Civil Engineering Knowledge
1.38K subscribers
146 photos
1 video
2 files
21 links
Download Telegram
Confused about your career after graduation?
Want to upgrade your skills without leaving your job or college?

With College Vidya, explore UG, PG, MBA, and online programs from top universities.
βœ” Compare universities
βœ” Expert guidance
βœ” Flexible & affordable learning

πŸ‘‰ Fill the form now and get free career counselling.
https://track.elevarix.com/c?o=21692946&m=22168&a=746522&aff_click_id=%7Breplace_it%7D&mo=1yr_MBA_online
Site Engineer Dairy
Concrete Grade

M5 = 1:4:8
M10= 1:3:6
M15= 1:2:4
M20= 1:1.5:3
M25= 1:1:2

Clear Cover to Main Reinforcement :
1.FOOTINGS : 50 mm
2.RAFT FOUNDATION.TOP : 50 mm

3.RAFT FOUNDATION.BOTTOM/SIDES : 75 mm

4.STRAP BEAM : 50 mm

5.GRADE SLAB : 20 mm

6.COLUMN : 40 mm

7.SHEAR WALL : 25 mm

8.BEAMS : 25 mm

9.SLABS : 15 mm

10.FLAT SLAB : 20 mm

11.STAIRCASE : 15 mm

12.RET. WALL : 20/ 25 mm on earth

13.WATER RETAINING STRUCTURES : 20/30 mm


Weight of Rod Per Meter Length : Dia weight Per Meter :

6mm = 0.222Kg

8mm = 0.395 Kg

10mm = 0.616 Kg

12mm = 0.888 Kg

16mm = 1.578 Kg

20mm = 2.466 Kg

25mm = 3.853 Kg

32mm = 6.313 Kg

40mm = 9.865 Kg


Unit Conversions:

1feet-0.3048m

1m-3.28ft

1sq.m-10.76sq.ft

1cu.m-35.28cu.ft

1acre-43560sq.ft

1cent-435.6sq.ft

1hectare-2.47acre

1acre-100cent-4046.724sq.m

1ground-2400sq.ft

1unit-100cu.ft-2.83 cu.m 1 square-100sq.ft


1M Length Steel Rod its Volume :

V=(Pi/4)*Dia x Dia X L=(3.14/4)x D x D X 1 (for1m length) Density of Steel=7850 kg/ cub meter

Weight =

Volume x Density=

(3.14/4)x D x D X1x7850 (if D is in mm ) So = ((3.14/4)x D x D X1x7850)/(1000x1000) = Dodd/162.27


Design Mix M10 :

M10 ( 1 : 3.92 : 5.62)

Cement : 210 Kg/ M 3

20 mm Jelly : 708 Kg/ M 3

12.5 mm Jelly : 472 Kg/ M 3

River sand : 823 Kg/ M 3

Total water : 185 Kg/ M 3

Fresh concrete density: 2398 Kg/M 3

Design Mix M20 :

M20 ( 1 : 2.48 : 3.55)

Cement : 320 Kg/ M 3

20 mm Jelly : 683 Kg/ M 3

12.5 mm Jelly : 455 Kg/ M 3

River sand : 794 Kg/ M 3

Total water : 176 Kg/ M 3

Admixture : 0.7%

Fresh concrete density: 2430 Kg/ M 3


Design Mix M25 :

M25 ( 1 : 2.28 : 3.27)

Cement : 340 Kg/ M 3

20 mm Jelly : 667 Kg/ M 3

12.5 mm Jelly : 445 Kg/ M 3

River sand : 775 Kg/ M 3

Total water : 185 Kg/ M 3

Admixture : 0.6%

Fresh concrete density: 2414 Kg/ M 3

Note: sand 775 + 2% moisture, Water185 -20.5=164 Litres, Admixture = 0.5% is 100ml



Design Mix M30 :

M30 ( 1 : 2 : 2.87)

Cement : 380 Kg/ M 3

20 mm Jelly : 654 Kg/ M 3

12.5 mm Jelly : 436 Kg/ M 3

River sand : 760 Kg/ M 3

Total water : 187 Kg/ M 3

Admixture : 0.7%

Fresh concrete density: 2420 Kg/ M 3

Note: Sand = 760 Kg with 2% moisture(170.80+15.20)


Design Mix M35 :

M35 ( 1 : 1.79 : 2.57)

Cement : 410 Kg/ M 3

20 mm Jelly : 632 Kg/ M 3

12.5 mm Jelly : 421 Kg/ M 3

River sand : 735 Kg/ M 3

Total water : 200 Kg/ M 3

Admixture : 0.7%

Fresh concrete density: 2400 Kg/ M 3

Note: sand = 735 + 2%,

Water = 200- 14.7 =185.30,

Admixture = 0.7%


Design Mix M40 :

M40 ( 1 : 1.67 : 2.39)

Cement : 430 Kg/ M 3

20 mm Jelly : 618 Kg/ M 3

12.5 mm Jelly : 412 Kg/ M 3

River sand : 718 Kg/ M 3

Water Cement ratio : 0.43

Admixture : 0.7%

Note: Sand = 718 + Bulk age 1%


Design Mix M45 :

M45 ( 1 : 1.58 : 2.26)

Cement : 450 Kg/ M 3

20 mm Jelly : 626 Kg/ M 3

12.5 mm Jelly : 417 Kg/ M 3

River sand : 727 Kg/ M 3 + Bulk age 1%

Water Cement ratio : 0.43

Admixture : 0.7%


Design Mix M50 :

M50 ( 1 : 1.44 : 2.23)

Cement : 450 Kg/ M 3

20 mm Jelly : 590 Kg/ M 3

12.5 mm Jelly : 483 Kg/ M 3

River sand : 689 Kg/ M 3 + Bulk age 12%

Water Cement ratio : 0.36 (188 Kg)

Admixture : 1.20%3

Micro silica : 30 Kg

Super flow 6.7% of cement



Bricks:

1 cubic meter contains 500 bricksThe Standard size of the 1st class brick is 190mmx 90mm x90mm and motor joint should be 10mm thickSo brick with motor=200 x 100 x 100.Volume of

1st class brick = 0.19 x 0.09 X 0.09 =0.001539cu.m

Volume of 1st class brick with motor =0.2 x 0.1 x0.1=0.002cu.mNo. on bricks per 1cu.m= 1/volume of1st class brick with motor=1/0.002=500 no’s of bricks


Standard Conversion Factors :

INCH = 25.4 MILLIMETRE

FOOT = 0.3048 METRE

YARD = 0.9144 METRE

MILE = 1.6093 KILO-METER

ACRE = 0.4047HECTARE

POUND = 0.4536 KILOGRAM

DEGREE FARENHEIT X 5/9 – 32 = DEGREE CELSIUS MILLIMETRE= 0.0394

INCHMETRE = 3.2808

FOOTMETRE = 1.0936YARD

A rope having length 100cm.You can form any shape using this rope (Example: Triangle,Rectangle, etc.,). Which shape will covers maximum area

1 Newton = o.101971 kg

1 mm2 = 0.01 cm2

1 cm2 = 100 mm2
❀6
1 mm2 = 20 N100 mm2 = 2000N

1 cm2 = 2000N2000 N = 203.942 kgSo 20 N/ mm2 = 203.942 kg / cm2


Ratio As per IS 1:1.5:3 :

then volume is 1+1.5+3=5.5 and

the total volume for using mix=1.57 m3

then cement required=

1/5.5*1.57=0.285m3*1440=411 kg. (8+bag)

sand requried=1.5/5.5*1.57=0.471m3 aggregate required=3/5.5*1.57=0.853m3

the standard volume of dry mix mortar=1.57.. U can check it in IS code also.

Then volume is1+1.5+3=5.5 and the total volume for using mix=1.57 m3 then cement required=1/5.5*1.57=0.285m3*1440=411 kg.(8+bag)sand required=1.5/5.5*1.57=0.471m3aggregate required=3/5.5*1.57=0.853m3the standard volume of dry mix mortar=1.57.. U can check it in IS code


Material Calculation : Cement in Bags :

BAGS01. PCC 1:5:10 1440/5*0.45 129.60Kg 2.5902.

PCC 1:4:8(M 7.5) 1440/4*0.45 162.00Kg 3.2403.

PCC 1:2:4(M 15) 1440/2*0.45 324.00Kg 6.4804.

PCC 1:3:6(M 10) 1440/3*0.45 216.00Kg 4.3205

RCC 1:2:4(M 15) 144/2*0.45 324.00Kg 6.4806.

RCC 1:1.5:3(M 20) 1440/1.5*0.45 32.00Kg8.6407.

RCC 1:1:2(M 25) 370.00Kg 7.4008.

RCC M 30 410.00Kg 8.2009.

RCC M35 445.00Kg 8.9010.

RCC M40 480.00Kg 9.6011.

Damp Proof CourseCM1:3,20mm tk 1440/3*0.022 10.56Kg 0.2112. 2"tk precast slab

M15 324*0.05 16.20Kg 0.3213. 3"tk precast slab

M15 324*0.075 24.30Kg0.4914.

GC Masonry CM 1:7 1440/7*0.34 70.00Kg1.4015.

Brick Work CM 1:6 1440/6*0.25 60.00Kg 1.2016.

Brick Work CM 1:4, 115tk 1440/4*0.25*0.11510.35Kg 0.2117.

Grano Flooring CC 1:1.5:3 1440/1.5*0.45*0.0521.60Kg 0.4318.

Plastering CM 1:3, 12mm tk 1440/3*0.0146.72Kg 0.1319.

Wall Plastering CM 1:4,12mm tk 1440/4*0.014 5.00Kg 0.1020.

Laying Pressed Tiles Over CM 1:4, 20mm tk 1440/4*0.022 7.92Kg 0.1621.

Ceramic Tiles, Marble,Granite, Caddapah SlabCM 1:4, 20mm tk 1440/4*0.022 7.92Kg 0.1622.

Hollow Block MasonryCM 1:6, 200mm tk/m¬2¬ 10.00Kg 0.20


Sand Calculation in CFT :

01. Any Concrete Work(PCC, RCC) 0.45*35.315= 20.00

02. Damp Proof CourseCM `1:3, 20mm tk 1.00

03. 2"tk Precast slab M15 1.00

04. 3"tk Precast slab M15 1.50

05. SS Masonry in CM 1:7 15.00

06. Brick Work in CM 1:6 15.00

07. Brick Work in CM 1:4,115mm tk 2.00

08. Grano Flooring in CC 1:1.5:3 1.00

09. Plastering in CM 1:3, 12mm tk 1.00

10. Wall Plastering CM 1:4, 12mm tk 1.00

11. Laying Pressed Tiles over a CM 1:4, 20mm tk1.00

12. Ceramic Tiles, Marble, Granite, Cuddapah slab CM 1:4, 20mm tk 1.00




01. Any Concrete Work 32.00 cft

02. Grano Flooring in CC 1:1.5:3, 50mm tk 1.60cft

03. Grano Flooring in CC 1:1.5:3, 75mm tk 2.40cft

04. Grano Flooring in CC 1:1.5:3, 100mm tk 3.20cft

05. Bricks/cum 450.00 Nos

06. Size Stone/ cum 90.00 Nos

07. Rough Stone 10.00 cft

08. Bond Stone/ cum 10.00 Nos

09. Cement Paint/100 Sft 2.00 Kg

10. White Cement/100 Sft 2.00 Kg

11. Janathacem/100 Sft 1.50 Kg

12. Enamel Paint/100 Sft - 2 Coats 1.25 Litre

13. Wall Putty/100 Sft 10.00 Kg

14. Plaster of Paris/100 Sft 25.00 Kg

15. Distemper/100 Sft 2.00 Kg

16. Cement Primer 0.60 Litre0.40 Litre

17. Weathering CourseLime 12.50 KgBrick bats 32.00 Kg

18. Providing Sand Gravel Mix- CumSand 20.00 CftGravel 40.00Cft

19.WBM - 75mm tk - 1st Layer - 10 Sqm Metel(60-40 mm)35.00Cft Gravel 10.00 Cft

20. Pressed Tiles - Sqm 20.00 Nos

21. Hollow Block - 200mm tk 14.00 Nos

CONVERSION TABLE:

01. 1 RM 3.28 Rft

02. 1 Sqm 10.76 Sft

03. 1 Cum 35.32 Cft

04. 1 Inch 2.54 cm

05. 1 sft 0.09Sqm

06. 1 Acre 0.04 Hectare

07. 1 Hectare 2.47 Acres

08. 1 Cft 0.028 Cum

09. 1 Feet 12.00 Inch

10. 1 Feet 0.305 M

11. 1 Cum 1000.00 Litre


Unit weight

01. Concrete 25 kN/m3

02. Brick 19 kN/m3

03. Steel 7850 Kg/m3

04. Water 1000 Lt/m3

05. Cement 1440 Kg/m3

06. 1Gallon 4.81 Litres

07. Link 8" = 200mm

08. 1 Hectare 2.471 acr(10000m2)

09. 1 Acr 4046.82m2 = 100 cent


Development Length :

01. Compression 38d

02. Tension 47 & 60d

03. 1 Cent 435.60 Sft

04. 1 Meter 3.2808 ft

05. 1 M2 10.76 ft2

06. 1 Feet 0.3048m

07. 1 KN 100Kg

08. 1kN 1000N

09. 1 Ton 1000Kg = 10,000 N = 10 kN

10. 1 kG 9.81N


Cement Consumption:

M5=2.54Bg/m3,

M7.5=3.18Bg/m3,

M10=4.32Bg/m3,

M20=8.64Bg/m3,

M25=12.9 Bg/m3,

M40=500+100Kg/m3

Brick:
❀4
Water absorption 12 to 15%

Compressive strength = 36Kn/cm2

230mm Wall/m3 = 460 Bricks + 20Cft Sand +66Kg CementSSM 1:7/m3 = Slize 95 + Soiling 8 Cft +60.5 KgCurrent = 1000 Watts = 1 Unit,
πŸ‘3
πŸ‘5❀1πŸ‘1
❀1πŸ‘1
Soil Nailing
πŸ‘1
The Importance of 135-Degree Seismic Hooks in Reinforced Concrete Columns