8เคตเคพเค เคตเฅเคคเคจ เคเคฏเฅเค เคเค เคฟเคค เคเคฐเคจเฅ เคตเคพเคฒเคพ เคฆเฅเคถ เคเคพ เคชเคนเคฒเคพ เคฐเคพเคเฅเคฏ เคฌเคจเคพ
#CA2025
#CA2025
๐ฏ1
Kiribati welcomes the New Year first because it lies east of the International Date Line in the worldโs earliest time zone (UTC +14), after the IDL was shifted eastward for national uniformity.
International Date Line (IDL) & Time Zones:
-->Earth is divided into time zones based on longitude; the Prime Meridian (0ยฐ) is the reference.
-->The International Date Line (~180ยฐ longitude) is the line where the calendar date changes.
-->When you cross the IDL westward, you add one day; eastward, you subtract one day.
International Date Line (IDL) & Time Zones:
-->Earth is divided into time zones based on longitude; the Prime Meridian (0ยฐ) is the reference.
-->The International Date Line (~180ยฐ longitude) is the line where the calendar date changes.
-->When you cross the IDL westward, you add one day; eastward, you subtract one day.
๐3
Need for climate resilient agriculture
1. Growing population: food and nutrition security
2. Rising pest attacks - ex locust
3. Economic : more than 50% population dependent on agriculture, stress in agriculture sector โ? Impact on industries , trigger inflation
Steps by government
1. ICAR's NICRA (2011): Demonstrates climate-resilient technologies (e.g., SRI, zero-till wheat, climate-resilient varieties).
2. National Mission for Sustainable Agriculture: Focus on rainfed areas, integrated farming, water efficiency, soil health.
3. BioE3 Policy: Positions CRA as key for biotechnology-led solutions.
4. Growing agritech sector with AI-enabled advisories, precision tools.
1. Growing population: food and nutrition security
2. Rising pest attacks - ex locust
3. Economic : more than 50% population dependent on agriculture, stress in agriculture sector โ? Impact on industries , trigger inflation
Steps by government
1. ICAR's NICRA (2011): Demonstrates climate-resilient technologies (e.g., SRI, zero-till wheat, climate-resilient varieties).
2. National Mission for Sustainable Agriculture: Focus on rainfed areas, integrated farming, water efficiency, soil health.
3. BioE3 Policy: Positions CRA as key for biotechnology-led solutions.
4. Growing agritech sector with AI-enabled advisories, precision tools.
โค1
๐๐ง๐๐ข๐ ๐ข๐ฌ ๐ญ๐ก๐ ๐ฌ๐๐๐จ๐ง๐-๐ฅ๐๐ซ๐ ๐๐ฌ๐ญ ๐ฆ๐จ๐๐ข๐ฅ๐ ๐ฆ๐๐ง๐ฎ๐๐๐๐ญ๐ฎ๐ซ๐ข๐ง๐ ๐๐จ๐ฎ๐ง๐ญ๐ซ๐ฒ ๐ข๐ง ๐ญ๐ก๐ ๐ฐ๐จ๐ซ๐ฅ๐:
The growing textile sector of Bihar, with famous brands and key sector players like Zeel, Aditya Birla, Aurelia, W and many more, Bihar is one of the best destination for textile units. With BIADA powering industrial growth and providing infrastructure, the state provides an investor friendly eco system.
At least now, BSNL users who donโt want to buy another SIM card may finally notice better call quality.
BSNL has launched Wi-Fi Calling (VoWiFi) across India, which means calls and SMS can work through Wi-Fi instead of mobile signal.
#CA2026
BSNL has launched Wi-Fi Calling (VoWiFi) across India, which means calls and SMS can work through Wi-Fi instead of mobile signal.
#CA2026
๐ฅ5
๐ธ๏ธBPSC WEB๐ธ๏ธ
Photo
New Projects
1. Kashmir-Mizoram Rail Link: Connected Kashmir Valley to rest of Indian Railways grid in North;
iconic lines over Chenab river
2. Sivok -Rangpo Line ( 45 km, Rs. 7,857 crore): Ambitious project connecting Sikkim to Indian
Railways for first time; 75% physical progress; Jiribam-Imphal line next
3. Dimapur-Kohima Line (82.5 km): To bring Manipur's capital into Railways network; extends fromDimapur station
4. Rishikesh-Karnaprayag line (125 km): Includes India's longest transportation tunnel (14.57 km yet to operate)
High-Speed Rail:
1. Mumbai-Ahmedabad HSR: Surat to Bilimora in Gujarat section ready by August 15, 2027; entire 508-km project by December 2029
2. Patna-Bihar Sharif project:
3. Bullet train
4. commissioning of advanced version NATPS Kavach 4.0 over 738 route km on
high-density corridors
5. 13 Amrit Bharat trains for migrant workers, 2 Namo Bharat Rapid Rail Services for inter-city
commuters
Electrification & Technology:
1. Broad-gauge network nearing 100% electrification
2. Hydrogen trains in pipeline
3. 2,626 railway stations solar-powered nationwide
Infrastructure:
1. Pamban bridge (2.08 km): Spanning Tamil Nadu, replaced 110-year-old cantilever bridge
2. Revives India-Sri Lanka transport via Palk Strait
3. Bairabi-Sairang line: Linked Mizoram's Aizawl to Indian Railways state capital
4. Chenab Bridge: World's highest railway arch bridge at 359 m above sea level
5. Chenab Multi Bridge: First cable-stayed bridge
Freight Performance (2025):
1. Freight loading: 3 billion tonnes (almost 2X from 1.6 bt, up 42 from nearly 7 billion passengers)
2. FY25 target: Technological advancement with commissioning
1. Kashmir-Mizoram Rail Link: Connected Kashmir Valley to rest of Indian Railways grid in North;
iconic lines over Chenab river
2. Sivok -Rangpo Line ( 45 km, Rs. 7,857 crore): Ambitious project connecting Sikkim to Indian
Railways for first time; 75% physical progress; Jiribam-Imphal line next
3. Dimapur-Kohima Line (82.5 km): To bring Manipur's capital into Railways network; extends fromDimapur station
4. Rishikesh-Karnaprayag line (125 km): Includes India's longest transportation tunnel (14.57 km yet to operate)
High-Speed Rail:
1. Mumbai-Ahmedabad HSR: Surat to Bilimora in Gujarat section ready by August 15, 2027; entire 508-km project by December 2029
2. Patna-Bihar Sharif project:
3. Bullet train
4. commissioning of advanced version NATPS Kavach 4.0 over 738 route km on
high-density corridors
5. 13 Amrit Bharat trains for migrant workers, 2 Namo Bharat Rapid Rail Services for inter-city
commuters
Electrification & Technology:
1. Broad-gauge network nearing 100% electrification
2. Hydrogen trains in pipeline
3. 2,626 railway stations solar-powered nationwide
Infrastructure:
1. Pamban bridge (2.08 km): Spanning Tamil Nadu, replaced 110-year-old cantilever bridge
2. Revives India-Sri Lanka transport via Palk Strait
3. Bairabi-Sairang line: Linked Mizoram's Aizawl to Indian Railways state capital
4. Chenab Bridge: World's highest railway arch bridge at 359 m above sea level
5. Chenab Multi Bridge: First cable-stayed bridge
Freight Performance (2025):
1. Freight loading: 3 billion tonnes (almost 2X from 1.6 bt, up 42 from nearly 7 billion passengers)
2. FY25 target: Technological advancement with commissioning