŸ’°

Feels like Nick’s just as eager as us to get this over the line. πŸš€
πŸ“Έ Big milestone at Rost!
The compressor has arrived on site πŸššπŸ’¨ – safely housed in its container to protect it from the weather.

This is the final piece needed to kick off de-watering βœ… … which means helium sales are now within reach πŸ’°πŸš€
🚨 Rost Well Breakthrough! 🚨

βœ… All equipment for Rost is now on site & ready πŸ› οΈ
βœ… Compressor delivered & protected πŸ’ͺ
βœ… As de-watering kicks off and gas flows, mgmt will review shipping the 5.1% helium mix directly to the off-taker πŸ’¨πŸ“¦

πŸ”₯ This means helium sales could start sooner than expected β†’ revenue finally within sight πŸ’°πŸš€
❀2
🚨 BREAKING NEWS – Mendell Helium (MDH.PL) 🚨

πŸ’¨ De-watering has officially BEGUN at the Rost Well (Kansas)!

Key Highlights:

βœ… ESP pump running β†’ removing ~50 barrels of water per hour
βœ… Water showing gas saturation + foaming β†’ clear sign of gas presence
βœ… Gas already venting to surface! ⚑
βœ… Prep underway to connect compressor & deliver gas to off-taker
βœ… PSA unit commissioning started β†’ will purify helium to ~75%+
βœ… Admission to AIM expected once Rost enters production 🎯

Nebraska Update πŸ‡ΊπŸ‡Έ:

Jasper drilling is back underway after pump repair + conductor casing inserted.

Mgmt remains confident despite earlier setbacks.

πŸ“’ CEO Nick Tulloch:

β€œThis is a milestone for Rost. With de-watering underway, the next step is preparing for production β€” a very significant revenue event for M3 Helium.”

πŸ”₯ Bottom Line:
Rost is now moving from prep to production phase β€” helium sales + revenue are finally within sight πŸš€πŸ’°.

πŸ‘‰ Two catalysts lined up:

Rost production = near-term revenue

AIM listing = broader investor reach
🚨 BREAKING NEWS – Gas Flow at Rost Well! 🚨

πŸ’¨ Rost Well (Kansas) has started to show gas flow – a huge milestone on the road to production.

Key Points:

βœ… Ops team now preparing for gas & helium production

βœ… Admission to AIM expected to follow commencement of Rost production

βœ… CEO: β€œWe believe Rostwill be a very significant revenue producing well… As Rost and Jasper reach conclusion, we look forward to updating investors further.”

πŸ”₯ Why this matters:

First signs of gas = confirmation of reservoir potential

Rost revenue could cover overheads + fuel future growth

AIM listing = broader access to capital & new investors

πŸ’Ž Bottom line: Rost has moved from preparation into the early production phase β€” revenue is now within sight! πŸš€
🚨 BREAKING NEWS – Mendell Helium plc (MDH.PL): Major Progress Update! 🚨


πŸ”₯ Fort Dodge (Rost Well):

De-watering is underway and daily gas flow is climbing fast β€” flow rate over 50 Mcf/day, doubling in a week.

Tube trailer for gas delivery has arrived on site; connections to compressor being finalised.

Commercial production targeted around end of October 2025.

Initial helium value: ~US$800/day from early flows, and this is just the start.


🌍 Nebraska (Jasper Well):

Drilling reached 1,680 ft depth with casing set; initial open-hole flow confirmed, but commercial levels not yet achieved.

Water found in the well; options now include stimulation/explosives to unlock full potential.

Management confirms they’re focusing efforts on Rost as primary near-term revenue generator while continuing to explore Jasper.


πŸ“£ CEO Nick Tulloch says:

β€œRost is performing exactly as modeled; we’re delighted. The next few weeks are very exciting.”


✨ Bottom Line:

The engine is now firing at Rost β€” moving from planning to production. With gas and helium flow increasing and delivery infrastructure gear arriving, the next big step is turning it into revenue.
Nebraska has more work to do, but the primary focus is clear. This could mark the transition from promise to proof.
🚨 BREAKING NEWS – Rost Well Gearing Up for Full Production! 🚨

πŸ’¨ Gas & helium flow rates are climbing fast at Mendell Helium’s Rost 1-26 well as de-watering continues!

πŸ“ˆ Commercial production expected by end of October 2025 – a huge milestone for $MDH!

🧰 On-site infrastructure upgrade:

βœ… Main tube trailer delivered – ready for gas collection

βœ… Modular ground storage installed, allowing continuous helium filling even while the main trailer is away

βœ… Scalable system = capacity to expand production easily

πŸ’¬ β€œRost is performing exactly as planned β€” these are the final steps before production revenue begins.”

πŸ”₯ Momentum is clearly building at Rost. From field prep to full helium flow, Mendell Helium is getting closer to turning the switch from testing to revenue generation! πŸ’Ž
🐳1
🚨 BREAKING NEWS: Mendell Helium plc (MDH.PL) – Production Has Commenced! 🚨

πŸ’¨ The Rost 1-26 Well in Fort Dodge, Kansas has officially entered helium production!

βœ… De-watering complete, gas flowing, and first helium shipments underway.

πŸ’° This is the revenue-unlock event we’ve been waiting for β€” the stage is set for earnings momentum.

πŸ“ˆ With this milestone now crossed, the company moves into its operational phase and it’s full steam ahead.

πŸ“Œ Stay tuned β€” the next update could be the one that shifts sentiment.