Today's Tip
Did you know?
Today is Ethiopian NEW YEAR
They have their own calendar
Happy New year!
2013 E.C
Did you know?
Today is Ethiopian NEW YEAR
They have their own calendar
Happy New year!
2013 E.C
Today's Tip
Did you know?
first architect in history was Imhotep . As one of
the officials of the Pharaoh Djoser , he designed
the Pyramid of Djoser (the Step Pyramid ) at
Saqqara in Egypt in 2630 – 2611 BC. He may
have been responsible for the first known use of
columns in architecture.
@Architecturec
@Architecturec
Did you know?
first architect in history was Imhotep . As one of
the officials of the Pharaoh Djoser , he designed
the Pyramid of Djoser (the Step Pyramid ) at
Saqqara in Egypt in 2630 – 2611 BC. He may
have been responsible for the first known use of
columns in architecture.
@Architecturec
@Architecturec
Lec-8
👉How do I avoid cracks on concrete?
➡️We can call cracks always as the headache for Construction engineer’s but it can be prevented if several measures are taken.
▶️Generally cracks may form in plastic stage or in harden stage of concrete.
*⃣in case of plastic stage the climate plays vital role,to prevent cracks in early stage of concreting you have to consider the temperature variation of that area and you may vary W/C ratio accordingly.
*⃣In area of high temperature one can use wet gunny bags after the initial setting is reached it will reduce the escape of water causing shrinkage cracks And it will be better to concreting in early morning or evening as the temperature be low.
▶️Good workmanship and proper supervision is necessary if you are preparing concrete manually of machine mix at site,and it is not required in ready mixed concrete.
▶️Sometimes improper mixing concrete becomes porous and sometimes it becomes very stiff due to deficiency of water so that it must be mixed thoroughly as per mix design.
▶️If there is discontinuity in placing of concrete then the crack may form at that place so whenever discontinuity exist cement slurry must be poured up to 1 cm.
▶️Removal of voids is also necessary for that compaction of fresh concrete must be done sufficiently and over compaction should be avoided.
▶️Pozzolanic materials can be used and suitable admixture can be added and nowadays there is many synthetic binders are available in market which will increase the tensile strength of concrete and it depends on work condition and desired quality of the work.
▶️After all you have to take technical approach to avoid cracking of concrete and it includes
🚧Proper mix design of concrete.
🚧Preparation of concrete according to mix design.
🚧Placing of concrete before final setting takes place and avoiding the free fall of concrete when placing.
🚧Sufficient compaction by adopting proper method.
🚧Providing minimum specified cover by Standard code.
🚧Providing minimum reinforcements as per Standard code.
🚧Arranging proper formwork for the specified duration with proper supports.
🚧By avoiding the placing of any load before final setting time.
🚧Proper curing for at least seven days.
#ConcreteTechnology
@architecturec
@architecturec
👉How do I avoid cracks on concrete?
➡️We can call cracks always as the headache for Construction engineer’s but it can be prevented if several measures are taken.
▶️Generally cracks may form in plastic stage or in harden stage of concrete.
*⃣in case of plastic stage the climate plays vital role,to prevent cracks in early stage of concreting you have to consider the temperature variation of that area and you may vary W/C ratio accordingly.
*⃣In area of high temperature one can use wet gunny bags after the initial setting is reached it will reduce the escape of water causing shrinkage cracks And it will be better to concreting in early morning or evening as the temperature be low.
▶️Good workmanship and proper supervision is necessary if you are preparing concrete manually of machine mix at site,and it is not required in ready mixed concrete.
▶️Sometimes improper mixing concrete becomes porous and sometimes it becomes very stiff due to deficiency of water so that it must be mixed thoroughly as per mix design.
▶️If there is discontinuity in placing of concrete then the crack may form at that place so whenever discontinuity exist cement slurry must be poured up to 1 cm.
▶️Removal of voids is also necessary for that compaction of fresh concrete must be done sufficiently and over compaction should be avoided.
▶️Pozzolanic materials can be used and suitable admixture can be added and nowadays there is many synthetic binders are available in market which will increase the tensile strength of concrete and it depends on work condition and desired quality of the work.
▶️After all you have to take technical approach to avoid cracking of concrete and it includes
🚧Proper mix design of concrete.
🚧Preparation of concrete according to mix design.
🚧Placing of concrete before final setting takes place and avoiding the free fall of concrete when placing.
🚧Sufficient compaction by adopting proper method.
🚧Providing minimum specified cover by Standard code.
🚧Providing minimum reinforcements as per Standard code.
🚧Arranging proper formwork for the specified duration with proper supports.
🚧By avoiding the placing of any load before final setting time.
🚧Proper curing for at least seven days.
#ConcreteTechnology
@architecturec
@architecturec