In ETAP Arc Flash analysis, the incident energy depends on:
Anonymous Quiz
89%
a) Fault current, clearing time, and working distance
3%
b) Transformer vector group only
8%
c) Load flow convergence method
0%
d) Cable length only
🔥1
ETAP Transient Stability analysis models:
Anonymous Quiz
42%
ETAP Transient Stability analysis models:
49%
Generator governor, exciter, and PSS (Power System Stabilizer)
2%
Only load damping
7%
Short-circuit currents only
😁1🤔1
Parallel transformers in ETAP must have:
Anonymous Quiz
20%
a) Same kVA only
72%
b) Same % impedance and vector group
7%
c) Same short-circuit level
2%
d) Same insulation
AC Load Flow Analysis Focuses on
Anonymous Quiz
86%
Real Power, Reactive Power, Voltage Magnitude and Phase Angle
9%
Resistive Losses and Voltage Drop Only
1%
Voltage Drop Only
4%
None of the Above
⚡1
400kv AIS Earth mat in Etap.pdf
104.7 KB
Earth Mat Design Using Etap for 400 kV AIS Substation – Preliminary Draft. The design is not yet finalized, and your valuable input will be highly appreciated
Please Take Part in the Poll
http://youtube.com/post/Ugkxw8xZsZM2cTovy9_lODEmKLAPwE47pRvi?si=w70uLwt7FLAUK0hd
http://youtube.com/post/Ugkxw8xZsZM2cTovy9_lODEmKLAPwE47pRvi?si=w70uLwt7FLAUK0hd
❤1
❤1
Electrical Design Engineering
https://forms.gle/9JdQUQDYMMThNNzP6
Only 15 people participated in the survey
This does not give me insights
Please take Part survey at least 100 people should participate so that I get some idea
This does not give me insights
Please take Part survey at least 100 people should participate so that I get some idea