Indian Development News 🇮🇳
20.7K subscribers
16.1K photos
1.96K videos
42 files
16.2K links
Subscribe for fastest updates on Economy, Infrastructure,Geopolitics,Defence,Sports and Govt. policies of India.
Download Telegram
Wow
🤣69👍13👏2
Indian Development News 🇮🇳
Wow
This media is not supported in your browser
VIEW IN TELEGRAM
If BJ Party can't manage the collapse of civillian administration then let's just handover the country to the military and end this nonsense of democracy forever.

Otherwise keep the armed forces out of your political stunts.
💯84👎102
C2i Semiconductors tapes out AI server power chip, eyes global data centre supply chain

Indian #semiconductor startup C2i Semiconductors has taped out its first smart power-stage chip for AI servers, as it looks to enter the global market for high-performance power management components used in data centres.

In semiconductor design, "tape-out" is the final phase where the blueprint of a chip is completed and sent to the manufacturing facility (the fab) for production.

The Bengaluru-based startup is building "smart power stage" chips — components that regulate (more specifically, reduce) and convert electricity before it reaches high-performance GPUs and CPUs inside AI servers.

Backed by a recent $16.7 million funding round led by Peak XV Partners, C2i is targeting a market currently dominated by large US, Japanese and European semiconductor firms

#MakeInIndia #Startups
https://t.co/Q7rfaRqu8J
🎉276👍1
Zoho-backed Netrasemi’s A2000 #AI chipset has achieved silicon bringup and is moving towards commercial production for smart vision, robotics and industrial automation.

Silicon bring-up is the initial testing process where newly fabricated microchips (silicon) arrive from the foundry and are powered on for the very first time. The goal is to safely initialize the hardware, verify basic electrical and functional operations, and bring the chip to a working state.

#semiconductor #startups
https://t.co/x3GqqZeTHi
❤‍🔥497👍2
The RFP issued by MoD for the first AMCA prototype (P1) says that it must be ready within 24 months of contract signing i.e. sometime in 2029. Then its first flight must be within the next 180 days i.e. end of 2029.

Flight of P2 must take place within 7 months of P1 i.e. 2030. The timeline for the first flight of

P3 is 9 months later, for P4 another 6 months.

And finally P5 around 2035.

After mandatory 1,800 sorties are carried out before the end of 2035, the Series Production will start.

USA took around 6 years for rolling out the F22 prototype and 5years + for F35 prototype .

Timelines : The timelines for milestones M1, M2, M9 and M14 are mandatory. All other milestones are indicative.

#Aviation #Defence
💯41
🤣48👎1👻1
Our Unique Relationship with a Huge Power, India.
I’ll say this, we face delegitimization in much of the World — but not in India

– Israeli PM Benjamin Netanyahu

#Geopolitics
❤‍🔥64👍15🤬2🤔1
Indian Embassy in Kyiv, Ukraine

#ForeignAffairs
35👍7
🇮🇳🤝🇱🇰 India has donated 134 Police Cabs to Sri Lanka. #ForeignAffairs
👍5110
Chennai-based HILD #Defence has bagged a contract from the Indian Army for the supply of Atlas mortar-dropping quadcopters & Talon FPV #drones.
🔥467👎1
Indian Development News 🇮🇳
Wow
Can we bring something like this for National Level Exams?

Seems the last option from Paper Leaks now #Opinion
👍43👎5
🇷🇴🇷🇺 Romanian Defence Ministry confirms Russian Drone Stuck the Country #InternationalNews
👍23😱4
Hyderabad’s BluJ Aerospace unveiled Gen #2, its first commercial-grade eVTOL on VANTIS platform, now in active flight testing.

Fully battery-powered with lift+cruise, it targets 200+ kg payload under 500 kg MTOW for heavy logistics, following Gen #1’s 500 kg class demo.

In future VANTIS scales upto 1-ton cargo and hydrogen-electric passenger variants. BluJ has pilots with Power PSU and defence primes. #Drones #Defense
[Source]
22👍9👎1
India wasted 300 GWh of clean power in Q1 2026 as coal plants ignored the 40% minimum load mandate, blocking solar from the grid.

Curtailment was due to transmission constraints and thermal plants not reducing output, citing higher costs, reduced plant life, and no clarity on compensation. The deadline is now pushed to 2027.

34 GWh was curtailed on March 30, 2026 alone. 20 GW of renewable capacity faces 5+ month connectivity delays in FY27, and 25% of transmission projects for 2026-27 are delayed over a year.

Coal plant load factors fell to 55% in 2023-24 from 85% in 2009-10, expected to hit 40%. #Power
👍233👎3🤣2😢1
IPL Biologicals opened Phase-I of its ₹400 cr, 12-acre cGMP plant in Vadodara Thursday.

Built for ₹200 cr, the automated ZLD facility has 50 KL/day capacity — 60% biofertilizers, 40% biopesticides. Phase-II will double it to 100 KL/day. Total capacity with Uttarakhand: 70,000 L/day.

Plant has SCADA(near-zero human intervention) controls, 500 kW solar. it aims to cut chemical fertilizer use 50%, lower costs, and restore soil.

Launched with Yuvraj Singh, IPL serves 45M+ farmers in 27 countries. FY26 revenue: ₹285 cr; targets exports at 5% in 2 years, 40% in 10 years. #Agriculture
[Source]
🙏157
Megha Engineering and Infrastructures Ltd is building a 980 KTPA Polypropylene Unit — the 2nd-largest — at the HRRL Barmer complex in Rajasthan.

Over 40% complete and set for commissioning in late 2026, This project aims to boost domestic polymer production and reduce import dependency.

The project includes a Butene-1 plant producing high-purity gas for stronger, flexible polyethylene. #MakeinIndia

🔗Official MEIL Group
🔥26
Project 75I Submarine Project got approval from DAC in November 2007

Now finally it has been cleared from the Finance Ministry in May 2026, after 18½ Years

Now Final Approval of CCS is pending

According to the timeline it will take 7 Years after the deal is signed to deliver the First Submarine...

#Defense
🤬32👍21🙏2
Indian Development News 🇮🇳
Project 75I Submarine Project got approval from DAC in November 2007 Now finally it has been cleared from the Finance Ministry in May 2026, after 18½ Years Now Final Approval of CCS is pending According to the timeline it will take 7 Years after the…
Just Look at the condition of our Conventional Submarine Fleet due to all this mess

Navy is Operating 40 Years Old Shishumar Class Submarines... And there is no replacement for such Submarines for the coming 7-8 Years even in best Case Scenario

And knowing all this Government was sitting on the Files instead of Showing Urgency, and we still don't know when will the Final Deal be signed
🤬43🌚51👻1👀1