Underground cables are laid at sufficient depth

A. To minimize temperature stresses
B. To avoid being unearthed easily due to removal of soil
C. To minimize the effect of shocks and vibrations due to gassing vehicles, etc.
D. For all of the above reasons

Answer: Option C
@power_system_engineering
In capacitance grading a homogeneous dielectric is used.
Anonymous Quiz
67%
A. Yes
33%
B. No
====End of mcqs_electrical_cables (Page -1)====
#mcqs_power_plant_engineering (Page -1),
Scroll Down ⤵️⤵️⤵️⤵️
Rankine efficiency of a steam power plant

A. improves in summer as compared to that in winter
B. improves in winter as compared to that in summer
C. is unaffected by climatic conditions
D. none of the above

Answer: Option B
—————————————————————
In a boiler installation the natural draught is produced

A. due to the fact that furnace gases being light go through the chimney giving place to cold air from outside to rush in
B. due to the fact that pressure at the grate due to cold column is higher than the pressure at the chimney base due to hot column
C. due to the fact that at the chimney top the pressure is more than its environmental pressure
D. all of the above

Answer: Option B
In Rankine cycle the work output from the turbine is given by

A. change of internal energy between inlet and outlet
B. change of enthaply between inlet and outlet
C. change of entropy between inlet and outlet
D. change of temperature between inlet and outlet

Answer: Option B
————————————————————
The draught produced by chimney of given height at given outside temperature

A. decreases if the chimney gas temperature increases
B. increases if the chimney gas temperature increases
C. remains same irrespective of chimney gas temperature
D. may increase or decrease

Answer: Option B
In ______ system fuel from a central pulverizing unit is delivered to a bunker and then to the various burners
Anonymous Quiz
17%
A. unit
33%
B. central
33%
C. power
17%
D. none of the above
End of mcqs_power_plant_engineering (Page -1)====
YouTube Channel 👉 ⚡️🎥 PSEnggRW

🟥🟧🟨🟨🟦🟪🟫⬜️⬛️
WhatsApp No: 📲+91 8895773940 (Text - Discuss-Prom Advt);

Email ID: CuriosityResearcherForever@gmail.com,
🟰🟰🟰🟰🟰
👥⚡️PSEnggRW Kutumb App 🎥 YT PSEnggRW

👍PSEnggRW FB Page 👥PSEnggRW FB Group

✖️EEsEnggW Twitter 📷ErCRForever Insta

▪️PSEnggRW Tumblr
Cables fault locator (Pict -3), #picture_of_the_day_PSEnggRW
This media is not supported in your browser
VIEW IN TELEGRAM
Motor Rewinding (Pict -4), #picture_of_the_day_PSEnggRW

—————————————
⚡️Support & Contact Us ⚡️Donate (₹)
Wiring of the Distribution Board with RCD (Pict -4), #picture_of_the_day_PSEnggRW
This media is not supported in your browser
VIEW IN TELEGRAM
Types of Transmission line tower with voltage levels (Pict -5), #picture_of_the_day_PSEnggRW