🔹🔸🔹1. የብረት ኮንዲዩት/ steel coduit:-
🔹የኤሌክትሪካል ገመዱን/ኬብሉን ከሜካኒካል ጉዳት መከላከል አስፈላጊ ሆኖ ስናገኘው እንጠቀመዋለን።
🔹በሶስት ዋና ዋና ክፍሎች ይከፈላል።
ሀ. ደረቅ የብረት ኮንዲዩት(Rigid Steel Conduit)
ለ. ታጣፊ የብረት ኮንዲዩት(Flexible Steel Conduit)
መ. የብረት ሆዝ(Metallic Hose)
ናቸው።👇👇👇👇👇👇👇👇👇👇 https://t.me/engineer03
🔹🔸🔹ሀ. ደረቅ የብረት ኮንዲዩት(Rigid Steel Conduit):-
🔸ለአጣቃቀም እንዲመች ሲባል እርዝመቱ 3 ሜትር ነው።
🔸🔹ጫፉ ላይ ጥርስ የመሰለ ነገር ያለው ሊሆን ይችላል/እኛ እራሳችን ጥርስ ልናወጣለትም እንችላለን። ጥርሱም የተለያዩ የብረት ኮንዲዩቶችን ለማጋጠም/ለማገናኘት ይረዳናል ~ከቤት ውጭ ለሆነ ዝርጋታ።
🔸በብረት ማጋጠሚያወች ተጠቅመን የብረት ኮንዲዩቶችን እናገናኛለን።
🔸ለንግድ ህንፃዎችና ለትላልቅ ህንፃዎች ኤሌክትሪክ ገመድ/ኬብል በውስጡ በማሳለፍ ለመዘርጋት ይጠቅማል።
🔸አሁን ላይ እየቀረ ያለ የኮንዲዩት አይነት ነው።
👇👇👇👇👇
https://t.me/engineer03
🔹🔸🔹ለ. ታጣፊ የብረት ኮንዲዩት (Flexible Steel Conduit):-

🔹ለገበያ የሚቀርበው በጥቅል ሲሆን አንዱ ጥቅልም እስከ 50 ሜትር እርዝመት አለው።
🔸 ለማጉበጥ/ለማጠፍ መሳሪያ አያስፈልግም።
🔹እረጅም እርቀት ላለው እና ሞቃት ለሆነ ቦታ ከፍተኛ ጥቅም አለው።

ይቀጥላል .....
👇👇👇👇👇 https://t.me/engineer03
#የኢትዮጵያ የህንፃ ኮድ መመሪያ/EBCS:-
☑️የኢትዮጵያ የህንፃ ኮድ መመሪያ/EBCS(Ethiopian Building Cod Standard) ላይ ብዙ ደንቦችና መመርያዎች የተዘረዘሩ ሲሆን በኤሌክትሪክ መስመር ዝርጋታው ዘርፍ ደግሞ የኤሌክትሪክ ገመድ ቀለም ደንብ(Electrical Wire and cable color code) ፣የኤሌክትሪክ ገመድ መጠን(Electrical Wire Size) እና የኤሌክትሪክ አክሰሰሪዎች ከመሬት ያላቸው ከፍታ(Electrical Accessories Height from floor) ዋና ዋናወቹ ናቸው።

ይጠብቁን ........

https://t.me/engineer03
👉Advance Security and
Performance Security 👆👆👆

.

1. Advance security
*ስራ ተቋራጩ ለሚወስደው የቅድም ክፍያ ገንዘብ በሚከፈለው የገንዘብ መጠን ልክ የሚያሲዘው የባንክ ዋስትና
ቦንድ ነው።
እውነተኛነቱ በተረጋገጠ ቼክ፣ ያልተገደበ የባንክ ዋስትና ወይም ከህጋዊ ጥቃቅን ማይክሮ ፋይናንስ የተፃፈ የዋስትና ደብዳቤ ማስያዝ ይኖርበታል።
ስራ ተቋራጩ የወሰደውን ቅድመ ክፍያ ከፍሎ እስኪጨርስ ያስያዘው ዋስትና ግዜው ማለቅ(Expire) አይችልም።
ከአንድ ወር ቀደም ብሎ የዋስትና ቀነ ገደቡ ከማለፉ በፊት ከአማካሪ በሚፃፍለት ደብዳቤ መሰረት ሊታደስ ይገባል።
ነገር ግን ስራ ተቋራጩ ያስያዘውን ዋስትና ቀነ ገደቡ አልፎ ሳያሳድስ ቢቀር ቀሪ ያልተከፈለ ቅድመ ክፍያ ሙሉ ለሙሉ ከሚቀጥለው ክፍያ ቅፅ ላይ ተቀናሽ ይደረጋል።
ስራ ተቋራጩ ያስያዘውን ዋስትና ቅድመ ክፍያ ገንዘብ ከፍሎ እንደጨረሰ ተመላሽ ይደረግለታል።
የተለየ የቅድመ ክፍያ እና የዋስትና አከፋፈል አካሔድ ለፕሮጀክቱ የተዘጋጀው ውል/special condition of contract/ ይችላል።
2. Performance Security
*ስራ ተቋራጩ ውል ተቀብሎ ተፈፃሚ ማድረግ የሚችልበትን ለብቃት ማረጋገጫ የሚያሲዘው ዋስትና ነው።
ውል በተፈራረመ በአስራ አምስት ቀናት ውስጥ (15) ውሉ የሚያዘውን መጠን ዋስትና ያቀርባል ።
ዋስትናው ስራ ተቋራጩ በተገቢው መንገድ ውሉን ተፈፃሚ ሳያደርግ ቢቀር ለውል ሰጪ (ባለቤት) እንደ ካሳ ክፍያ ይሆናል።
እውነተኛነቱ በተረጋገጠ ቼክ፣ የባንክ ዋስትና ወይም ከህጋዊ ጥቃቅን ማይክሮ ፋይናንስ የተፃፈ የዋስትና ደብዳቤ ውሉ ላይ
በተቀመጠው ፎርማት መሰረት ማስያዝ ይኖርበታል።
ይህ ዋስትና ሳይቀርብ ምንም አይነት ክፍይ ተፈፃሚ ሊደረግ
አይገባም።
ስራው ተጠናቆ እስኪያልቅ ይህ ዋስተና ተገቢ እና ቀነ ገደቡ ሳያልቅ መታደስ ይጠበቅበታል። ስራው ተጠናቆ ርክክብ እንደተፈፀመ በ ሀያ ስምንት(28) ቀናት ውስጥ ለስራ ተቋራጩ ሊመለስለት ይገባል። .
⚡አሁኑኑ Join በማረግ እና ለጓደኛዎ እና ለሚያቁት ሁሉ ሼር ያድርጉ።
👇👇👇
https://t.me/engineer03
#የኤሌክትሪክ ገመድ ቀለም ደንብ(Electrical Wire and cable color code):-
☑️ኤሌክትሪክ ገመዶችን ቀለማቸውን መሰረት በማድረግ ለተለያዩ የዝርጋታ አይነቶች ማዋል አስፈላጊ ነው። በዘፈቀደ አይዘረጉም። በዚህም መሰረት የኢትዮጵያ የህንፃ ኮድ ደንቦችን እናያለን።
☑️ገመድ ስንጠቀምም ለነጠላ ፌዝ(እሳት)ና ለባለ 3 ፌዝ(እሳት) የምንጠቀማቸውን እናያለን።
⚪️ነጠላ ፌዝ/እሳት (Single phase):-
☑️3 የተለያየ ቀለም ያላቸው ገመዶች አሉት። እነርሱም:-
▶️ ለእሳት(phase)
🔴ቀይ(red)
🟡ቢጫ(yellow)
🔵ሰማያዊ(blue) ልንጠቀም እንችላለን።
▶️ ለውሃ(Neutral)
⚫️ጥቁር(black)
▶️ለግራውንድ(Ground/Earthing)
🔰አረንጓዴ በቢጫ(green&yellow)
⚪️ባለ 3 ፌዝ/እሳት(3-phase):-
☑️4 ወይም 5 የተለያየ ቀለም ያላቸው ገመዶች አሉት። እነርሱም:- ሶስት እሳት(R, Y & B)፣ አንድ ውሃና አንድ ግራውንድ ሲሆኑ ቀለማቸው እንደሚከተለው ነው።
▶️ 3ቱ እሳቶች(phases)
🔴 R-ቀይ(Red)
🟡Y-ቢጫ(Yellow)
🔵B-ሰማያዊ(Blue)
▶️ውሃ(Neutral)
⚫️ጥቁር(Black)
▶️ግራውንድ(Ground)
🔰አረንጓዴ በቢጫ(Green&Yellow)
ናቸው።

https://t.me/engineer03
https://t.me/engineer03
Types of Admixtures Used In Concrete
Admixtures are natural or manufactured chemicals which are added to the concrete before or during mixing. The most often used admixtures are air-entraining agents, water reducers, water-reducing retarders and accelerators.
We'll discuss The Types of Concrete Admixtures in the following Posts.
Source; TheConstructor
1- Water Reducing Admixtures
Water reducing admixtures, the name itself defines that they are used to minimize the water demand in a concrete mix. Workability is the important property of concrete which is improved with the addition of water but if the water is added more than required the strength and durability properties of concrete gets affected.
In addition, to increase in workability it also improves the strength of concrete, good bond between concrete and steel, prevents cracking, segregation, honeycombing, bleeding etc. Water reducing admixtures are also called as plasticizers and these are classified into three types namely plasticizers, mid-range plasticizers and superplasticizers. Normal plasticizer reduces the water demand by up to 10%, mid-range plasticizers reduce the water demand by up to 15% while superplasticizers reduce the water demand by up to 30%.

2- Retarding Admixtures
Retarding admixtures slow down the rate of hydration of cement in its initial stage and increase the initial setting time of concrete. These are also called as retarders and used especially in high-temperature zones where concrete will set quickly. The quick setting in some situations may lead to discontinuities in structure, the poor bond between the surfaces creates unnecessary voids in concrete etc. Retarders are useful to eliminate this type of problems. Commonly used retarding admixture is calcium sulphate or gypsum. Starch, cellulose products, common sugar, salts of acids are some other retarders. Most of the water-reducing admixtures are also acts as retarding admixtures and they are called as retarding plasticizers.

#Share
https://t.me/engineer03
Civil Engineering Sub-Disciplines

⚗⚗⚗⚗⚗⚗⚗⚗⚗⚗⚗⚗
1.Coastal engineering is concerned with managing coastal areas. The term coastal defense is the more traditional term, but coastal management has become more popular as the field has expanded to include techniques that allow erosion to claim land.
🏗🏭🏗🏭🏗🏭🏗🏭🏗🏭🏗🏭
2.Construction engineering involves planning and execution of the designs from transportation, site development, hydraulic, environmental, structural and geotechnical engineers.
🗾🗾🗾🗾🗾🗾🗾🗾🗾🗾🗾🗾
3.Earthquake engineering is dedicated to reducing earthquake risk by advancing the practice of this science.
🏞🏞🏞🏞🏞🏞🏞🏞🏞🏞🏞🏞
4.Environmental engineering can be involved with pollution reduction, green engineering, and industrial ecology and involves protecting the environment and human health.
⛰🏔⛰⛰⛰🏜🏜⛰🏜🏜⛰🏜
5.Geotechnical engineering is an area of civil engineering concerned with the rock and soil that supports civil engineering projects.
⛲️🗼⛲️🗼⛲️🗼⛲️🗼⛲️🗼⛲️🗼
6.Materials engineering and sciences deals with materials such as concrete, mix asphalt concrete, metals as well as paints and finishes.
🏚🌅🏜🏭🌄🏭🏜🏭🏜🏭🏜🏭
7.Municipal or urban engineering involves specifying, designing, constructing, and maintaining streets, sidewalks, water supply networks, sewers, street lighting, municipal solid waste management and disposal, storage depots for various bulk materials used for maintenance and public works, public parks and bicycle paths.
⛩🚧🏗🏣🏤🏢🏗🏪🏚🏗🗼⛩
8.Structural engineering is concerned with designing structures to be safe and serviceable for their users
🛣🌉🛣🌉🛣🌉🛣🌉🛣🌉🛣🌉
9.Transportation engineering is concerned with moving people and goods efficiently, safely, and in a manner conducive to a vibrant community.
🏞⚓️⛲️⚓️⛲️🏝⚓️⛲️⚓️⛲️⚓️⛲️
10.Water resources engineering is a discipline that combines hydrology, environmental science, meteorology, geology, conservation, and resource management.

🏰🗼🏰🗼🏰🗼🏰🗼🏰🗼🏰
🗼

https://t.me/engineer03
https://t.me/engineer03
#EthiopiaAddisAbeba
ጀሞ ቁጥር ሁለት አካባቢ ባለ አራት የኮንክሪት ወለል (G+3) ለመኖሪያ የተሠራ ህንጻ ወድቋል።

ከአወዳደቁ መረዳት እንደሚቻለው ከፊት ለፊት ያሉት ዐምዶች (columns) የመሸከም አቅማቸውን (buckling poin5) ያለፈ ሸክም ተጭኗቸዋል። በሕንጻ ዲዛይን ሳይንስ የዐምድ (Columns) መፍረስ አልፎ አልፎ (Rarely) የሚከሰት እንጂ የዘወትር ክስተት አይደለም። በተለምዶ በመሐንዲሶች ዘንድ "ዐምድ ወድቆ አይወድቅም" ይባላል።

ሕንጻ በተለያዩ ምክንያቶች ሊወድቅ ይችላል። ለምሳሌ ከመዋቅር ዲዛይን ችግር፣ የአሸዋ መቆሸሽ፣ የሲሚንቶ ማነስ፣ በቂ ውኃ ያለማጠጣት ወዘተ ሊሆንም ይችላል።

ለባለሙያ የዲዛይን ጥናት የፕሮጀክቱን 1% የማይሞላ ገንዘብ ላለመክፈል ግንባታውንም በባለሙያ ለማሠራት መስቆንቆን እንዲህ 100% ዋጋ ያስከፍላል።

https://t.me/engineer03
https://t.me/engineer03
Civil Engineering
Types of Admixtures Used In Concrete Admixtures are natural or manufactured chemicals which are added to the concrete before or during mixing. The most often used admixtures are air-entraining agents, water reducers, water-reducing retarders and accelerators.…
.


Types of Admixtures Used In Concrete
...con’t...from the above

3- Accelerating Admixtures

Accelerating admixtures are used to reduce the initial setting time of concrete. They speed up the process of the initial stage of hardening of concrete hence they are also called as accelerators. These accelerators also improve the strength of concrete in its early stage by increasing the rate of hydration. Earlier hardening of concrete is useful in several situations such as early removal of formwork, less period of curing, emergency repair works, for constructions in low-temperature regions etc. Some of the accelerating admixtures are triethanolamine, calcium formate, silica fume, calcium chloride, finely divided silica gel etc. Calcium chloride is the cheap and commonly used accelerating admixture.

4- Air Entraining Concrete Admixture

Air entraining admixtures are one of the most important inventions in concrete technology. Their primary function is to increase the durability of concrete under freezing and thawing conditions. When added to the concrete mix, these admixtures will form millions of non-coalescing air bubbles throughout the mix and improves the properties of concrete. Air entrainment in concrete will also improve the workability of concrete, prevents segregation and bleeding, lower the unit weight and modulus of elasticity of concrete improves the chemical resistance of concrete and reduction of cement or sand or water content in concrete etc. Most used air entrainment admixtures are visual resin, darex, Teepol, Cheecol etc. These admixtures are actually made of Natural wood resins, alkali salts, animal and vegetable fats and oils etc.


https://t.me/engineer03
https://t.me/engineer03
Types of Admixtures Used In Concrete ...cont...

5- Pozzolanic Admixtures

Pozzolanic admixtures are used to prepare dense concrete mix which is best suitable for water retaining structures like dams, reservoirs etc. They also reduce the heat of hydration and thermal shrinkage. Best pozzolanic materials in optimum quantity give the best results and prevent or reduces many risks such as alkali-aggregate reaction, leaching, sulfate attack etc. Pozzolanic materials used as admixtures are either natural or artificial. Naturally occurring Pozzolanic materials are the clay, shale, volcanic tuffs, pumicite, etc. and artificial pozzolans available are fly ash, silica fume, blast furnace slag, rice husk ash, surkhi etc.

6- Damp-proofing Admixtures

Damp-proofing or waterproofing admixtures are used to make the concrete structure impermeable against water and to prevent dampness on the concrete surface. In addition to the waterproof property, they also act as accelerators in the early stage of concrete hardening. Damp proofing admixtures are available in liquid form, powder form, paste form etc. The main constituents of these admixtures are aluminium sulfate, zinc sulfate aluminium chloride, calcium chloride, silicate of soda etc. which are chemically active pore fillers.
#share

.

https://t.me/engineer03
https://t.me/engineer03
Following are the tests conducted to determine the suitability of stone for
engineering use

👉Acid Test: understand the presence of CACO3 in building stone.

👉Attrition Test: Resisting power of stones against grinding action or wear and tear against the traffic.

👉Crushing Test: Compressive strength of stones.

👉Impact Test: resistance of stones against sudden loading.

👉Smith's Test: presence of soluble matter in stones.

👉Water Absorption Test: To check how much water the stone may absorb.

👉Hardness Test: To
determinethe surface abrasion resistance of stone.

👉Microscopic Test:
To check grain size, texture, pores, shakes etc of stone.

.
Topic: #Surveying


#SPECIAL_METHODS_OF_SPIRIT_LEVELLING

🎓 #Differential_levelling: it is the method of direct levelling the object of which is solely to determine the difference in elevation of two point regardless of the horizontal positions of the point with respect of each other. When the points are apart, it may be necessary to set up the instruments serveral times. This type of levelling is also known as fly levelling.

🎓 #Profile_levelling: It is the method of direct-levelling the object of which is to determine the elevations of point at measured intervals along a given line in order to obtain a profile of the surface along that line.

🎓 #Cross-sectioning: cross-sectioning or cross-levelling is the process of taking levels one each side of a main line at right angles to that line, in order to determine a vertical cross-section of the surface of the ground, or of underlying strata, or of both.

🎓 #Reciprocal_levelling: It is the method of levelling in which the difference in elevation between two points is accurately determined by two sets of reciprocal observations when it is not possible to set up the level between the two points.

🎓 #Precise_levelling: It is the levelling in which the degree of precision required is too great to be attained by ordinary methods, and in which, therefore, special equipment or special precautions or both are necessary to eliminate, as far as possible, all sources of error

https://t.me/engineer03
Topic: #Railway_Engineering

🎓 #Colour_Light_Signals: These are high intensity beam colour light signals, particulary used on electrified rail ways, both during day and night time.

🎓
#Coning_of_Wheels: The wheels are coned at a slope of 1 in 20 to prevent from rubbing the inside face of the the rail head and to prevent lateral movement of the axle with its wheels. This is known as coning of wheels.

🎓
#Creep_of_Rails: Creep is the longitudinal movement of rails in a track. It occurs due to several reasons. The effect of creep tends to drag the track if ballast is insufficient to hold the rails.

🎓
#Crossing_Clearance: The clear distance between the wing rail and the crossing rail is known as crossing clearance. This clearance is theoretically same as clearance at the throat but in practice it is slightly greater than at the throat.

🎓
#Crossing_Number: The number of crossing is defined as the ratio of spread (¡.e, distance between the point and splice rails at the leg of crossing, generally 30 cm.) to the length of crossing are designated by this number


https://t.me/engineer03
Building construction

Doors

🔸 A door may be defined as an openable barrier secured in a wall opening.

🔸 Technical Terms

1. Frame : It is an assembly of horizontal and vertical members, forming an enclosure, to which the shutters are fixed.

2. Shutters : These are the openable parts of a door or window. It is an assembly of styles, panels and rails.

3. Head : This is the top or uppermost horizontal part of a frame.

4. Sill : This is the lowermost or bottom horizontal part of a window frame. Sills are normally not provided in door frames.

5. Horn : These are the horizontal projections of the head and sill of a frame to facilitate the fixing of the frame on the wall opening. The length of horns is kept about 10 to 15 cm

6. Style : Style is the vertical outside member of the shutter of a door or window.

7. Top rail : This is the top most horizontal member of a shutter.

8. Lock rail : This is the middle horizontal member of a door shutter, to which locking arrangement is fixed.

9. Bottom rail : This is the lowermost horizontal member of a shutter.

10. Intermediate or cross-rails : These are additional horizontal rails, fixed between be top and bottom rails of a shutter. A rail fixed between the top rail and lock rail is called frieze rail.

11. Panel : This is the area of shutter enclosed between the adjacent rails.

12. Mullion : This is a vertical member of a frame, which is employed to sub-divide a Window or a door vertically.

13. Transom : This is a horizontal member of a frame, which is employed to sub divide a window opening horizontally.

14. Hold fasts : These are mild steel flats (section 30 mm x 6 mm), generally bent into Z-shape, to fix or hold the frame to the opening. The horizontal length of hold fast is kept about 20 cm, and is embedded in the masonry.

15. Jamb : This is the vertical wall face of an opening which supports the frame.

16. Reveal : It is the external jamb of a door or window opening at right angles to the wall face.

17. Rebate : It is depression or recess made inside the door frame, to receive the door shutter.

♦️ Size of doors

🔹 Common width height relation used in India

👉 Width :- 0.4 to 0.6 heights

👉 Height :- (width + 1.2 ) meter
🔸 Designation of door

👉 8DS20 means width (800mm), Height (2000mm), D (Door) & S (Single shutter)

👉 10DT21 means width (1000mm), Height (2100mm), D (Door) & T (Double shutter)

.
Building construction

Formwork

🔸 Formwork is a temporary ancillary construction used as a mould for the structure, in which concrete is placed and in which it hardens and matures.

🔸 The cost of formwork may be up to 20℅ to 25℅ of the cost of structure

🔸 The operation removing the formwork is commonly known as stripping

♦️ Stripping time for different components

👉 Walls, columns and vertical sides of beam : 24 to 48hr

👉 Slab soffits (Props left under) : 3 days

👉 Beam soffits (props left under) : 7 days

👉 Removal of props to slab :

1. Spanning upto 4.5m : 7days

2. Spanning over 4.5m : 14days

👉 Removal of props to beam and arches :

1. Spanning upto 6m : 14days

2. Spanning over 6m : 21days



https://t.me/engineer03
Civil Engineering
Types of Admixtures Used In Concrete ...cont... 5- Pozzolanic Admixtures Pozzolanic admixtures are used to prepare dense concrete mix which is best suitable for water retaining structures like dams, reservoirs etc. They also reduce the heat of hydration…
Types of Admixtures Used in Concrete ... conti...
7- Gas forming Admixtures

Aluminium powder, activated carbon, hydrogen peroxide are generally used gas-forming chemical admixtures. When gas-forming admixtures are added, it reacts with hydroxide obtained by the hydration of cement and forms minute bubbles of hydrogen gas in the concrete. The range of formation of bubbles in concrete depends upon many factors such as the amount of admixture, the chemical composition of cement, temperature, fineness etc. The formed bubbles help the concrete to counteract the settlement and bleeding problems. Gas forming admixtures are also used to prepare lightweight concrete. For settlement and bleeding resistance purpose, a small quantity of gas-forming admixtures which are generally 0.5 to 2% by weight of cement is used. But for making lightweight concrete larger quantity generally, 100 grams per bag of cement is recommended.

8- Air detraining Admixtures

Air-detraining Admixtures are used to remove the excess air from the concrete voids. Sometimes, the aggregates may release the gas into concrete and air-entrained is more than required then this type of admixtures are useful. Some of the most used air-detraining admixtures are tributyl phosphate, silicones, water-insoluble alcohols etc.

9- Alkali Aggregate Expansion Preventing Admixtures

Alkali aggregate expansion in concrete is happened by the reaction of alkali of cement with the silica present in the aggregates. It forms a gel-like substance and causes volumetric expansion of concrete which may lead to cracking and disintegration. Use of pozzolanic admixtures will prevent the alkali-aggregate reaction and in some cases, air-entraining admixtures are also useful. Generally used admixtures to reduce the risk of alkali-aggregate reaction are aluminium powder and lithium salts.

10- Anti-washout Admixtures

Anti-washout admixtures are used in concrete especially for an underwater concrete structure. It protects the concrete mix from being washed out underwater pressure. It improves the cohesiveness of concrete. This type of admixtures is prepared from natural or synthetic rubbers, cellulose-based thickeners etc.

11- Grouting Admixtures

Grouting admixtures are added to grout materials to improve the grout properties according to the requirement of the grout. Sometimes, there is a need for quick set grout and sometimes there is a need for slow set grout to spread into deep cracks or fissures. Hence, different admixtures are used as grout admixtures based on the situation. Accelerators like calcium chloride, triethanolamine etc. are used as grout admixtures when the grout is to be set rapidly. Similarly retarders like mucic acid, gypsum etc. are used to slow down the setting time of grout. Gas forming admixtures like aluminium powder is added to grout material to counteract the settle of foundations.
#share

https://t.me/engineer03
Civil Engineering
Photo
ኮስተባ
የህዝብ ግንኙነትና ኮሙዩኒኬሽን
ግንቦት 2012
የኮንስትራክሽን ስራዎች ተቆጣጣሪ ባለስልጣን የኮቪድ 19 ወረርሽኝን ተከትሎ በተቋሙ የሚመጡ ተገልጋዮች ቁጥር በጣም ከፍተኛ በመሆኑና ለወረርሽኙ ተጋላጭ የሚያደርገው አንዱ ንክኪ በመሆኑ ይህንን ለመቀነስ ብሎም ለማስቀረት እንዲሁም አገልግሎቱን ዘመናዊና ባሉበት ተደራሽ ለማድረግ በርካታ ስራዎችን በማከናወን ጫፍ ደርሷል፡፡ ስለሆነም ከተቋሙ ተገልጋዮች በቁጥር አንድ የባለሙያ ምዝገባ አንዱ በመሆኑ ሙሉ በሙሉ አገልግሎቱን በኤሌክትሮኒክስ በመቀየር ከግንቦት 25 ቀን 2012 ጀምሮ አገልግሎት በአካል ለሚቀርቡ ተገልጋዮች አገልግሎት የማይሰጥ መሆኑና ተገልጋዮች ባሉበት በመሆን እራሳቸውን ከወረርሽኙ በመጠበቅ በእጅ ስልካቸው እንዲሁም በኮምፒውተር ተጠቃሚ እንዲሆኑ ያሳስባል፡፡ ይህ ማስታወቂያ የሚመለከተው ለኮንስትራክሽን ባለሙያ ፈቃድ ብቻ መሆኑን እየገለጽን አጠቃቀሙን ከስር በአማርኛ እና በእንግሊዘኛ የለጠፍን በመሆኑ በመከተል አገልግሎቱን እንድታገኙ እናሳስባለን፡፡
---------------------------------------------------------------------------------
-----------------------------------------------------------------------------
የኤሌክትሮኒክ አገልግሎት

የኤሌክትሮኒክ አገልግሎት የተሰራው ዜጎች ኮምፒውተርና ኢንተርኔት ተጠቅመው የተለያዩ አገልግሎት ሰጪዎችን አገልግሎት በቀላሉ ለማግኘት እንዲረዳ ታስቦ ነው፡፡
የአገልግሎት ጥያቄ ለማቅረብ አንድ ዜጋ መጀመሪያ ባለው የተጠቃሚ ስም እና የይለፍ ቃል በማስገባት ወይም እንደ አዲስ ተጠቃሚ ተመዝግቦ የአገልግሎት ጥያቄ ማቅረብ ይቻላል፡፡ ተጠቃሚው ገብቶ የሚፈልገው የአገልግሎት ቅጽ ከመረጠ በኋላ አስፈላጊና መቅረት የሌለባቸው መረጃ በቀረበበት መጻፍያ ቦታ በመሙላት፣ አስፈላጊ ሰነዶችን በመጫን ጥያቄ ማቅረብ ይቻላል፡፡
ተጠቃሚው ጥያቄውን ካቀረበ በኋላ፤ የኤሌክትሮኒክ አገልግሎት መሳሪያው ለጥያቄው ልዩ የሆነ መለያ ቁጥር በመፍጠር ጥያቄው ለመከታተል እንዲያገለግል ለተጠቃሚው መልሶ ይልክለታል፡፡ ይህ መለያ ቁጥር የሚጠቅመው የአገልግሎት ጥያቄው ሁኔታ ለመከታተል፣ በአካል ለመገናኘት ቀጠሮ ለማስያዝ እና ተጨማሪ መረጃ ሰጪ ሰነዶችንና አገልግሎት ሰጪው የጥያቄው መፍትሄ በመጨረስ ሂደት ላይ እያለ ተጠይቀው የነበረ መረጃ ለመስጠት ያገለግላል፡፡
የኮንስትራክሽን ስራዎች ተቆጣጣሪ ባለስልጣንም በዋናነት ለምዝገባና ሰርተፊኬሽን ተገልጋዮች ይህን የኤሌክትሮኒክስ አገልግሎት ባሉበት ሆነው በመጠቀም አገልግሎቱን እንዲያገኙ ለማድረግ እየሰራ ይገኛል፡፡

እንዴት መመዝገብ እችላለሁ?
-------------------------------------
• ከላይ በስተቀኝ ካሉት አማራጮች ይመዝገቡ የሚለውን አማራጭ ይጫኑ
• ቅጹን ይሙሉ እና መዝግብ የሚለውን ይጫኑ
• በመቀጠል ከላይ በስተቀኝ ካሉት አማራጮች ግባ የሚለውን አማራጭ ይጫኑ
• ኢሜልዎን እና የይለፍ ቃልዎን ያስገቡ
• ግባ የሚለውን ይጫኑ

ማህደሬን እንዴት መቀየር እችላለሁ?
-----------------------------------------------
• የማህደር ስምዎን ወይም የኔ ማመልከቻ የሚለውን አማራጭ ይጫኑ
• በግራ በኩል ከሚገኙት አማራጮች ማህደርዎን ያሻሽሉ የሚለውን አማራጭ ይጫኑ
• ቅጹን ይሙሉ እና መዝግብ የሚለውን ይጫኑ

የይለፍ ቃሌን እንዴት መቀየር እችላለሁ ?
--------------------------------------------------------
• የማህደር ስምዎን ወይም የኔ ማመልከቻ የሚለውን አማራጭ ይጫኑ
• በግራ በኩል ከሚገኙት አማራጮች የይለፍ ቃሎን ይቀይሩ የሚለውን አማራጭ ይጫኑ
• ቅጹን ይሙሉ እና አስገባ የሚለውን ይጫኑ

ማመልከቻ እንዴት ማስገባት እችላለሁ ?
-------------------------------------------------
• ከላይ በስተቀኝ ካሉት አማራጮች ግባ የሚለውን አማራጭ ይጫኑ
• መነሻ ገጹ ላይ ከሚገኙት የአገልግሎት ዝርዝር የሚፈልጉበትን ይምረጡ
• የተመረጡትን አገልግሎት ከሚሰጡት አገልግሎት ሰጪዎች አንዱን ይምረጡ
• የማመልከቻ ቅጽ ትዕዛዙን አንብበው አስማማለሁ የሚለውን ይምረጡና ቀጥል የሚለውን ይጫኑ
• ቅጹን ይሙሉ እና አስገባ የሚለውን ይጫኑ
• ያስታውሱ! የመከታተያ ቁጥርዎን መያዝዎን እንዳይረሱ

ማመልከቻዬ የደረሰበትን ሁኔታ እንዴት መከታተል እችላለሁ ?
-------------------------------------------------------------------------------
• ከላይ በስተቀኝ ካሉት አማራጮች ግባ የሚለውን አማራጭ ይጫኑ
• የማህደር ስምዎን ወይም የኔ ማመልከቻ የሚለውን አማራጭ ይጫኑ
• በግራ በኩል ከሚገኙት አማራጮች ማመልከቻዬ መከታተል የሚለውን አማራጭ ይጫኑ
• ማመልከቻዎን ሲያስገቡ የተሰጥዎትን የመከታተያ ቁጥርዎትን በማስገባት ወይም ያመለከቱበትን አገልግሎት ከመረጡ በኋላ ፈልግ የሚለውን ይጫኑ፡፡

---------------------------------------------------------------------------------------------------------------------------------------------------------

e-serevice
www.eservices.gov.et
What is e-service?

How can I register?
• Click on register button from top right menu
• Fill in the form and click on register button
• Click on login button from top right menu
• Insert your email address and password
• Click login
How can I change my profile?
• Click on your profile name or on Track Application
• Click on update profile
• Fill in the form and click save
How can I change my password?
• Click on your profile name or on Track application
• Click on Update profile
• Fill in the form and click submit

How can I submit application form for any service?
• Login
• Select one service display on the homepage
• Select a provider of the service you choose
• Reade the instruction and select I agree at the bottom
• Click on continue
• Fill in the form and click submit
N.B Don’t forget to have your tracking number
How can I check the status of my application ?
• Login
• Click on your profile name or my application
• Click on track my application from the left side menu
• Insert your tracking number on the field or select the service that you want to track the status then click search