Guys our channel is Public now. Recently we got messages that some students are asking for invite link. Joining this channel does not need any link.
Just open search API-Ace Petroleum Engineering and our channel will appear in open telegram search. If u find someone who's asking for link..then pls help them. ππ
Just open search API-Ace Petroleum Engineering and our channel will appear in open telegram search. If u find someone who's asking for link..then pls help them. ππ
πNote: Guys.. Answer key to all the poll questions asked in a week here will be released on saturday or sunday.
https://qr.ae/pNybRp We wrote strategies on how you should prepare for GATE in PE here. ππΌππΌHope this will be helpfulππΌ
Quora
How should I prepare and which books should I refer to for petroleum engineering in the GATE? - Quora
First of all, Let me enumerate some books which I feel every Petroleum Engineers should read during graduation, GATE preparing candidates in particular. 1. Drilling Engineering * Heriot-Watt-University-Drilling Engineering (particularly good for C...
SP log base line shift will take place when salinity difference between the beds seperated by shale is____________
Anonymous Poll
34%
Low
66%
High
If your basics are clear, then follow Buon Guo, for Artificial Lift. Uploading SRP section from "Well design by Cole craft", ...but I donot have full book pdf, it's good for SRP it contains numericals that will clear all your doubts.ππ»ππ»
ππ»ππ»HERIOT WATT BOOKSππ»ππ»
Unconventional are reservoirs with permeability less than______mD
Anonymous Poll
41%
.01
34%
.1
19%
1
5%
10
π΄π΄Helpful Material for ONGC INTERVIEWπ΄π΄ππ»
We are on Instagram as @apigateinpetroleum.
Install the app to follow our photos, GATE quizes, Petroleum Eng. updates and videos.
ππ https://www.instagram.com/invites/contact/?i=1dfqn2bsn208e&utm_content=gk2etby
Install the app to follow our photos, GATE quizes, Petroleum Eng. updates and videos.
ππ https://www.instagram.com/invites/contact/?i=1dfqn2bsn208e&utm_content=gk2etby
Isochronal test is best suited to_____
Anonymous Poll
37%
a) High permeability reservoir
39%
b) Low permeability reservoir
24%
c) Both (a) and (b)
Guys it's very simple sometime when flow and pressure follows a quadratic or exponential relations, then we require 2 or more equations to get the right solution as we do in maths, more the unknown parameters more equations will be required.
Now, initially we were using flow after flow test. In FAF test a fixed flowrate is maintained until a stablised flow pressure is acheived.
One more important thing is that, time to reach stablisation is inversely prop to permeability. Now, for high permeability reserv. Time to reach stablisation pr was less. And flow after flow used to be completed in lesser time.
Now when the perm is less then time to stablisation press increases and hence it becomes time consuming to use FAF test.
So we started a new approch that is ISOCHRONAL (drawdown+buildup) test... From it's name itself, its iso+chronal=equal time of flow yest. Here, flow times are equal, irrespective of wheather the stablised flow pr is reached or not BUT, buildup continues until the stablised reser pr is reached..., Due to equal small interval flow times the overall test time is reduced and hence it consumes lesser time.
That's why isochronal test is used preferebly in low perm reservoirs, where FAF takes large time to complete..
Hope u understand.
Now, initially we were using flow after flow test. In FAF test a fixed flowrate is maintained until a stablised flow pressure is acheived.
One more important thing is that, time to reach stablisation is inversely prop to permeability. Now, for high permeability reserv. Time to reach stablisation pr was less. And flow after flow used to be completed in lesser time.
Now when the perm is less then time to stablisation press increases and hence it becomes time consuming to use FAF test.
So we started a new approch that is ISOCHRONAL (drawdown+buildup) test... From it's name itself, its iso+chronal=equal time of flow yest. Here, flow times are equal, irrespective of wheather the stablised flow pr is reached or not BUT, buildup continues until the stablised reser pr is reached..., Due to equal small interval flow times the overall test time is reduced and hence it consumes lesser time.
That's why isochronal test is used preferebly in low perm reservoirs, where FAF takes large time to complete..
Hope u understand.
Now, here in isochronal test, there was one minor limit of this approach, that is, in this different buildups period were kept till the stablised reservr pressure was reached.
So at last we did one modification in Isochronal that we were starting flow period without letting the buildup period reservoir press to stabilise. i.e. In this, buildup and drawdown period were kept fixed independently, without letting any pressure to stablise either in buildup or drawdown period.
This test reduced the time of test than the isochronal test. This is applicable in low to very low permeability formation aka MODIFIED ISOCHRONAL TEST.
So at last we did one modification in Isochronal that we were starting flow period without letting the buildup period reservoir press to stabilise. i.e. In this, buildup and drawdown period were kept fixed independently, without letting any pressure to stablise either in buildup or drawdown period.
This test reduced the time of test than the isochronal test. This is applicable in low to very low permeability formation aka MODIFIED ISOCHRONAL TEST.
π΄Key of question from 17th may onwardsπ΄
B
C
B
B
B
A
B
C
B
B
B