MTR Service Update
2.88K subscribers
5.83K photos
21 videos
3 files
1.61K links
帳戶已停用
Account discontinued

請使用 MTR Mobile 接收最新車務狀況
See the latest train service updates from MTR Mobile
👇
https://www.mtr.com.hk/mtrmobile/en/
Download Telegram
2008 Good service on West Rail Line

Metal plates are installed by engineers to fix the cracked rail for enabling trains to proceed with in a temporary-restricted speed

The affected section of running rail will be replaced at non-traffic hours
2008 西鐵綫列車服務回復正常

工程人員現已安裝金屬板,將出現裂縫的路軌夾穩

列車仍然需按照臨時車速限制行駛

上述的路軌亦將於收車後將整段更換
港鐵公司就早前西鐵綫受阻的情況,所發之延遲證明書

Delay certificate issued by #MTR for disruptions on West Rail Line

⬇️
https://tnsms1.mtr.com.hk/latecert/form_en.html
各位乘客早晨 👋

今朝體感温度降至 9 度,記緊咬個包至出門口呀 🍞

唔想喺車廂侷親,最好就係上車前除褸啦,仲可以盡量使用車廂內的空間添 😊

落雨嘅時候、迪士尼綫、西鐵綫、屯馬綫一期列車入站時,會按系統設計而慢少少,要轉車嘅乘客就唔好預到咁趕啦 😅



Good morning

The Realfeel temperature has decreased to about 9 degrees this morning

Remember to grab some breakfast before your journey

Taking off your jacket before boarding would help you to get used to the temperature difference. Please can we also ask you to utilise all available space when you are on the train

In rainy days, trains on Disneyland Resort, West Rail Lines and Tuen Ma Line Phase 1 would run slightly slower as they are designed to do so. Please leave extra time if your journey involves interchanging
政府邀請港鐵開始「#北環綫」項目的詳細設計工作,並即將會招標騁請負責設計的顧問公司

項目分為:

🔧 完成東鐵綫上水站和落馬洲站之間的古洞站

🔧 興建一條長 10.7 的新鐵路,連接古洞站、新田、牛潭尾、凹頭及錦上路站



The Government invited #MTR to proceed with Northern Link project's detailed designs. The procedure of design consultancy will soon be started

This project comprises 2 parts :

🔧 Finish the Kwu Tung Station between Sheung Shui and Lok Ma Chau Stations on East Rail Line

🔧 Build a 10.7 km long railway to connect Kwu Tung, San Tin, Ngau Tam Mei, Au Tau and Kam Sheung Road Station
東鐵綫喺 2021 年會分 10 個星期日,暫停紅磡站的列車服務 🚧

以便安裝超過 180 個架空電纜支架、 875 米長的新分岔路軌,呢段路軌會接駁新建往 #會展#金鐘 嘅路段

最早施工日期為
2021 年 1 月 10 日(星期日)及
2021 年 2 月 21 日(星期日)

期間會有免費接駁巴士來往紅磡同九龍塘站,而西鐵綫就會維持正常服務

#到時可以用Citymapper應用程式計劃行程
#去洗衣街嘅乘客可用旺角站行人天橋網絡
#去尖沙咀嘅乘客喺九龍塘轉車用荃灣綫
#星期日施工喺英美法國同澳洲都好常見
#感謝各位乘客體諒

East Rail Line will cease to operate at Hung Hom on 10 Sundays in the next year to install >180 power wires supporting, 875m of new bifurcation track to connect the newly-built section for Admiralty

The first two closure days are
10/Jan/2021 (Sun) and
21/Feb/2021 (Sun)

Free #MTR Replacement Bus will operate between Hung Hom and Kowloon Tong while services on West Rail Line remains normal
10 more stations will have their Government COVID-19 specimen collection pack machines provided at unpaid concourse from 19/Dec (Sat)

Members of the public should collect the specimen AT HOME and return to Health Department and Hospital Authorities designated clinics ♻️

Stations will not handle these specimen while additional staff will be deployed to assist passengers in need

Seek medical advice IMMEDIATELY when feeling unwell, DO NOT travel and collect any specimen pack ⚠️
喺 12 月 19 日(星期六)起,各行車綫會有多 10 個車站大堂嘅非付費區,設置政府的「2019冠狀病毒樣本收集包」派發機

公眾人士喺領取樣本包後,應交回衞生署、醫院管理局的指定診所 ♻️

車站不會派發或收集任何樣本,不過會加派人手協助有需要嘅乘客

如果有任何病徵,請即求醫,切勿乘車亦唔好自行前往領取樣本收集包 ⚠️
#荔景 站連接 大堂 和 月台 2 - 往中環、月台 4 - 往香港 的 L2 號升降機,

現已換成高速升降機,方便有需要乘客使用 🏢

其他需更換 或 大修 之升降機
➡️ metroride.hk/liftoutage



The Lift L2 connecting Concourse and Platform 2 - to Central, Platform 4 - to Hong Kong at Lai King Station has been replaced as a high-speed lift

It provides a step free access for passengers in need 🏢

Other lifts pending for replacement / overhaul
➡️ metroride.hk/liftoutage
12 月 21 日(星期一),

市區綫、東鐵綫
於 1500 時起改用黃昏繁忙時間班次,以疏導乘客,至表定非繁忙時間為止

南港島綫、東涌綫、西鐵綫及屯馬綫一期
則於 1600 及 1630 時,起實施上述安排

表定列車服務水平
➡️ metroride.hk/TrainsPerHour



On 21/Dec (Mon),

Urban Lines + East Rail Line will begin evening peak hour service from 1500 hours to cater upsurge demand until the scheduled time

While this arrangement on South Island, Tung Chung, West Rail Lines / Tuen Ma Line Ph. 1 start at 1600 / 1630 hours respectively
#荔景 站連接 大堂 和 月台 1 - 往荃灣、月台 3 - 往東涌 的 L3 號升降機,

將預計停用至 2021 年 7 月初,以便換成高速升降機

有需要的乘客請用召援專綫聯絡職員協助 👆

其他需更換 或 大修 之升降機
➡️ metroride.hk/liftoutage



The Lift L3 connecting

Concourse and
Platform 1 - to Tsuen Wan, Platform 3 - to Tung Chung

at Lai King Station is estimated to be re-opened in early-Jul/2021 for the high speed lift installation work

Passengers who require step-free access please approach staff assistance via any Help Lines 👆

Other lifts pending for replacement / overhaul
➡️ metroride.hk/liftoutage
目前應政府規定,各種嘅羣組聚集都有限制,而餐飲、娛樂等場所亦只能限度運作

喺仔細考慮乘客量需求後,港鐵會安排各行車綫、輕鐵、港鐵巴士及港鐵接駁巴士於 12 月 24 日(星期四)晚如常收車 🎄🌙

不過,各行車綫當日會提早開始黃昏繁忙時間服務,配合番唔同機構當日俾僱員早啲番屋企嘅辦公安排 🚈 🏃‍♂️

#做好防疫大家努力
#留在家中減少社交接觸

Group gatherings are still being discouraged and various restrictions imposed by the Government on different businesses, including hospitality, are still in effect

MTR has taken the decision to close its services on all running lines, Light Rail, MTR Bus and MTR Feeder Bus at usual times on 24/Oct (Thu) night after careful consideration of passenger demand 🎄🌙

While all running lines will start their evening peak hour service earlier than usual to cope with merchants’ office hour changes
12 月 24 日(星期四),

市區綫、東鐵綫
於 1500 時起改用黃昏繁忙時間班次,以疏導乘客,至表定非繁忙時間為止

南港島綫、東涌綫、西鐵綫及屯馬綫一期
則分別於 1600 及 1630 時,起實施上述安排

表定列車服務水平
➡️ metroride.hk/TrainsPerHour



On 24/Dec (Thu),

Urban Lines + East Rail Line will begin evening peak hour service from 1500 hours to cater upsurge demand until the scheduled time

While this arrangement on South Island, Tung Chung, West Rail Lines / Tuen Ma Line Ph. 1 start at 1600 / 1630 hours respectively
0906 之前的有列車故障事件現已處理,東鐵綫列車服務稍有阻延

部分東鐵綫列車會於中途站停止服務,或改往其他目的地以紓緩擠塞情況,請留意月台及車廂廣播

為盡快疏導乘客,控制中心亦會按實際情況適時加開空車



The earlier faulty train event has just resolved, minor delays on East Rail Line

Some East Rail Line trains may terminate, join the line at intermediate stations or have its destination changed to relief congestions

Listen to announcements. Empty trains will also be dispatched to ease the crowd
0926 東鐵綫列車服務回復正常
Good service on East Rail Line
乘客持有
🗓 12 月 2 日至 31 日
以及
🗓 2021 年 1 月 1 日至 31 日到期,
而仲有餘下車程嘅港鐵都會票

可以分別喺
🗓 2021 年 1 月 15 日至 2 月 14 日
以及
🗓 2021 年 2 月 15 日至 3 月 14 日

帶埋車票到各客務中心,將車票有效期延長 40 日,方便乘客利用呢個特別調整出行習慣 🚶‍♂️🚶‍♀️


Holders of MTR City Saver with remaining journeys expiring on
🗓 2-31/Dec
and
🗓 1-31/Jan/2021

may visit any Customer Service Centres from
🗓 15/Jan/2021 - 14/Feb/2021
and from
🗓 15/Feb/2021 - 14/Mar/2021

for extending your ticket’s validity for another 40 days

This special arrangement allows passengers to adjust your travelling patterns 🚶‍♂️🚶‍♀️
1800 之前的有列車故障事件現已處理,觀塘綫列車服務嚴重受阻

The earlier faulty train event has just resolved, Severe delays on Kwun Tong Line
1815 觀塘站有列車故障,觀塘綫列車現來往

黃埔 至 觀塘,預計 15 分鐘一班

部分觀塘綫列車會於中途站停止服務,或改往其他目的地以紓緩擠塞情況,請留意月台及車廂廣播

為盡快疏導乘客,控制中心亦會按實際情況適時加開空車



Due to faulty train at Kwun Tong Station, Kwun Tong Line trains serve

Whampoa - Kwun Tong, est 15 mins interval

Some Kwun Tong Line trains may terminate, join the line at intermediate stations or have its destination changed to relief congestions

Listen to announcements. Empty trains will also be dispatched to ease the crowd
乘客可於 Citymapper 應用程式查閱其他交通工具資料,

全自動計劃「點對點」行程

📲http://citymapper.com

Check alternative transport and re-plan your point to point journey automatically via Citymapper application