Lean to/impromptu tool shed poles concreted in.
Used free steel for the top flashing both the roof and wall will attach to. The side boards made from boards cut from the motorbike transport crates cut up into boards.
All going well tomorrow i will shift all the rocks from inside to outside, and then get the top flashing for against the sea con up then start adding sheets to the walls the roof (walls first so you can cut them flush at the top no matter how saw toothed the uneven ground makes them at the top)
Used free steel for the top flashing both the roof and wall will attach to. The side boards made from boards cut from the motorbike transport crates cut up into boards.
All going well tomorrow i will shift all the rocks from inside to outside, and then get the top flashing for against the sea con up then start adding sheets to the walls the roof (walls first so you can cut them flush at the top no matter how saw toothed the uneven ground makes them at the top)
👍1
3 walls finished, as well as the roof. Front wall and a door to go. Then level off the dirt inside and throw carpet on top of that then i can start to build the shelving along the seacon wall like the ones built inside.
The tin wall i will move the cupboards from the patio against that. Then start moving all me tools, water pumps and random shit in so i can finally start building the decking for the patio and actually get me patio back hahaha
The tin wall i will move the cupboards from the patio against that. Then start moving all me tools, water pumps and random shit in so i can finally start building the decking for the patio and actually get me patio back hahaha
👍1
Last wall up and door on, had to use offcut sheets and stick them together haphazardly cos its all i had left to finish with hahaha, just need to add some flashings and concrete the door post in and im done! And then work begins inside! Hahahaha
👍1🔥1
Potbelly sealed and joins water smoothed, roof cut and flue installed and sealed.
Just need to concrete board/brick the steel cupboard next to it so me shit dont melt haha
Move the plug over more and hide the cable under concrete
And give the pot belly a paint job and we sweet... now waiting 24 more hours of the 48 hours for the fire putty to dry properly
Just need to concrete board/brick the steel cupboard next to it so me shit dont melt haha
Move the plug over more and hide the cable under concrete
And give the pot belly a paint job and we sweet... now waiting 24 more hours of the 48 hours for the fire putty to dry properly