#PSA 📢 As part of the ongoing construction works 🚧 for the North-South Corridor (#NSC), we’ll be shifting the existing ERP gantry along Thomson Rd by about 25m.
#DontBeAlarmed if you see two ERP structures along this stretch of Thomson Rd during the relocation.
#DontBeAlarmed if you see two ERP structures along this stretch of Thomson Rd during the relocation.