The same thing
24 subscribers
MPOS Diversification Finance
Download Telegram
Osasion public chain will start iterative deployment in the formal environment at 00:00 am on July 8th (GMT+8). After the deployment of the environment is opened, the volatility of the chain comes not only from the impact of the cloud provider`s bandwidth and international links.But also from the communication restrictions of the new protocol on the formal environment. There may be chain volatility, transaction behavior may report errors at the status confirmation end.The value of the controllable variable of GAP/Exceed limit in the Bayes system will return to a reasonable estimate, and the correction value will become extremely effective.
The volatility of the chain has a short-term peak, which is reflected in the instability of the external adjustment interface. Interaction and verification will be affected. The verification timeout of the chain will be unavoidable. Pay attention to avoid peak period operations.
In essence, there are multiple levels of data classification and retrieval during the performance improvement period. Each additional layer will increase the scale of computing power. Theoretically, the possibility of errors and BUGs will be accompanied. The wrong average value triggers the chain and will also be recorded synchronously. But it cannot be rolled back. This is a fact and one of the charms.
The Democratic Calibration Unlimited Parabolic Regression Protocol, one of the five most recent contracts of the internal control economic logic set by Osasion in the MPOS mechanism of the node activation end, may be accompanied by changes in the incentive mining pool data, which will usher in the underlying nested contract passive activation.
The public chain's record of ledger data discriminates piles and mines, forming a set of proof of work and trustworthy verification built into the MPOS side. The contracts nested in the Bayesian economic structure of the main network are changed and activated step by step. The computing layer and the verification layer bring huge pressure, and the foreseeable situation will intensify in the future. Osasion's future ecological application layer's DAO governs on-chain interaction and puts forward higher demands on the interaction capabilities of the chain. This is self-evident for the iteration and challenge of technology, which is a meaningful challenge verification.
Osasion is connected to the FDRPC collaborative hosting platform for the first time. Currently, 28 server configurations have been upgraded to match the data synchronization of the upgrade for load balancing testing. It also makes multi-threaded simultaneous calls on the distributed IP under the cluster, providing a test environment for the increase in computing power and the maximum bandwidth limit under multi-layer verification.
The official opening of the server indicates that the first phase of the construction of the physical side of the FDRPC protocol has been successfully completed, and the test network access is normal. It is expected that the cyclical calibration and the DC protocol activation contract embedded in the published economic model will occur after the optimization and upgrade of the main network's collaborative auxiliary interface in the near future.
At 9:32 am on July 15th (GMT+8), Osasion Wallet updated and released the V1.0.9 version. This update section includes the content of the DC protocol on the chain, optimizing the transaction data reaction rate on the chain and the activation page of the MPOS node, and updating the download components and community-side voting records. More new functions are urgently needed for users to explore.
At 5 am on July 22th (GMT+8), the unmined balance of the incentive mining pool is less than 1010000.00000000 UORA, the DC protocol was officially triggered, and the dormant nodes with a dormant revenue value greater than or equal to 400 UORA will no longer receive dormant revenue.
#Osasion With the three-phase optimization process and the authorization arrangement of the DC agreement, the new stress test of the actual environment is opened, and the recent dormant node pledge income distribution and maneuver will be affected. For a week from 00:00 am on July 31st (GMT+8), fluctuations will continue to accompany, and this part will not affect AUC mining.
#Osasion The arrangement of the DC protocol authority and the experimental adaptation of the blockchain browser data interface to the fragmented data will change the way of data calling and display on the chain. That is to say, there is a contradiction between updated data display and real-time data production, and the chain end has volatility. The staking income contract self-check replenishment of the dormant node and the merged block of the mining end, the abnormal display and the actual end data error are normal and irreversible. After the start of the adaptive contract package, the node status collection and self-checking replenishment contract work coincide for a short period of time, during which the activated nodes will immediately receive staking income, which cannot be interfered or stopped.
#Osasion will suspend UORA transactions on community-based OTC sites such as nixc-109p in Greater China and Europe reminding the inevitability of risks, and proactively launching its second-phase work process on stablecoins. At the same time, in line with the SEC`s concerns in the institutional response, it will now be separated from the transaction support within the centralized institution. #Osasion firmly supports the regulatory requirements for the industry put forward by international agencies such as FTAF and SEC.
In the current environment of the current industry and international financial turmoil, Osasion will accelerate the progress of the decentralized technology breakthrough process 1.0 of the core part of the stable currency UORA 2.0 in the white paper. The new compliance requirements will involve the specific requirements of UORA itself and its partners.
Facing the future, the new trading channel must be UORA's most concern in the future. In the plan, DEX with the same attributes will be selected as the starting position. At the same time, it also reminds that the core of the current Osasion's focus is still the economic experimental exploration of MPOS in the public chain system.
#Osasion combines pressure testing for on-chain blocks to adapt to link adjustments and cross-chain preparations. During this period, node activation will not be affected, but the block queue will continue. The duration is currently over 24 hours. Now enter Limit the state of lifting the ban and gradually release the data flow to enter the normal value of the normal state of mining.
Due to relevant factors such as IOS APP service platform providers and international policies, IOS users are affected. However, #Osasion is currently at an important stage. During this period, it is recommended that new node users avoid using the IOS terminal as much as possible.
The #Osasion NS-Relays Bridge function verification is completed, and the test network monitoring deployment is officially launched for the full link. It is expected that the Diana upgrade migration and main network protocol layer embedding will be launched within a week.
#Osasion will suspend all on-chain interactive functions such as node creation and asset transfer on the chain end (old Osasion wallet) from 00:00 (UTC+8) on September 24, 2021. Only the functions of importing and exporting private keys and address balance inquiries are reserved.
#Osasion will open the old version of Osasion wallet user data migration from 18:00 (UTC+8) on September 26, 2021. At that time, the old version of the APP will be upgraded to open the binding function, and the nodes that are bound to the account will complete one-click migration.
The data migration component of the new version of #Osasion APP has been updated, and the NS-Relays Bridge verification set relay chain cross-chain bridge access. It is expected that the deployment of the security control plug-in environment for the old version of #Osasion APP wallet migration will be completed on the 28th, and the user node data migration will be open at that time.