NTPC is looking to set up around 30 GW of company-owned nuclear projects across various locations in the country in line with the government's ambition of having 100 GW nuclear capacity by 2047.
The power PSU is eyeing at least 2 GW of nuclear capacity as early as 2032.
#BIHARspecial
The power PSU is eyeing at least 2 GW of nuclear capacity as early as 2032.
#BIHARspecial
City-level statistical reports for 47 cities (population >10 lakh):-
• Nodal body: National Statistical Office (NSO) under MoSPI
Data Sources :
• PLFS (Periodic Labour Force Survey) —>Labour indicators
• ASUSE (Annual Survey of Unincorporated Sector Enterprises) —>Informal/unorganised sector
#CA2026
• Nodal body: National Statistical Office (NSO) under MoSPI
Data Sources :
• PLFS (Periodic Labour Force Survey) —>Labour indicators
• ASUSE (Annual Survey of Unincorporated Sector Enterprises) —>Informal/unorganised sector
#CA2026
The Kacchi Dargah–Bidupur Bridge (कच्ची दरगाह-बिदुपुर सेतु), span the river Ganges, connecting Kacchi Dargah near Deedarganj in Patna with Bidupur near Hajipur in Vaishali district in the Indian state of Bihar.
This bridge provides an easy roadway link between the northern and southern parts of Bihar and will connect two major national highways, linking NH 31 to NH 122B.
It is presently the second longest bridge above water in India.
#BIHARspecial
This bridge provides an easy roadway link between the northern and southern parts of Bihar and will connect two major national highways, linking NH 31 to NH 122B.
It is presently the second longest bridge above water in India.
#BIHARspecial