Stone masonry ( con’td from the above)

👉 The construction of stones bonded together with mortar is termed as stone masonry

🔸 Different types of stones
used for different purposes

1. Heavy engineering works : Granite, gneiss

2. Buildings situated in industrial towns :- Granite and compact sandstone

3. Pavements, railway ballast, doorsits and steps :- Granite slabs and slate

4. Electrical switch board :- Marble slabs and slate

5. Fire resistance works :- Compact sandstone

6. Carving and ornamental works :- Marble and laterite

7. Face work and architectural purposes :- Marble, granite closer gained sand stone


https://t.me/engineer03
Civil Engineering
How tall buildings resist the wind Wind is one of the most important factors that architects and engineers have to consider when designing tall buildings. As buildings become taller, they become exposed to the high impact of wind loads that can cause structures…
How tall buildings resist the wind
👉 tapering
tapering (gradual diminution of a width or thickness) a building as it rises is one method used to break up the uniformity that causes vortex shedding- which is an oscillating flow that takes place as wind moved around the top of tall structures creating low pressure areas in the downwind and pulling the structure with suction forces and causing them to sway back and forth. Tapered forms help tall buildings prevent vortex shedding because of the continuously changing plan dimensions over the building height making them less susceptible to severe across-wind direction vibrations. Kuala Lumpur’s Petronas Towers and The Shard in London(shown above), both use this technique to reduce the effect that high winds have on their structures.


https://t.me/engineer03
ደረጃ(Stair case)


1.step እርምጃ-ወደ ላይ ሲወርድ / ሲወርድ እግሩ የሚቀመጥበት የደረጃ ክፍል ፡፡

2. tread - የደረጃው አግድም ክፍል።

3. Riser-የደረጃ አንድ ቀጥ ያለ ክፍል ፡፡

4. String
-ደረጃዎቹን የሚደግፍ ዝንባሌ ያለው አባል ፡፡

5. Landing-በእያንዳንዱ በረራ መጨረሻ ላይ የቀረበው አግድም መድረክ ነው ፡፡

6. pitch(ማስገቢያ) - የደረጃው ቁመት ነው ፡፡

7. Hand railing-እጅን የሚደግፍ ደረጃ ያለው አዝማሚያ አባል ነው ፡፡

8. መውጣት እና መውረድ፡፡፡ ፡፡

9. balster- የ hand rail መደገፍያ ቀጥ ያለ መካከለኛ ድጋፍ ነው ፡፡

a good stair chxs

የሚከተሉት ጥሩ ደረጃ ባህሪዎች ናቸው ፡

10. ከህንፃው ከሁሉም ጎኖች በቀላሉ መድረስ አለበት

11. አየር መኖር አለበት

12. በእያንዳንዱ flight መጨረሻ ሰፊ landing ሊኖረው ይገባል

13. በመደበኛነት flight ውስጥ ከ 12 ደረጃዎች በላይ መሆን የለበትም።

14. የደረጃዎቹ መነሳት እና መሄዳቸው የተመጣጠነ መሆን ያለበት እና የflight መውጣት እና መውረድ ቀላል ነው ፡፡

15. የእጅ ጣውላ ቢያንስ በደረጃው በአንዱ በኩል መሰጠት አለበት

16. የደረጃው angle ከ 30 እስከ 45 ዲግሪዎች መሆን አለበት ፡፡

Stair types

Straight stairs
Quarter-turn stairs
Dog-legged stairs
Open-newel stairs
Circular stairs
Bifurcated stairs
Geometrical stairs
Spiral stairs

ደረጃዎች

ደረጃዎች ከሚከተሉት ማናቸውም ቁሳቁሶች ይገነባሉ ፡፡

የጡብ ማሳዎች ፣ የድንጋይ ንጣፍ ፣ ጣውላዎች ፣ ብረት ፣ የተጠናከረ የሲሚንቶ ኮንክሪት
1. STRAIGHT STAIR:
In this stair, all the steps are arranged continuously
along in one direction. One flight may be split into
one or more than one flight by interposing a
landing. This stair can be used where narrow and
long space is available for a staircase such as
entrance, porch etc.
Causes of foundation failure and removal measures



1,Poor Ground Preparation

Cut and fill situations should be properly prepared before the structure is started or it may result in improperly compacted soil beneath the foundation.

2,Transpiration

Vegitation, such as trees, shrubs, or other plants, near a foundation can affect moisture levels. Tree roots can dehydrate the soil beneath a home causing soil shrinkage and settlement of the home. Site clearance ላይ 20cm top layer ላይ ያሉ organic materials በደንም ማስወገድ ምክንያቱም organic property of soil affects engineering of soil

3,Drainage

Improper drainage will lead to excess moisture build-up, which could erode or consolidate soils. Excessive moisture may cause heaving of expansive clay soils. Remedial measure is proper drainage and compaction

4. Poor Building Site Preparation

Cut and fill situations, where the soil is removed from part of the building site and stacked on another, needs proper soil stabilization before a structure is built; otherwise unexpected movements of the soil beneath the foundation may occur.

5,Poor Ground Preparation

Cut and fill situations should be properly prepared before the structure is started or it may result in improperly compacted soil beneath the foundation.

6,Poor Soil Conditions

Poor soil, organics.....etc., may cause expansion or consolidation, which contribute to foundation failures. Using the correct foundation repair system can counteract the above conditions. Steel piers and helical piers are often the solutions for your basement or foundation.

https://t.me/engineer03
Honeycombs are hollow spaces and cavities left in concrete mass on the surface or inside the mass where concrete could not reach. These look like honey bees nest. Improper vibration and workability of concrete are main causes of honeycombs in concrete.
Honeycombs which are on sides are visible to naked eyes and can be detected easily as soon shuttering is removed. Honeycombs which are inside mass of concrete can only be detected by advanced techniques like ultrasonic testing etc.
main reasons are
Improper vibration during concrete.

Less cover to reinforcement bars

Use of very stiff concrete (this can be avoided by controlling water as per slump test).

Places like junction of beam to beam to column and to one or more beams are the typical spots where honeycombs are observed. This is due to jumbling of reinforcement of beams and column rods at one place; special attention is required at such place during concreting and vibrating.

Presence of more percentage of bigger size of aggregate in concrete also prevents concrete to fill narrow spaces between the reinforcement rods.

https://t.me/engineer03
CONSTRUCTION ENGINEERING TIPS
.

📄ASTM Abbrevation : American Society for Testing Materials

📄Grade of Concrete is denoted as Cement: Sand: Aggregate (Ex C-20 Grade : 1:2:3)
📄C/C means Center to Center Distance
📄DL means Development Length
📄Lapping of bars not allowed if the dia of bar is more than 36mm.
📄For circular column minimum of 6 longitudinal bars are used and 4 for Rectangular.
📄The minimum thickness of slab is 0.125m
📄Water pH value less than 6 should not be used for construction purpose.
📄The concrete Should not be thrown from a height more than 1.5m.
📄The Compressive strength of Bricks is 3.5 N /
mm
📄The initial setting time shall not be less than 30 minutes and the final setting time of cement is 10hours.
📄Dead Load means Self weight of Structure
📄Sand having moisture content more than 5% should not be used for Concrete mix.
📄DPC means Damp Proof Course. The thickness of DPC should not be less than 2.5cm.
📄Cube test is carried out for each 30m usage of concrete.
📄RMC : Ready Mix concrete, The concrete is made at factory and transported to the site, This type of concrete is used where there is a lack of space for mixing the concrete and used where a huge amount of concrete is required for construction.
📄The height of floor is usually 3m or 10ft (If a person asks you whats the height of 12 storied building?
Ans: 3m x 12floors = 36m)
📄A head mason can work 25-30m in a day.
📄In construction, the rate analysis for the work of workers is calculated in Man Hours. (Ex: 10 Birr for 1 Man hour)
📄Cantilever Beam has One fixed support and the other end is free.
📄Simple supported beam has a minimum of two supports.
📄PCC (Plain Cement Concrete) this type of concrete is used on members only when the tensile forces are not acting on it.
📄The weight of first class clay brick should be 3.85 Kg. and it has a crushing
strength of 10.5MN/m
📄Adding more water in the concrete mix to increase setting time leads to form
the Cracks or honeycomb in hardened concrete.
📄Vibration in freshly made concrete is done to remove the air bubbles in concrete mix.
📄Impermeability of concrete: The concrete which resists the the entry of water or moisture into it.
📄The concrete can be lifted to a maximum height of 50m using Concrete
Pumps.
📄The curing Period of RCC is 28days .
📄The minimum sill level height should be
44 inches.
📄The transverse reinforcement provided in columns are called Ties .
📄The transverse reinforcement provided in
Beams is called as Stirrups .
📄Stirrups in Beams and Ties in Column are provided to handle the shear force and to keep longitudinal bars in position.
📄The Prime reason for using steel as reinforcement is due to thermal expansion.
The thermal expansion
coefficient of concrete and steel is (approximately) same having value
📄C-25 grade of concrete is generally used in the construction of slab.
📄Weight of Bar is calculated using formula D /
162 (D = Dia of bar in mm)
📄The No. of HCB required for 1 metr square of masonary wall are 13 HCB blocks.
📄Specific gravity of Cement is 3.16g/ cm ; Bricks is 2g/cm ; Sand is 2.65g/cm ,
📄Standard Size of Brick is 19cm x 9cm x 4 cm or 19cm or 9cm x 9 cm
📄Floor area occupied by 50kg of Cement bag is 0.3m and height of 0.18m.
📄As per EBCS Maximum dia of bar used in the slab should not exceed 1/8th of the total thickness of the slab.
📄The slope or Pitch of the stair should be in between 25 degrees to 40 degrees.
📄The rise in stairs is in between 150mm to 200mm.
📄Tread in staircase is in between 250mm to 300mm.
📄Hook length should not be less than 9D (Dia of Bar)
📄Unit weight of PCC is 24KN/m , RCC is 25 KN/m , Steel is 7850Kg/m
📄The volume of 50kg cement bag is
1.3CFT.
📄Theodolite least count is 20Secs whereas Compass Least count is 30mins .
📄TMT bars : TMT means Thermo Mechanically treated bars
📄Cement more than 3 months old cannot be used for construction
📒The length of each bar from factory is 12m.

#Join_us_and_share_it
https://t.me/engineer03
ኤሌክትሪክ ስራ ለመስራት የሚያስፈልጉ የእጅ መሳሪያዎች/Hand Tools for Starting Electrical Work
🔹የኤሌክትሪክ ስራ ለመጀመር ብዙ አይነት የእጅ መሳሪያዎች አሉ። ነገር ግን ሁሉም ላያስፈልጉን ይችላሉ። ለጊዜ በዋናነት ብዙ ጊዜ የምንጠቀምባቸውን ለመግለፅ እሞክራለሁ።
🔹ነገር ግን በአግባቡ ልንጠቀምባቸው ይገባል። ይህ ካልሆነ አደጋ ሊያስከትሉብን ይገባል።
🔹አንድ ሰው የኤሌክትሪክ ለመስራት የሚከተሉት የእጅ መሳሪያዎች ሊኖሩት ይገባል።
🔸ጠመንጃ መፍቻ(sckrew driver)
🔸ኤሌክትሪሻን ቢለዋ(Electrician/pocket Knife)
🔸ፒንሳዎች(Pliers)
🔸የእጅ መጋዝ(hack saw)
🔸መዶሻ(Hammer)
🔸መሮ(Chisel)
🔸ውሃ ልክ(Level Gauge)
🔸ሜትር(Tape measure)
🔸መልቲ ሜትር(multi-meter)
🔸ኪያቬ መፍቻ (Wrench)
🔸የእጅ መብራት(Torch)
🔸ኤሌክትሪክ ገመድ መላጫ(Wire stripper)
🔸ሰርኪውት መፈለጊያ (circuit Finder)
🔸ቮልቴጅ ማረጋገጫ(Voltage Tester)
🔸ኤሌክትሪክ ገመድ መሳቢያ(Wire puller/Fish tape)
🔹መበየጃ(Soldering iron)
🔹የገመድ መጠን መለኪያ(Wire gauge)
🔹ኮንዲዩት ማጠፊያ(conduit bender)
🔹ሞረድ(Files)
🔹መምጠጫ(Sucker) ወ.ዘ.ተ. ሲሆኑ የእያንዳንዱን እገልግሎት ከዚህ ቀጥሎ እናያለን።

source:- Amen electronic

https://t.me/engineer03
የህንፃ ኤሌክትሪክ መስመር ዝርጋታ


1 .
መግቢያ/Introduction
2. ጥንቃቄ/Safety
3.መሰረታዊ የኤሌክትሪክ ፅንሰ ሀሳቦች/Basic Electrical Cnecepts
4.የኤሌክትሪካል ምልክቶች/Electrical Symbols
5.የእጅ መሳሪያዎች/Hand tools
6.የኢትዮጵያ የህንፃ ኮድ መመሪያ/EBCS
🔜የኤሌክትሪክ ገመድ ቀለም ደንብ/Electrical Wire color code
🔜የኤሌክትሪክ ገመድ መጠን/Electrical Wire Size
🔜የኤሌክትሪክ አክሰሰሪዎች ከመሬት ያላቸው ከፍታ/Electrical Accessories Height from floor
7.ኮንዲዩትና የኮንዲዩት አክሰሰሪዎች/Conduit & Conduit Accessories
🔜ኮንዲዩት/Conduit
🔜የኮንዲዩት አክሰሰሪዎች/Conduit Accessories
▪️ማጋጠሚያ/Coupler
▪️ስካቶላ/Junction(conduit)box
▪️ቤንድ፣ኤልቦው፣ቲ/Bend,Elbow,Tee
8.የኤሌክትሪክ ገመድ ዝርጋታና አሰራር /Electrical Installation & Wiring syetems
🔜የኤሌክትሪክ ገመድ አይነቶች/ Electrical Conductor types
🔜የኤሌክትሪክ ሽቦ ጫፍ አዘገጃጀት/Electrical wiring termination
🔜የኤሌክትሪክ ሽቦ አስተሳሰር ዘዴዎች/ Methods of Electrical wire splicing
🔜ሌይአዉትእና ወየሪንግ ስዕል/Layout and Wiring Diagram
9. ድሮዊንግ ማንበብና መረዳት (መተርጎም)/Read & Interprate working Drawings
10.መዳብ መቅበርና መከላከያ መሳሪያዎች አጠቃቀም/Earthing & Protective Devices
11. ሌሎች/Others
12. ከሰዎች ጋር አብሮ የመሰራት እና የደንበኛ አያያዝ ጥበብ/ Arts of Working with others & Customer handling

ይቀጥላል .......

https://t.me/engineer03
1.ኮንዲዩት/ፓይፕ ማጠፊያ (Conduit/Pipe Bender)

☑️በእሳትና በአሸዋ ወይም በእሳት ብቻ በመጠቀም (አብዛኞቻችን የምንጠቀምበት) ማጠፍ እንችላለን። ነግር ግን ጊዜ የሚያባክንና እጃችንም የሚጎዳ ስለሆን መሳሪያ መጠቀሙ አስፈላጊ ነው።
☑️ኮንዲዩት/ፓይፕ ማጠፊያ (Conduit/Pipe Bender) የተለያዩ አይነት ማጠፊያዎች/Benders ሲኖሩ ከነዚህም ዋና ዋና የሚባሉት የሚከተሉት ናቸው።
1.በእጅ የሚሰራ ማጠፊያ (Hand/manual bender)
2. ሀይድሮሊክ(Hadraulic)
3.ኤሌክትሪክ(Electric)
4.ሜካኒካል(Mechanical)
ሲሆኑ በቀላሉ ከቦታ ቦታ ለማንቀሳቀስ አመች የሆነው እና ለሳይት ስራ የሚሆነው በእጅ የሚሰራ ማጠፊያ (Hand/manual bender) ነው። ስለዚህ በዚህ ክፍል የምናየው ይሄን ይሆናል።
🔹በእጅ የሚሰራ ማጠፊያ (Hand/manual bender)
☑️መጠናቸው(sizes) አነስተኛ ለሆኑ ኮንዲዩቶች እና የኤሌክትሪክ ሀይል የሌለበት ቦታ ላይ በጣም ጠቃሚ ነው።
☑️መጠናቸው ከፍተኛ ለሆኑ ፓይፕ/ኮንዲዩት በተለይ ለቧንቧ ስራ ከላይ ከተዘረዘሩት ውስጥ እንደ አስፈላጊነቱ መርጦ መጠቀም ተገቢ ነው። ምክንያቱም ማጠፍ በፈለግን ጊዜ መሳሪያውን የምናቀሳቅሰው በእግራችን ወይም በእጃችን ስለሆን ከፍተኛ ሀይል/ጉልበት ስለሚጠይቅና አቅማቸውም ውስን ስለሆነ ነው ለትላልቆችና ብዛት የምናመርት ከሆነ ከላይ ከተዘረዘሩት ውስጥ መርጠን መግዛት አለብን።


https://t.me/engineer03
የቀጠለ...

☑️ መሳሪያውን ተጠቅመን ኮንዲዩት ለማጠፍ ልምምድ ማድረግ አስፈላጊ ነው በአንዴ በፈለግነው መልኩ ካላጠፍን ብለን መጨነቅ አይኖርብንም።
☑️አሪፍ ቤንድ ለመስራት ደረቻውን የጠበቀና ሪጅድ ኮንዲዩት መጠቀምም አስፈላጊ ነው።
☑️የእጅ ማጠፊያዎች በብራንዳቸውና በሞዴላቸው መሰረት ይልያያሉ። ነገር ግን በብዛት የሚታወቁት ሁለት ናቸው። እነርሱም:-
🔹ቤንፊልድ ማጠፊያ(Benfield Bender):-
☑️ከብረት የተሰራ ሲሆን ላዩ ላይ በፈለግነው የአንግል መጠን ኮንዲየቱን ለማጠፍ የሚረዱን ጠቋሚ ቁጥሮች አሉ።
🔸ጋርድነር ስልት መጠፊያ(Gardner Style Bender):-
☑️ከአሉሚንየም የተሰራ ሲሆን 45 ዲግሪና 90 ዲግሪ ላይ የምናስተካክልበት ደረጃ አለው።

https://t.me/engineer03
የቀጠለ...

🔹በበዛት የተለመደውና አብዛኛቻችን የምንስማማበት የኤሌክትሪክ አክሰሰሪዎች ከወለል ያላቸው ከፍታ:-

የክሰሰሪ ከወለል ያላቸው
አይነቶች ከፍታ በ cm
1. ማብሪያ/ማጥፊያ_____130-140
2.ሶኬት
_________________40-50
3.ዲስትሪቢዩሽን ቦርድ___170-175
4.ኪችን ሶኬት___________90-100
5.አኑንሴተር
_____________170-175
6.ቤል ስዊች_____________130-140
7. ቆጣሪ_________________175-180
8.ሻወር/መፀዳጃ ቤት
ሶኬት____________________180-200
9. ሻወር/መፀዳጃ ቤት ማብሪያ ማጥፊያ
__________________150

ማሳሰቢያ:- ከዚህ በፊትም እንዳልነው ዋናው ነገር ለአጠቃቀም ቀላልና ምቹ ማድረግ ነው። ስለዚህ ቦታው ላይ ያሉትን ነገሮች ታሳቢ በማድረግ እንደሁኔታው ከፍም ዝቅም ማለት ይችላል።

ይቀጥላል ......
ዒድ ሙባረክ!
عيد مبارك

እንኳን ለ1,441ኛው የኢድ አል-ፈጥር በዓል በሰላም አደረሰን ፤ አደረሳችሁ። በዓሉ የሰላም ፣ የፍቅር ፣ የመተሳሰብ ይሆን ዘንድ እንመኛለን!

ውድ ቤተሰቦቻችን በዓሉን ስናከብር የኮቪድ-19 ወረርሽኝን ለመከላከል የምንወስዳቸውን አስፈላጊ #የጥንቃቄ እርምጃዎችን እየወሰድን እንዲሆን አደራ ለማለት እንወዳለን!


عيد مبارك
መልካም በዓል ይሁንልን!

Civil Engineer’s Work

https://t.me/engineer03
1,ኮንዲዩት/Conduit:-

🔸ኮንዲዩት ወይም በአማረኛ ቱቦ ብለን የምንጠራው ሲሆን ለኤሌክትሪክ ወይም ለውሃ አገልግሎት የምንጠቀምባቸው የተለያዩ አይነቶች አሉ። እኛ የምናየው ለኤሌክትሪክ አገልግሎት የምንጠቀምባቸውን አይነቶች ነው።
🔸ኮንዲዩቶች ኤሌክትሪክ ለማስተላለፍ የምንጠቀምባቸውን ገመዶች ወይም ኬብሎች በወስጣቸው አሳልፈን በመዘርጋት ከሜካኒካል ወይም ከኤሌክትሪካል ጉዳት ለመከላከል ይረዱናል።
🔹 በውፍረትና በአይነት የተለያዩ ኮንዲዩቶች ስላሉ እንደ አስፈላጊነታቸው እንጠቀምባቸዋለን።
🔸ኮንዲዩቶች ባዋናነት በሁለት የከፈላሉ። እነርሱም:-
1.የብረት ኮንዲዩት/ steel/Metal coduit
2. የፕላስቲክ/plastic conduit
ናቸው።

🗝እያንዳንዱን እናያለን!

👇👇👇👇👇 https://t.me/engineer03
🔹🔸🔹1. የብረት ኮንዲዩት/ steel coduit:-
🔹የኤሌክትሪካል ገመዱን/ኬብሉን ከሜካኒካል ጉዳት መከላከል አስፈላጊ ሆኖ ስናገኘው እንጠቀመዋለን።
🔹በሶስት ዋና ዋና ክፍሎች ይከፈላል።
ሀ. ደረቅ የብረት ኮንዲዩት(Rigid Steel Conduit)
ለ. ታጣፊ የብረት ኮንዲዩት(Flexible Steel Conduit)
መ. የብረት ሆዝ(Metallic Hose)
ናቸው።👇👇👇👇👇👇👇👇👇👇 https://t.me/engineer03
🔹🔸🔹ሀ. ደረቅ የብረት ኮንዲዩት(Rigid Steel Conduit):-
🔸ለአጣቃቀም እንዲመች ሲባል እርዝመቱ 3 ሜትር ነው።
🔸🔹ጫፉ ላይ ጥርስ የመሰለ ነገር ያለው ሊሆን ይችላል/እኛ እራሳችን ጥርስ ልናወጣለትም እንችላለን። ጥርሱም የተለያዩ የብረት ኮንዲዩቶችን ለማጋጠም/ለማገናኘት ይረዳናል ~ከቤት ውጭ ለሆነ ዝርጋታ።
🔸በብረት ማጋጠሚያወች ተጠቅመን የብረት ኮንዲዩቶችን እናገናኛለን።
🔸ለንግድ ህንፃዎችና ለትላልቅ ህንፃዎች ኤሌክትሪክ ገመድ/ኬብል በውስጡ በማሳለፍ ለመዘርጋት ይጠቅማል።
🔸አሁን ላይ እየቀረ ያለ የኮንዲዩት አይነት ነው።
👇👇👇👇👇
https://t.me/engineer03
🔹🔸🔹ለ. ታጣፊ የብረት ኮንዲዩት (Flexible Steel Conduit):-

🔹ለገበያ የሚቀርበው በጥቅል ሲሆን አንዱ ጥቅልም እስከ 50 ሜትር እርዝመት አለው።
🔸 ለማጉበጥ/ለማጠፍ መሳሪያ አያስፈልግም።
🔹እረጅም እርቀት ላለው እና ሞቃት ለሆነ ቦታ ከፍተኛ ጥቅም አለው።

ይቀጥላል .....
👇👇👇👇👇 https://t.me/engineer03
#የኢትዮጵያ የህንፃ ኮድ መመሪያ/EBCS:-
☑️የኢትዮጵያ የህንፃ ኮድ መመሪያ/EBCS(Ethiopian Building Cod Standard) ላይ ብዙ ደንቦችና መመርያዎች የተዘረዘሩ ሲሆን በኤሌክትሪክ መስመር ዝርጋታው ዘርፍ ደግሞ የኤሌክትሪክ ገመድ ቀለም ደንብ(Electrical Wire and cable color code) ፣የኤሌክትሪክ ገመድ መጠን(Electrical Wire Size) እና የኤሌክትሪክ አክሰሰሪዎች ከመሬት ያላቸው ከፍታ(Electrical Accessories Height from floor) ዋና ዋናወቹ ናቸው።

ይጠብቁን ........

https://t.me/engineer03
👉Advance Security and
Performance Security 👆👆👆

.

1. Advance security
*ስራ ተቋራጩ ለሚወስደው የቅድም ክፍያ ገንዘብ በሚከፈለው የገንዘብ መጠን ልክ የሚያሲዘው የባንክ ዋስትና
ቦንድ ነው።
እውነተኛነቱ በተረጋገጠ ቼክ፣ ያልተገደበ የባንክ ዋስትና ወይም ከህጋዊ ጥቃቅን ማይክሮ ፋይናንስ የተፃፈ የዋስትና ደብዳቤ ማስያዝ ይኖርበታል።
ስራ ተቋራጩ የወሰደውን ቅድመ ክፍያ ከፍሎ እስኪጨርስ ያስያዘው ዋስትና ግዜው ማለቅ(Expire) አይችልም።
ከአንድ ወር ቀደም ብሎ የዋስትና ቀነ ገደቡ ከማለፉ በፊት ከአማካሪ በሚፃፍለት ደብዳቤ መሰረት ሊታደስ ይገባል።
ነገር ግን ስራ ተቋራጩ ያስያዘውን ዋስትና ቀነ ገደቡ አልፎ ሳያሳድስ ቢቀር ቀሪ ያልተከፈለ ቅድመ ክፍያ ሙሉ ለሙሉ ከሚቀጥለው ክፍያ ቅፅ ላይ ተቀናሽ ይደረጋል።
ስራ ተቋራጩ ያስያዘውን ዋስትና ቅድመ ክፍያ ገንዘብ ከፍሎ እንደጨረሰ ተመላሽ ይደረግለታል።
የተለየ የቅድመ ክፍያ እና የዋስትና አከፋፈል አካሔድ ለፕሮጀክቱ የተዘጋጀው ውል/special condition of contract/ ይችላል።
2. Performance Security
*ስራ ተቋራጩ ውል ተቀብሎ ተፈፃሚ ማድረግ የሚችልበትን ለብቃት ማረጋገጫ የሚያሲዘው ዋስትና ነው።
ውል በተፈራረመ በአስራ አምስት ቀናት ውስጥ (15) ውሉ የሚያዘውን መጠን ዋስትና ያቀርባል ።
ዋስትናው ስራ ተቋራጩ በተገቢው መንገድ ውሉን ተፈፃሚ ሳያደርግ ቢቀር ለውል ሰጪ (ባለቤት) እንደ ካሳ ክፍያ ይሆናል።
እውነተኛነቱ በተረጋገጠ ቼክ፣ የባንክ ዋስትና ወይም ከህጋዊ ጥቃቅን ማይክሮ ፋይናንስ የተፃፈ የዋስትና ደብዳቤ ውሉ ላይ
በተቀመጠው ፎርማት መሰረት ማስያዝ ይኖርበታል።
ይህ ዋስትና ሳይቀርብ ምንም አይነት ክፍይ ተፈፃሚ ሊደረግ
አይገባም።
ስራው ተጠናቆ እስኪያልቅ ይህ ዋስተና ተገቢ እና ቀነ ገደቡ ሳያልቅ መታደስ ይጠበቅበታል። ስራው ተጠናቆ ርክክብ እንደተፈፀመ በ ሀያ ስምንት(28) ቀናት ውስጥ ለስራ ተቋራጩ ሊመለስለት ይገባል። .