Construction Solution- @Consite Media[የግንባታ ሥራ ተቋራጮች]🏗
3.59K subscribers
4.36K photos
142 videos
835 files
1.53K links
Addis Ababa, Ethiopia
Con-Site is a Comprehensive Construction Filed Works and Materials Reference Catalogue for Architects, Engineers, Consultants and Customer service.

t.me/ConsitesolutionBot ☜|]Chat us!
Buy ads: https://telega.io/c/consite
Download Telegram
የጨረታ ዝግጅት Excel (Tender Preparation )🏗
👉 work methodology
👉 company details linked excel
👉Tender Information
👉 Document Checklist
👉 Submission Review
👉Project / Experience Database
👉Personnel Database
👉Equipment Database
👉Financial Database
👉 Banks Database
👉Clients Database
👉Letter of Bid
👉Schedule 1 — Eligibility
👉Schedule 2 — Financial Capacity
👉Schedule 2 — Credit Facility
👉Schedule 3a — General Experience
👉 Schedule 3b — Specific Experience
20 Schedule 3c — Current Commitments
👉Schedule 7 — Equipment
👉Schedule 8 — Personnel
👉Schedule 12 — Sub-contractors

ሁኔታ በተዘጋጀው Tender Preparation Suite የኤክሴል (Microsoft Excel) መሳሪያ፣ ሙያዊ፣ ትክክለኛ እና ከ PPA 2025 መመሪያዎች ጋር ሙሉ በሙሉ የሚስማማ የጨረታ 📝
👇👇👇👇 (only for 24hrs)
https://ye-buna.com/product_landing?product=6a622abba3671_ConKey
ጥያቄ❓
የአንድ ፕሮጀክት Defect Liability period (365 ቀናት) ተጠናቆ ሲያበቃ Retention እንድንከፍል ስንጠየቅ የተፈጠረው Structural Defect ከተያዘው ገንዘብ በላይ ቢሆን ምን እናደርጋለን?

#መልስ-

በconstruction contract administration ውስጥ በጥንቃቄ መያዝ ያለበት ጉዳይ ነው። Defect Liability Period (DLP) 365 ቀን መጠናቀቁ ብቻ ማለት የStructural Defect ኃላፊነት በራሱ ያበቃል ማለት አይደለም።

በተለይ Structural Defect ከRetention ገንዘብ በላይ ከሆነ፦

1. Retention በቀጥታ አትክፈሉ። መጀመሪያ defect-ው በቴክኒክ እንዲረጋገጥ ያድርጉ።

2. Structural assessment/investigation በብቃት ባለው Structural Engineer/consultant ያስደርጉ። የdefect-ው መንስኤ፣ ክብደት፣ የመጠገኛ ወጪና የህንፃው ደህንነት ይረጋገጥ።

3. Contractor በcontract መሠረት እንዲያስተካክል በጽሑፍ ይጠየቅ። ችግሩ በContractor's defective workmanship/material/design ምክንያት ከሆነ፣ የመጠገን ኃላፊነቱ በRetention መጠን ብቻ አይወሰንም።

4. Retention ከጠየቀው ገንዘብ በላይ የሚያስፈልግ የrepair cost ካለ፣ በcontract ውስጥ ያሉ ሌሎች security/remedy provisions መሠረት ይመርመሩ። ለምሳሌ Performance Security አሁንም ተፈጻሚ ከሆነ ሊጠቀሙበት ይችላሉ።

5. ተጨማሪው ወጪ ከContractor እንዲመለስ የሚያስችለው የcontract clause ካለ መሠረቱን በግልጽ ይያዙ። Retention ብቻ እንደ “maximum liability” መቆጠር አይገባም፣ ይህ ግን በተፈረመው contract ቃላት ይወሰናል።

6. ክፍያ ለመልቀቅ ከመወሰን በፊት የFinal/Completion Certificate፣ defect notification፣ inspection report፣ structural assessment፣ repair estimate እና contract clauses አንድ ላይ ይመርመሩ።
በተለይ የሚለየው
DLP = 365 days ማለት በዚያ ጊዜ ውስጥ የታዩ defects እንዲታረሙ የContractor's contractual obligation የሚታይበት ጊዜ ነው። ነገር ግን ከ365ኛው ቀን በኋላ የተገኘ Structural Defect ላይ ኃላፊነት አለ/የለም የሚለው በContract Particular Conditions, GCC/PCC, applicable law እና defect-ው በመጀመሪያ መነሻው ላይ ይወሰናል።

ስለዚህ በጉዳዩ ላይ “365 ቀን አልቋል፣ Retention ክፈሉ” ብሎ ብቻ መወሰን ትክክል አይሆንም። Structural defect-ው በcontractor ኃላፊነት ውስጥ መሆኑ ከተረጋገጠ በመጀመሪያ የrepair/remedy ጉዳዩ መፍትሄ ማግኘት አለበት።
@consite🏗
👍6
Forwarded from Mule.B Tesfalidet
🧱New Point Bricks factory 新点砖厂🧱 Red brick:- This is the classic brick color that you see Quality with affordable price 🧱ጥራት ያላቸውን እና ለተለያዩ ለግንባታ አገልግሎት የሚውሉ የቀይ ሸክላ (ጡቦችን) እናመርታለን።
🧱 ለሙሉ የቤት ግንባታ፣
🧱ለባንክ ቤት ካዝና፣
🧱 ለግቢ አጥር ማጠሪያ፣
🧱 ለመንገድ ዳር ጠርዞች፣
🧱  ለሆቴሎች፣ሬስቶራንት፣እና ካፌዎች ማሳመሪያ ፣
🧱 ለx-ray ክፍሎች፣
🧱 ለፍሳሽ ማንዋሎች፣
🧱 ለኪችን ሲንክ ማስቀመጫ ፣
🧱 ለሻወር ገንዳ ማሰቀመጫ፣
🧱 የPBC ፍሳሽ ማስወገጃ ለመሸፈን፣
🧱 ለአበባ መትከያ
🧱 ለብረት ማቅለጫ ፈርኒስ፣
🧱 ለፒዛ ኦቭን፣
🧱 ለምድጃ፣
🧱 ለቆሻሻ ማቃጠያ፣
*We produced High quality clay bricks for various construction purposes.
🧱 For building construction,
🧱 For bank vaults,
🧱 Fence for the yard,
🧱 For road edges,
🧱 For Hotels,Restaurants,and Cafes decoration,
🧱 For x-ray rooms,
🧱 For manuals,
🧱 For kitchen,
🧱 For shower tray
🧱 To cover PBC drains,
🧱 For garden,
🧱 Furnace For steel factory,
🧱 For pizza oven,
🧱 For waste incinerator.... 🧱 For more information join our telegram channel https://lnkd.in/dYwC8nbg & Ticktok account @newpointbricksfactory 🧱Order now 📲0912854327,0902378888 🧱"Quality is our first priority" Thank you 谢谢🧱
🔺ታምራት ፕሌት እና ጄቦልት አቅራቢ🏗

📌ፕሌትና ጄቦልት በፈለጉት አይነት የተዘጋጀ አለን

✂️ላሜራ መቁረጫ መብሻና  ማጠፊያ ማሽኖች አሉን

🔗ፌሮ (ቶንዲኖ) ጥርስ እናበጃለን እንዲሁም እናጥፋለን

📐ማንኛዉንም የሞደፊክ ስራዎችን እንሰራለን

📍ኢትዮጵያ ዉስጥ የትም እንልክሎታለን!

➕➕➕➕➕➕➕➕➕
📍አድራሻችን፦ ቁ.1 አዉቶብስ ተራ(መሳለሚያ)
                    ቁ.2 መርካቶ
                    ቁ.3 ተክለሀይማኖት

📞0904040477
📞0911016833
Please open Telegram to view this post
VIEW IN TELEGRAM
👍8
Procurement of Building Renovation and Maintenance Work
Object of Procurement
Procurement of Building Renovation and Maintenance Work
Description
Procurement of Water Well Rehabilitation and Water Storage and Supply System
Lot Number
1
Clarification Request Deadline
Oct 7, 2026, 5:00 PM
Pre-Bid Conference Schedule
Not Applicable
Site Visit Schedule
Not Applicable
Bid Submission Deadline
Oct 19, 2026, 2:00 PM
Bid Opening Schedule
Oct 19, 2026, 3:00 PM

Annual Turnover
The Peak annual turnover for Water Supply System and Toilet renovation: -
The Bidder shall submit audited financial statements for the last 4 (Four) years (From January 2022 up to bid submission date) demonstrating a minimum Average Annual Revenue of ETB 20,000,000.00 Birr; calculated as total received for contracts in progress and/or completed within the last Five years divided by 5years and the report must be done by Chartered Certified Auditor

The Peak annual turnover for Water Well Rehabilitation: -:
The Bidder shall submit audited financial statements for the last 4 (Four) years (From January 2022 up to bid submission date) demonstrating a minimum Average Annual Revenue of ETB 15,000,000.00 Birr; calculated as total received for contracts in progress and/or completed within the last Five years divided by 5years and the report must be done by Chartered Certified Auditor.

Bid Security Amount
200,000 ETB
Bid Security Form For SME
Letter from Small and Micro Enterprise,
Bid Security Form For Local Bidders
Bank_Guarantee,
Bid Security Form For Foreign Bidders
Bank_Guarantee,
Notice
Terms and Conditions
The Ministry of Health reserves the right to reject the bid partially or fully
Apply online on EGP
https://production.egp.gov.et/egp/bids/all/tendering/f967f4ae-9a08-4078-83a9-93c4ddc9f9e2/open
👍4
የግንባታጨረታዎች +1👷‍♂🚧

ኢትዮጵያን ሄራልድ መስከረም  9ቀን 2019 ዓ. ም ዕትም ላይ የተወሰደ

@consite🏗
👍2
የግንባታ ጨረታዎች +1👷‍♂🚧
አዲስ ዘመን መስከረም 10ቀን/2019 ዓ. ም ዕትም ላይ የተወሰደ
@consite🏗
👍1
የግንባታ ጨረታዎች +2👷‍♂🚧
ሪፖርተር መስከረም 10ቀን/2019 ዓ. ም ዕትም ላይ የተወሰደ
@consite🏗
👍3