Toilet and sinks fully connected now and running out to the closed loop septic.
Also got the last of the concrete pour in the shower block so now its all level and drain better.
Also got the last of the concrete pour in the shower block so now its all level and drain better.
Extended the solar panel support frame and bought new panels now have 12 300w panels running into the 48v system. Still not enough haha but getting there!
While i had the digger up here i dragged a channel through the salt creek to keep the water moving where i want it too and dumping the salt content in the middle rather than all over the creek. Eventual plan is to grow moringa on either side in the creek beds as theyre salt tolerant also along the top of the banks to stop erosion