/var/log/DMIT-NOC.log pinned «HKG Scheduled Maintainance: Since Insufficient resources and network upgrade, we are going to upgrade our HKG Core Network at Monday Dec 9, 2019( Hong Kong Time ). It takes hours, please be prepared.»
Because the update of WHMCS conflicts with our API; This resulted in some VMs control panel connection errors and control panels were inaccessible. It has been fixed now.
PayPal Event:
Once you paid your invoice by PayPal, you will get a 6% cashback in DMIT Credit from today to Dec 20, 2019 for any LAX Invoice.
Sales.
Once you paid your invoice by PayPal, you will get a 6% cashback in DMIT Credit from today to Dec 20, 2019 for any LAX Invoice.
Sales.
/var/log/DMIT-NOC.log
At Dec 12 02:15AM, it takes hours.
Mostly done, except CW IPv6 Session, and CERNET IPv4 optimization.
NOC will update the customize PVE-Firewall on all DMIT PVE nodes within 48 hours. The wrong design of PVE-Firewall leads to packet loss in the Linux Kernel(The ARP packet loss will lead to disconnection). We have fixed it in our test environment. After that, we will start to maintenance our own Proxmox branch under the stable master branch.
/var/log/DMIT-NOC.log
NOC will update the customize PVE-Firewall on all DMIT PVE nodes within 48 hours. The wrong design of PVE-Firewall leads to packet loss in the Linux Kernel(The ARP packet loss will lead to disconnection). We have fixed it in our test environment. After that…
This progress is ongoing. It will not cause any interruption. The programs have been updated; the configuration of all VM will be updated in 90mins.
The disconnection issues have been fixed on both LAX and HKG
The new node still takes time for delivery, installation and testing.
Semi
Semi-Extend-Unstable-SLA-Existing-Client-LiftTime-Discount-For-Dec-2019-LAX-1.3x
Annually
Extend-Unstable-SLA-Existing-Client-LiftTime-Discount-For-Dec-2019-LAX-1.3x
New users 13off 2 times with 1.3x (Quarterly Semi-Annually Annually)
New_Users_LAX_DEC_1.3x
Anyone 20off 8 times with 1.3x (Annually)
LAX_DEC_20off_annual_1.3x
These promotions will end on Dec 29, 2019
For all users who cancel server renewal on LAX Datacenter due to instability during this period, we can assist you to restore the previous order at the original price.
The new node still takes time for delivery, installation and testing.
Semi
Semi-Extend-Unstable-SLA-Existing-Client-LiftTime-Discount-For-Dec-2019-LAX-1.3x
Annually
Extend-Unstable-SLA-Existing-Client-LiftTime-Discount-For-Dec-2019-LAX-1.3x
New users 13off 2 times with 1.3x (Quarterly Semi-Annually Annually)
New_Users_LAX_DEC_1.3x
Anyone 20off 8 times with 1.3x (Annually)
LAX_DEC_20off_annual_1.3x
These promotions will end on Dec 29, 2019
For all users who cancel server renewal on LAX Datacenter due to instability during this period, we can assist you to restore the previous order at the original price.
/var/log/DMIT-NOC.log pinned «The disconnection issues have been fixed on both LAX and HKG The new node still takes time for delivery, installation and testing. Semi Semi-Extend-Unstable-SLA-Existing-Client-LiftTime-Discount-For-Dec-2019-LAX-1.3x Annually Extend-Unstable-SLA-Existing…»
The route of China Mobile AS9808 from China to Los Angles has been rerouted to Hong Kong.
/var/log/DMIT-NOC.log
Quick maintain for *HBG3W1 in HKG.
There are still some issues on these nodes, we already fix it, but a reboot is still required.
The reboot will be operated today.
The reboot will be operated today.
/var/log/DMIT-NOC.log pinned «There are still some issues on these nodes, we already fix it, but a reboot is still required. The reboot will be operated today.»
Due to specific reasons, we need to switch the IP for all VMs which in the LAX data center and 205.210.164.0/22 subnet recently.
The new subnet is 154.17.0.0/19;
Please keep looking your email, after switching, we will reboot your VM to update the configuration. If your VM has no cloud-init installed, we cannot update your IP configuration.
The new subnet is 154.17.0.0/19;
Please keep looking your email, after switching, we will reboot your VM to update the configuration. If your VM has no cloud-init installed, we cannot update your IP configuration.
/var/log/DMIT-NOC.log pinned «Due to specific reasons, we need to switch the IP for all VMs which in the LAX data center and 205.210.164.0/22 subnet recently. The new subnet is 154.17.0.0/19; Please keep looking your email, after switching, we will reboot your VM to update the configuration.…»
HKG Core Network Maintaining;
We are trying to recover the connection/BGP session CW(AS1273) and IEPL between HKG-LAX. The connection between CERNET2 and HKG will be rerouted back soon.
We are trying to recover the connection/BGP session CW(AS1273) and IEPL between HKG-LAX. The connection between CERNET2 and HKG will be rerouted back soon.
/var/log/DMIT-NOC.log
HKG Core Network Maintaining; We are trying to recover the connection/BGP session CW(AS1273) and IEPL between HKG-LAX. The connection between CERNET2 and HKG will be rerouted back soon.
Since our Core Router does not support GE(1Gbps) interface, the currently 1Gbps module has no enough FIB memory, we have to move the IEPL connection to our Equinix HK1 PoP for compatibility connection.
Also, our contract with CW will be ended in Feb 2020, we will use AS3491 to connect with CERNET2. As we test and inquiry, AS3491 has PNI with CERNET2, which means it has a larger bandwidth than CW( CW connect with CERNET2 via HKIX).
We apologize for the recent unstable network.
- - - - - -
The new nodes in LAX Datacenter have been installed. These servers will be available within this month; It is expected to provide services to over 800 users, which means we can migrate all VMs to new nodes if you want.
The CPU is Xeon Gold 6230( running on full power, 3.9Ghz mode )
RAM is DDR4 2933Mhz
We are using S3510 MLC SSD (67k/15.3k IOPS, 500/460 MB/s) on these nodes.
Also, our contract with CW will be ended in Feb 2020, we will use AS3491 to connect with CERNET2. As we test and inquiry, AS3491 has PNI with CERNET2, which means it has a larger bandwidth than CW( CW connect with CERNET2 via HKIX).
We apologize for the recent unstable network.
- - - - - -
The new nodes in LAX Datacenter have been installed. These servers will be available within this month; It is expected to provide services to over 800 users, which means we can migrate all VMs to new nodes if you want.
The CPU is Xeon Gold 6230( running on full power, 3.9Ghz mode )
RAM is DDR4 2933Mhz
We are using S3510 MLC SSD (67k/15.3k IOPS, 500/460 MB/s) on these nodes.
/var/log/DMIT-NOC.log pinned «Since our Core Router does not support GE(1Gbps) interface, the currently 1Gbps module has no enough FIB memory, we have to move the IEPL connection to our Equinix HK1 PoP for compatibility connection. Also, our contract with CW will be ended in Feb 2020…»