Study UPSC Official
1.61K subscribers
1.05K photos
225 videos
601 files
515 links
A channel by the upsc aspirants, for the upsc aspirants.

Youtube: https://tinyurl.com/3r9xmnne

CSAT Channel: https://t.me/StudyUpscCsat

UPPSC group: https://t.me/studyUppsc2022

For any queries: @civils_being
Download Telegram
No-confidence motion against VP: That's a first in parliamentary history of India

Focus on the constitutional and ethical perspective

@studyUpscChannel
๐Ÿ‘4
Data on Status of Women + Govt Initiatives.pdf
339.2 KB
Data on Status of Women in India
and Notable Government Initiatives

(Sourced from Economic Survey, Government websites, NITI Aayog, and International reports)
Use these data, facts, initiative and report finding on Women Status in GS Paper as well in Essay.
CREDITS : IAS PCS PATHSHALA
Happy Independence Day ๐Ÿ‡ฎ๐Ÿ‡ณ

A Message for Youth

Building a safe nation starts with us. Letโ€™s stand against all forms of violence and protect each other, especially women. Respect and care for one another can create a world where everyone feels safe and valued.
โค4๐Ÿ‘3
Small Satellite Launch Vehicle (SSLV)

โž•Purpose: Designed specifically for launching small satellites into Low Earth Orbit (LEO) and Sun-Synchronous Polar Orbit (SSO).
โž•Payload Capacity: Up to 500 kg to SSO, up to 300 kg to GTO.
โž•Turnaround Time: Rapid launch capability with a turnaround time of less than a week.
โž•Launching Mini, Micro or Nano satellites

Polar Satellite Launch Vehicle (PSLV)

โž•Purpose: Primarily used for launching satellites into polar orbits and geostationary transfer orbits.
โž• Payload Capacity: Up to 1,750 kg to SSO, up to 1,425 kg to GTO.
โž•Turnaround Time: Longer turnaround compared to SSLV.
โž•Usage: Used for a wide range of missions, including Earth observation, remote sensing, and interplanetary missions.

Geosynchronous Satellite Launch Vehicle (GSLV)

โž•Purpose: Designed to launch heavier payloads into Geosynchronous Transfer Orbit (GTO) and beyond.
โž• Payload Capacity: Up to 5,000 kg to LEO, up to 2,500 kg to GTO.
โž• Turnaround Time: Longer turnaround, given the complexity of missions.
โž•Usage: Primarily used for launching communication satellites, weather satellites, and interplanetary missions.
โž•Advanced Technology: Equipped with a cryogenic upper stage, allowing it to carry heavier payloads to higher orbits.

Right Process gives Right Results!!!
๐Ÿ“บhttps://youtu.be/0F19KAloaJE
๐Ÿ‘4
Forwarded from LEGEND BHAIYA UPSC (LEGEND BHAIYA)
NEXT IAS MAINS 2024 IMPORTANT THEMES CHECKLIST.pdf
432.5 KB
Courtesy - Asif sir
๐Ÿ‘3
Schemes arranged as per SDG Goals that may be used as Value Additions for Mains 2024
๐Ÿ‘2
SHe-Box (Sexual Harassment e-box) Portal

โž•In News:

โ— Recently Union Ministry of Women and Child Development launched The SHe-Box portal

โž•About SHe-Box Portal:
โ— Type: Centralized platform for registering and monitoring complaints of sexual harassment in workplace
โ— Objective: To provide a common platform for filing complaints, tracking their status, and ensuring time-bound processing by Local Committees and Internal Committees across govt and private sectors respectively
โ— Functionality:
- Complaint Registration
- Monitoring: Real-time tracking of complaints through a designated nodal officer
- Information Repository: Centralized database of ICs and LCs formed nationwide
- Assured Redressal: Streamlined process for all stakeholders to ensure effective resolution of complaints

โž•Background:
โ— Upgraded Version:
Launched in 2017, aligned with The Sexual Harassment of Women at Workplace (Prevention, Prohibition and Redressal) Act, 2013

Source: TH
Right Process gives Right Results!!!
https://bit.ly/4bWNfhL
๐Ÿ‘1
Forwarded from UPSC SUPER SIMPLIFIED (Dr. Gaurav J. Sontake)
This can be ethics question
๐Ÿ‘1
โœ…Digital Agriculture Mission

โž• Launch: Approved by the Union Cabinet in September 2023, with a budget of Rs 2,817 crore.

โž•Purpose: To create Digital Public Infrastructure (DPI) in the agriculture sector, similar to the government's e-governance initiatives like Aadhaar and UPI.

โž• Key Components:
- AgriStack: A farmer-centric DPI consisting of:
- Farmersโ€™ Registry: Digital identities (Farmer ID) linked to land records, crops sown, and benefits availed.
- Crop Sown Registry: Digital Crop Surveys for recording crops planted by farmers.
- Geo-Referenced Village Maps: Linking geographic information to land records.
- Krishi Decision Support System (DSS): A geospatial system unifying data on crops, soil, weather, and water resources for better decision-making and crop insurance claims.
- Soil Profile Maps: Detailed soil maps (1:10,000 scale) covering 142 million hectares of agricultural land.

๐Ÿ’ฅWe Give You 100% Guarantee of Quality!!!
๐Ÿ“บhttps://youtube.com/shorts/kMs6bQTWaZs
Please open Telegram to view this post
VIEW IN TELEGRAM
PM E-DRIVE Scheme

โž•
Launch: Approved by the Union Cabinet with an outlay of โ‚น10,900 crore for two years to promote electric mobility in India.

โž• Ministry: Implemented by the Ministry of Heavy Industries (MHI).

โž• Key Features:

-Subsidies: Incentives for electric two-wheelers (e-2Ws), three-wheelers (e-3Ws), e-ambulances, and e-trucks.
Support for 24.79 lakh e-2Ws, 3.16 lakh e-3Ws, and 14,028 e-buses.

-E-Vouchers: Introduction of Aadhaar-authenticated e-vouchers to streamline EV purchases.

-E-Ambulances: Deployment of e-ambulances to promote greener healthcare solutions.

-E-Buses: Procurement of 14,028 e-buses in cities with populations over 40 lakh.

-Priority for cities/states procuring buses after scrapping old ones.

-E-Trucks: Incentives for e-truck purchases, with additional support for scrapping old trucks.

-Charging Infrastructure: Setting up public charging stations, including 22,100 fast chargers for e-4Ws and 48,400 for e-2Ws/e-3Ws.

-Testing Infrastructure: Enhancing vehicle testing facilities for modern and emerging EV technologies.

Source - PIB

Right Process gives Right Results!!!
https://bit.ly/4bWNfhL
๐Ÿ‘3โค1
๐Ÿ‘2