Do not use public transport unless essential ⚠️
Peak hour services remain unchanged ✅
while reduced service is operated on Kwun Tong, Island and Tung Chung Lines at non-peak hours owing to epidemic, details ➡️ metroride.hk/2uCgDes
Plan your journey ahead on Citymapper 📲
Railway premises are public places by law
Dial 999 and summon emergency services to deal with the offenders of Cap. 599I Prevention and Control of Disease (Wearing of Mask) Regulation if you see anyone is not wearing their face coverings on their railway 📞
Peak hour services remain unchanged ✅
while reduced service is operated on Kwun Tong, Island and Tung Chung Lines at non-peak hours owing to epidemic, details ➡️ metroride.hk/2uCgDes
Plan your journey ahead on Citymapper 📲
Railway premises are public places by law
Dial 999 and summon emergency services to deal with the offenders of Cap. 599I Prevention and Control of Disease (Wearing of Mask) Regulation if you see anyone is not wearing their face coverings on their railway 📞
做好防疫,大家努力,如非必要應避免外出搭公共交通工具 ⚠️
繁忙時間列車服務維持不變 ✅
其餘時間自 12 月 12 日(星期六)起,觀塘綫、港島綫、東涌綫的班次則受疫情影響略有下調
➡️ metroride.hk/reducedTPH
乘客可用 Citymapper 計劃「點對點」行程,預算車程時間 📲
鐵路處所於法理上同屬公眾地方,
若有人於鐵路上未有戴上口罩,請致電 999 召喚緊急服務人員協助,處理違反香港法例第599I章《預防及控制疾病(佩戴口罩)規例》的人士 📞
繁忙時間列車服務維持不變 ✅
其餘時間自 12 月 12 日(星期六)起,觀塘綫、港島綫、東涌綫的班次則受疫情影響略有下調
➡️ metroride.hk/reducedTPH
乘客可用 Citymapper 計劃「點對點」行程,預算車程時間 📲
鐵路處所於法理上同屬公眾地方,
若有人於鐵路上未有戴上口罩,請致電 999 召喚緊急服務人員協助,處理違反香港法例第599I章《預防及控制疾病(佩戴口罩)規例》的人士 📞
12 月 14 日 至 2021 年 1 月 2 日,
輕鐵每逢平日將改用星期六服務模式,部分路綫全日整體班次比平日更頻密,路綫 751P 則會於兩段繁忙時間行駛
而輕鐵列車駛過道岔位時,仍需遵照臨時車速限制,各路綫的全程行車時間,將最多延長 3 至 5 分鐘 🛤
輕鐵表定列車服務水平
➡️ metroride.hk/TrainsPerHour
-
Light Rail will adopt Saturday service pattern on every weekdays from 14/Dec - 2/Jan/2021
Services are generally more frequent than normal weekdays on some routes while Route 751P now operates at both peak hours
Light Rail scheduled service levels
➡️ metroride.hk/2CzV4gR
Light Rail Vehicles are still required to observe temporary speed restrictions when passing through the points 🛤
As a result, the full journey time of all routes will increase by maximum 3-5 minutes
輕鐵每逢平日將改用星期六服務模式,部分路綫全日整體班次比平日更頻密,路綫 751P 則會於兩段繁忙時間行駛
而輕鐵列車駛過道岔位時,仍需遵照臨時車速限制,各路綫的全程行車時間,將最多延長 3 至 5 分鐘 🛤
輕鐵表定列車服務水平
➡️ metroride.hk/TrainsPerHour
-
Light Rail will adopt Saturday service pattern on every weekdays from 14/Dec - 2/Jan/2021
Services are generally more frequent than normal weekdays on some routes while Route 751P now operates at both peak hours
Light Rail scheduled service levels
➡️ metroride.hk/2CzV4gR
Light Rail Vehicles are still required to observe temporary speed restrictions when passing through the points 🛤
As a result, the full journey time of all routes will increase by maximum 3-5 minutes
Do not use public transport unless essential ⚠️
Peak hour services remain unchanged ✅
while a slight reduced service is operated on Tung Chung Line and Light Rail at non-peak hours owing to epidemic, details ➡️ metroride.hk/2uCgDes
Plan your journey ahead on Citymapper 📲
Railway premises are public places by law
Dial 999 and summon emergency services to deal with the offenders of Cap. 599I Prevention and Control of Disease (Wearing of Mask) Regulation if you see anyone is not wearing their face coverings on their railway 📞
Peak hour services remain unchanged ✅
while a slight reduced service is operated on Tung Chung Line and Light Rail at non-peak hours owing to epidemic, details ➡️ metroride.hk/2uCgDes
Plan your journey ahead on Citymapper 📲
Railway premises are public places by law
Dial 999 and summon emergency services to deal with the offenders of Cap. 599I Prevention and Control of Disease (Wearing of Mask) Regulation if you see anyone is not wearing their face coverings on their railway 📞
做好防疫,大家努力,如非必要應避免外出搭公共交通工具 ⚠️
繁忙時間列車服務維持不變 ✅
其餘時間自 12 月 14 日(星期一)起,東涌綫及輕鐵的班次受疫情影響則略有下調
➡️ metroride.hk/reducedTPH
乘客可用 Citymapper 計劃「點對點」行程,預算車程時間 📲
鐵路處所於法理上同屬公眾地方,
若有人於鐵路上未有戴上口罩,
請致電 999 召喚緊急服務人員協助,處理違反香港法例第599I章《預防及控制疾病(佩戴口罩)規例》的人士 📞
繁忙時間列車服務維持不變 ✅
其餘時間自 12 月 14 日(星期一)起,東涌綫及輕鐵的班次受疫情影響則略有下調
➡️ metroride.hk/reducedTPH
乘客可用 Citymapper 計劃「點對點」行程,預算車程時間 📲
鐵路處所於法理上同屬公眾地方,
若有人於鐵路上未有戴上口罩,
請致電 999 召喚緊急服務人員協助,處理違反香港法例第599I章《預防及控制疾病(佩戴口罩)規例》的人士 📞
0855 柯士甸站訊號故障,西鐵綫列車服務嚴重受阻
可考慮其他交通工具
部分西鐵綫列車會於中途站停止服務,或改往其他目的地以紓緩擠塞情況,請留意月台及車廂廣播
為盡快疏導乘客,控制中心亦會按實際情況適時加開空車
-
0855 Signal failure at Austin Station, severe delays on West Rail Line
Consider other transport means
Some West Rail Line trains may terminate, join the line at intermediate stations or have its destination changed to relief congestions
Listen to announcements. Empty trains will also be dispatched to ease the crowd
可考慮其他交通工具
部分西鐵綫列車會於中途站停止服務,或改往其他目的地以紓緩擠塞情況,請留意月台及車廂廣播
為盡快疏導乘客,控制中心亦會按實際情況適時加開空車
-
0855 Signal failure at Austin Station, severe delays on West Rail Line
Consider other transport means
Some West Rail Line trains may terminate, join the line at intermediate stations or have its destination changed to relief congestions
Listen to announcements. Empty trains will also be dispatched to ease the crowd
0910 柯士甸站路軌出現問題,西鐵綫列車服務嚴重受阻
可考慮其他交通工具
職員初步檢查後,發現路軌有細微的裂痕,因而影響列車接收行車訊號
為安全起見,列車需改用人手駕駛,以不超過 22 公里的車速前行
工程人員會盡快帶同工具到現場搶修
-
0910 Faulty track at Austin Station, severe delays on West Rail Line
Consider other transport means
A prominent crack-line was located by the preliminary inspection and affected train's proceed signal
For safety reasons, trains will be driven manually with speed lower than 22 kph
Engineers will attend the case with the tools required as soon as possible
可考慮其他交通工具
職員初步檢查後,發現路軌有細微的裂痕,因而影響列車接收行車訊號
為安全起見,列車需改用人手駕駛,以不超過 22 公里的車速前行
工程人員會盡快帶同工具到現場搶修
-
0910 Faulty track at Austin Station, severe delays on West Rail Line
Consider other transport means
A prominent crack-line was located by the preliminary inspection and affected train's proceed signal
For safety reasons, trains will be driven manually with speed lower than 22 kph
Engineers will attend the case with the tools required as soon as possible
乘客可於 Citymapper 應用程式查閱其他交通工具資料,
全自動計劃「點對點」行程
📲http://citymapper.com
Check alternative transport and re-plan your point to point journey automatically via Citymapper application
全自動計劃「點對點」行程
📲http://citymapper.com
Check alternative transport and re-plan your point to point journey automatically via Citymapper application
1103 西鐵綫列車服務回復正常
工程人員現已安裝金屬板,將出現裂縫的路軌夾穩
列車仍然需按照臨時車速限制行駛
上述的路軌亦將於收車後將整段更換
-
1103 Good service on West Rail Line
Metal plates are installed by engineers to fix the cracked rail for enabling trains to proceed with in a temporary-restricted speed
The affected section of running rail will be replaced at non-traffic hours
工程人員現已安裝金屬板,將出現裂縫的路軌夾穩
列車仍然需按照臨時車速限制行駛
上述的路軌亦將於收車後將整段更換
-
1103 Good service on West Rail Line
Metal plates are installed by engineers to fix the cracked rail for enabling trains to proceed with in a temporary-restricted speed
The affected section of running rail will be replaced at non-traffic hours
港鐵公司就早前西鐵綫受阻的情況,所發之延遲證明書
Delay certificate issued by #MTR for disruptions on West Rail Line
⬇️
https://tnsms1.mtr.com.hk/latecert/form_en.html
Delay certificate issued by #MTR for disruptions on West Rail Line
⬇️
https://tnsms1.mtr.com.hk/latecert/form_en.html
1655 Faulty track at Austin Station
minor delays on West Rail Line
-
Some West Rail Line trains may terminate, join the line at intermediate stations or have its destination changed to relief congestions
Listen to announcements. Empty trains will also be dispatched to ease the crowd
-
A crack was appeared at tracks near Austin Station and engineers applied temporary measures
Trains are then required to observe temporary speed restrictions thus the journey time is increased and West Rail Line’s capacity is also slightly reduced
minor delays on West Rail Line
-
Some West Rail Line trains may terminate, join the line at intermediate stations or have its destination changed to relief congestions
Listen to announcements. Empty trains will also be dispatched to ease the crowd
-
A crack was appeared at tracks near Austin Station and engineers applied temporary measures
Trains are then required to observe temporary speed restrictions thus the journey time is increased and West Rail Line’s capacity is also slightly reduced
港鐵公司就早前西鐵綫受阻的情況,所發之延遲證明書
Delay certificate issued by #MTR for disruptions on West Rail Line
⬇️
https://tnsms1.mtr.com.hk/latecert/form_en.html
Delay certificate issued by #MTR for disruptions on West Rail Line
⬇️
https://tnsms1.mtr.com.hk/latecert/form_en.html
各位乘客早晨 👋
今朝體感温度降至 9 度,記緊咬個包至出門口呀 🍞
唔想喺車廂侷親,最好就係上車前除褸啦,仲可以盡量使用車廂內的空間添 😊
落雨嘅時候、迪士尼綫、西鐵綫、屯馬綫一期列車入站時,會按系統設計而慢少少,要轉車嘅乘客就唔好預到咁趕啦 😅
-
Good morning
The Realfeel temperature has decreased to about 9 degrees this morning
Remember to grab some breakfast before your journey
Taking off your jacket before boarding would help you to get used to the temperature difference. Please can we also ask you to utilise all available space when you are on the train
In rainy days, trains on Disneyland Resort, West Rail Lines and Tuen Ma Line Phase 1 would run slightly slower as they are designed to do so. Please leave extra time if your journey involves interchanging
今朝體感温度降至 9 度,記緊咬個包至出門口呀 🍞
唔想喺車廂侷親,最好就係上車前除褸啦,仲可以盡量使用車廂內的空間添 😊
落雨嘅時候、迪士尼綫、西鐵綫、屯馬綫一期列車入站時,會按系統設計而慢少少,要轉車嘅乘客就唔好預到咁趕啦 😅
-
Good morning
The Realfeel temperature has decreased to about 9 degrees this morning
Remember to grab some breakfast before your journey
Taking off your jacket before boarding would help you to get used to the temperature difference. Please can we also ask you to utilise all available space when you are on the train
In rainy days, trains on Disneyland Resort, West Rail Lines and Tuen Ma Line Phase 1 would run slightly slower as they are designed to do so. Please leave extra time if your journey involves interchanging
政府邀請港鐵開始「#北環綫」項目的詳細設計工作,並即將會招標騁請負責設計的顧問公司
項目分為:
🔧 完成東鐵綫上水站和落馬洲站之間的古洞站
🔧 興建一條長 10.7 的新鐵路,連接古洞站、新田、牛潭尾、凹頭及錦上路站
-
The Government invited #MTR to proceed with Northern Link project's detailed designs. The procedure of design consultancy will soon be started
This project comprises 2 parts :
🔧 Finish the Kwu Tung Station between Sheung Shui and Lok Ma Chau Stations on East Rail Line
🔧 Build a 10.7 km long railway to connect Kwu Tung, San Tin, Ngau Tam Mei, Au Tau and Kam Sheung Road Station
項目分為:
🔧 完成東鐵綫上水站和落馬洲站之間的古洞站
🔧 興建一條長 10.7 的新鐵路,連接古洞站、新田、牛潭尾、凹頭及錦上路站
-
The Government invited #MTR to proceed with Northern Link project's detailed designs. The procedure of design consultancy will soon be started
This project comprises 2 parts :
🔧 Finish the Kwu Tung Station between Sheung Shui and Lok Ma Chau Stations on East Rail Line
🔧 Build a 10.7 km long railway to connect Kwu Tung, San Tin, Ngau Tam Mei, Au Tau and Kam Sheung Road Station