EBIMS BIM & Digital Transformation
1.2K subscribers
132 photos
2 videos
40 files
252 links
For BIM enthusiasts, information on BIM & Digital Transformation of the Construction sector in Ethiopia. How can we make it work. Discuss.
Download Telegram
BIM & Digital Transformation
Monday Tip – Week 27: Generative Design

Generative Design takes BIM and AI a step further by using computational methods to explore multiple design solutions based on defined requirements, constraints, and objectives.

Instead of asking “What is one possible design?”, generative design asks: “What are the best options available?”

To use Generative Design effectively, focus on:
• Define clear objectives – Establish what you want to optimize, such as cost, space, energy performance, constructability, or material usage.
• Set design constraints – Provide the rules and limitations the solution must respect, such as site boundaries, structural requirements, regulations, and client requirements.
• Explore multiple options – Generate and compare different design alternatives rather than relying on a single solution.
• Evaluate performance – Assess each option against measurable criteria to identify the most suitable solution.
• Keep human oversight – Designers and engineers remain responsible for evaluating options and making the final professional decision.

Tools such as Autodesk Forma and Autodesk Revit can support computational and generative design workflows.
Generative Design also depends on well-structured information and clearly defined requirements, making the principles of ISO 19650 highly relevant.

Don't just design one solution—use technology to explore better possibilities.
BIM & Digital Transformation
Monday Tip – Week 28: OpenBIM & Interoperability

BIM projects often involve multiple disciplines, organizations, and software platforms.

Interoperability allows these systems to exchange information without being locked into one software environment.

OpenBIM helps teams collaborate, share data, and maintain information throughout the project lifecycle.

To improve interoperability, focus on:
• Use open standards – Use formats such as IFC to exchange BIM information between different software platforms.
• Reduce data loss – Check model exports and imports to ensure important geometry and information are maintained during data exchange.
• Use BCF for issues – Building Collaboration Format (BCF) can help teams exchange coordination issues without transferring entire models.
• Define exchange requirements – Agree what information needs to be exchanged, in what format, and at which project stage.
• Test interoperability early – Test data exchanges before major deliverables to identify compatibility problems before they affect the project.

A key standard is ISO 16739, which defines the Industry Foundation Classes (IFC) data model for BIM information exchange.

This also supports the information management principles of ISO 19650, particularly around structured information exchange and collaboration.

The best BIM workflow is not about using one tool—it’s about making information work across tools.
BIM & Digital Transformation
Monday Tip – Week 29: BIM for Sustainability 🌱

Sustainability is becoming a key part of modern construction. BIM can help teams understand environmental impacts, optimise resources, reduce waste, and make better decisions throughout the asset lifecycle.

Key points:
Design for sustainability – Use BIM to compare design options and identify solutions that reduce energy use, carbon emissions, and environmental impact.
Reduce material waste – Accurate quantities and coordinated models can help minimise over-ordering, rework, and construction waste.
Use data to measure performance – Combine BIM information with energy, carbon, and material data to assess the environmental performance of a project.
Support the whole lifecycle – Consider sustainability from design and construction through operation, maintenance, refurbishment, and eventual demolition or reuse.
Enable better decision-making – Use BIM-based analysis to compare materials, systems, construction methods, and their environmental impacts before decisions are finalised.
Relevant Standards

ISO 19650 – Provides a framework for managing information throughout the asset lifecycle, helping ensure reliable and structured data is available for sustainability analysis.

ISO 14001 – Provides a framework for managing environmental performance and reducing environmental impacts.

Takeaway
BIM is not only about building better—it can help us build more sustainably, use resources efficiently, and make better decisions for the entire asset lifecycle.
👍1
እንኳን ለ፳፻፲፱ አዲስ ዓመት አደረሰን፣ አዲሱ ዓመት ብዙ የምንሰራበት እና ፍሬ የምናፈራበት እንዲሆንልን ምኞታችን ነው።
👍3
BIM & Digital Transformation
Monday Tip – Week 31: Reality Capture & Scan-to-BIM

Reality capture allows us to collect accurate information about existing physical conditions and bring it into the digital environment. Technologies such as laser scanning, photogrammetry and drones can create point clouds and digital models that support better design, construction and asset management decisions.

Key points:
Capture existing conditions – Use laser scanners, drones or photographs to accurately record buildings, structures and site conditions.
Improve design accuracy – Use point clouds and captured data to create reliable references for surveys, refurbishment and design development.
Compare design vs reality – Compare the BIM model with the physical construction to identify deviations, installation issues and potential quality problems.
Support construction progress – Regular reality capture can provide visual evidence of progress and help teams monitor what has actually been built.
Create a digital record – Combine captured information with BIM to create a reliable record of the asset for handover, operation and future maintenance.

Relevant Standards
ISO 19650 – Provides the information-management framework for organising, sharing and maintaining information generated through reality capture and BIM processes.

ISO 16739 (IFC) – Supports open exchange of structured BIM information, helping captured and modelled information move between different software environments.

Takeaway
Reality capture connects the physical world with the digital world—helping teams understand what exists, verify what has been built, and create better information for the future.
ለመላው የክርስትና እምነት ተከታዮች እንኳን አደረሳችሁ፣ መልካም በዓል ይሁንላችሁ።
👍1
BIM & Digital Transformation
Monday Tip – Week 32: Internet of Things (IoT) & Smart Buildings

The Internet of Things (IoT) connects physical assets, sensors and devices to digital systems, allowing buildings to generate and share real-time information. When combined with BIM, IoT can help create smarter, more responsive and more efficient buildings.

Key points:
Connect building assets – Sensors can monitor equipment, temperature, lighting, occupancy, energy use and other building conditions in real time.
Turn data into insights – Combine sensor data with BIM information to understand how spaces, systems and equipment are performing.
Enable predictive maintenance – Monitor equipment conditions and identify potential problems before they develop into major failures.
Improve energy efficiency – Use real-time information to identify unnecessary energy consumption and optimise building systems.
Support smart facilities management – Connect IoT data with asset information to help facilities teams make faster, evidence-based decisions throughout the building lifecycle.

Relevant Standards
ISO 19650 – Provides a framework for managing structured information throughout the asset lifecycle, helping BIM and IoT data be organised and used effectively.

ISO/IEC 30141 – Provides a standardised reference architecture for IoT systems, supporting consistent approaches to designing and integrating connected systems.

Takeaway
BIM provides the digital information about the asset; IoT provides real-time information about how the asset is performing. Together, they can help create truly smart buildings.
BIM & Digital Transformation
Monday Tip – Week 33: BIM for Facility Management

BIM should not stop when construction is complete. The information created during design and construction can provide valuable support for facility management (FM), helping owners and operators manage buildings more efficiently throughout their operational life.

Key points:
Manage asset information – Use BIM to maintain information about equipment, systems, locations, specifications, warranties and maintenance requirements.
Improve maintenance – Connect asset information with maintenance schedules to help teams plan inspections, servicing and repairs more effectively.
Find information quickly – Use the model and structured data to locate equipment, rooms and building systems without searching through multiple documents.
Support operational decisions – Combine BIM data with facilities-management systems to understand asset performance, costs, energy use and maintenance history.
Plan for the whole lifecycle – Maintain accurate information after handover so the BIM model continues to provide value throughout operation, refurbishment and future changes.

Relevant Standards
ISO 19650 – Provides a framework for managing information throughout the asset lifecycle, supporting the transition from construction information to operational information.

ISO 55000 – Provides principles and guidance for asset management, helping organisations manage assets and maximise their value throughout their lifecycles

Takeaway
A BIM model should not become a static handover file. When properly structured and maintained, it can become a valuable source of information for managing the asset throughout its operational life.
🚨CHOOSING YOUR DEPARTMENT : WHAT NO ONE TELLS YOU!

The Urban Center, in collaboration with Deluxe Furniture, presents, a half-day mentorship session designed for:

🎓 Grade 12 students
🎓 1st-year university students
👨‍👩‍👧 Students and their parents/guardians

Come meet professionals, ask the questions that actually matter, understand what different careers look like in practice, and make a more informed choice about your future.

📅 Saturday, OCTOBER 10, 2026
🕜 Doors open: 8:00 PM ፣ ቀን 8 ሰዓት
🕑 Session: 2:30 PM – 5:00 PM ፤ ከቀኑ 8፡30 እስከ 11፡00
🖥🤝 — digital + physical participation (hybrid session)

⚠️ ONLY BY REGISTRATION
🔗 Register here:
https://forms.cloud.microsoft/r/15qJzg6SWC
Don't choose your higher education based only on assumptions. Talk to the people actually doing the job.

#InformedChoices3 #TheUrbanCenter #CareerChoices #Grade12 #UniversityStudents #CareerGuidance #Mentorship #Ethiopia
Forwarded from Nobel Kassu
Dear Colleagues, Educators & Creative Professionals 👋🎓

I am currently collecting data for my MSc Project Management thesis research evaluating the feasibility of establishing an open-access Social Enterprise Digital Fabrication & Prototyping Laboratory (Fab Lab) in Addis Ababa.

I would really appreciate a few minutes of your time (2-3mins) to complete the survey, as well as your help sharing it with relevant colleagues and professional networks across Addis Ababa.

Thank you for your support!

https://forms.gle/brMrKLB5p539XAtz7
BIM & Digital Transformation
Monday Tip – Week 34: Cloud Collaboration in BIM

Cloud technology has transformed how project teams access, share and manage BIM information. Instead of relying on disconnected files and emails, teams can collaborate through a common digital environment, improving coordination, transparency and decision-making throughout the project lifecycle.

Key points:
- Use a Common Data Environment (CDE) Keep project information in a structured, centralised environment so stakeholders can access the right information for their role.
- Collaborate in real time – Enable designers, engineers, subcontractors and site teams to review information, share feedback and resolve issues more efficiently.
- Control information revisions – Use version control, approval workflows and revision histories to reduce the risk of teams working with outdated drawings or models.
-Access information anywhere – Give authorised project teams access to the latest approved information from offices, construction sites and mobile devices.
- Protect project information – Apply access permissions, authentication, backups and appropriate security controls to protect sensitive data and maintain information integrity.

Relevant Standards
ISO 19650 – Provides the framework for managing information through a CDE, including information status, revisions, approvals and controlled sharing throughout the asset lifecycle.

ISO/IEC 27001 – Sets out requirements for an Information Security Management System (ISMS), helping organisations manage information-security risks and protect digital project information.

Takeaway
Cloud collaboration is more than storing files online. It is about connecting people, processes and reliable information to make better project decisions.
BIM & Digital Transformation

Monday Tip – Week 35: Cybersecurity for BIM & Digital Construction

As construction projects become increasingly digital, protecting project information is essential. BIM models, drawings, asset data and collaborative platforms can contain sensitive information, making cybersecurity a shared responsibility for everyone involved in a project.

Key points:

- Control access to information – Give users access only to the information and systems they need for their roles, and review permissions regularly.

- Protect project accounts – Use strong passwords, multi-factor authentication (MFA) and secure login practices to reduce the risk of unauthorised access.

- Secure the Common Data Environment (CDE) – Apply appropriate permissions, revision controls and security procedures to protect drawings, models and project documents.

- Recognise cyber threats – Train project teams to identify phishing emails, suspicious links, malicious attachments and unusual requests to share sensitive information.

- Back up and recover data – Maintain secure backups and test recovery procedures to help minimise disruption caused by cyberattacks, accidental deletion or system failures.

Relevant Standards

ISO 19650-5 – Provides guidance on a security-minded approach to managing information throughout the built asset lifecycle, particularly where sensitive information requires protection.

ISO/IEC 27001 – Sets requirements for an Information Security Management System (ISMS), helping organisations identify, manage and reduce information-security risks.

Takeaway

A digital construction project is only as secure as its people, processes and technology. Protecting BIM information is everyone's responsibility—not just the IT team's.
👍1
BIM & Digital Transformation
Monday Tip – Week 36: The Future of BIM

BIM is evolving beyond 3D modelling into an integrated digital approach that connects people, processes, data and technology throughout the asset lifecycle. Artificial Intelligence (AI), digital twins, automation and real-time data are creating new opportunities to improve how we design, construct, operate and maintain buildings and infrastructure.

Key points:
- Embrace AI and automation – Use AI to support routine tasks, analyse project information, identify potential issues and improve decision-making, while maintaining professional oversight.
- Develop digital twins – Connect BIM models with operational data and sensors to understand asset performance, monitor conditions and support predictive maintenance.
- Connect systems and data – Promote interoperability and open standards so information can move effectively between design, construction, asset management and other digital platforms.
- Make decisions using data – Use reliable project information, analytics and dashboards to identify trends, manage risks, measure performance and improve outcomes.
- Invest in people and skills – Develop digital competence, encourage collaboration and support continuous learning so teams can adopt emerging technologies effectively.

Relevant Standards:

ISO 19650 – Provides a framework for managing information throughout the asset lifecycle, creating a foundation for connected digital workflows and future technologies.

ISO 23247 – Provides a framework for digital twins in manufacturing. It offers useful concepts for understanding digital twin architectures, although it is not a general BIM or built-environment digital twin standard.

Takeaway
The future of BIM is not simply about creating better models—it is about connecting reliable information, intelligent technology and skilled people to deliver better outcomes across the entire asset lifecycle.