/var/log/DMIT-NOC.log
4.76K subscribers
189 photos
6 files
117 links
Download Telegram
Dear all,

Due to the current shortage of computing resources, we will stop new VM orders on April 4 at UTC time. Our new server is expected to arrive at the data center around April 9 - 10.

Please do not forget renew your server if you still need it.

Sale Dept.
/var/log/DMIT-NOC.log
Dear all, Due to the current shortage of computing resources, we will stop new VM orders on April 4 at UTC time. Our new server is expected to arrive at the data center around April 9 - 10. Please do not forget renew your server if you still need it. Sale…
Dear all,

As the servers still have not arrived in Hong Kong (sent from the United States), we have to postpone the installation of new servers until next Monday (Hong Kong time. 14 Apr).

The Tech Specs of master host has been changed to

E5-4657Lv2 (4 Sockets, Full Power, Performance Profile)
512G DDR3 ECC REG 1600MHz (4 Channel, 32 Slots)
500G MLC SSD (18 Pcs, RAID 50)
10GE Uplink, 10GE Storage Link.
There are two nodes will be online at this time.

The reason we use the E5-4600v2 instead of E7-4800v2 is that there is no independent cooling system installed in our rack. This will cause the temperature of the processor, hard disk and memory to be higher than 60 degrees Celsius. This exceeds the temperature limit set by DMIT for the stable operation of the server.

Installing a cooling system or arranging a rack for every two E7 nodes will lead to higher costs which is unacceptable.

E7 system uses 1.2kVA~1.7kVa energy. For the safety and energy security, we finally chose E5-4600v2 family solution.


BTW, we are going to update our Backbone Network to 40GE (Not later than Q3,2019).

At the same time, we will launch our open source mirror project in the summer.

As a public welfare project, DMIT will provide resources and we would like to invite more community members to maintain it. More details will be updated later.

Best,
Zac
DMIT Inc.
Our staff are still installing the server hardware & system. The installation is expected to be completed today. We are going to accepting new server orders no later than Tuesday, Hong Kong time.
Dear all,

We are very pleased to tell you that all DMIT HKG datacenter services can be ordered directly right now.

The server will be created once you purchased.

Please look here, this is our long term promotion: https://www.dmit.io/announcements/18/Long-Term-Promotion-for-VM-13x-Traffic-and-Discount.html
Hope you still love DMIT.

Best regards,
DMIT Sale Team.
/var/log/DMIT-NOC.log pinned «Dear all, We are very pleased to tell you that all DMIT HKG datacenter services can be ordered directly right now. The server will be created once you purchased. Please look here, this is our long term promotion: https://www.dmit.io/announcements/18/Long…»
Dear All,

We now accept all non-monthly customers to migrate VM to the new node(CHBG3W1, DHBG3W1).

At the same time, we give priority to customer who has VM on node 7SYJ422 & 7Y29D02.

Please back up your data, we cannot guarantee the data safe during the migration process.

Please also note that the high-speed storage network cannot be used because the existing node and the new node are not in the same racks.

Since there will be a lots of requests. It will takes time.

Your VM will be completely unavailable during the migration.

>Tickets please.

NOC.
/var/log/DMIT-NOC.log pinned «Dear All, We now accept all non-monthly customers to migrate VM to the new node(CHBG3W1, DHBG3W1). At the same time, we give priority to customer who has VM on node 7SYJ422 & 7Y29D02. Please back up your data, we cannot guarantee the data safe during the…»
We reallocated IPv6 addresses of some VMs. Some IPv6 was repeatedly allocated due to API errors caused by a system timeout problem a few weeks ago. We have fixed the bugs and reallocated the duplicate addresses.

Dev
/var/log/DMIT-NOC.log
Dear All, We now accept all non-monthly customers to migrate VM to the new node(CHBG3W1, DHBG3W1). At the same time, we give priority to customer who has VM on node 7SYJ422 & 7Y29D02. Please back up your data, we cannot guarantee the data safe during the…
Hi All,

We now accept VM which located in 7SYJ422 and 7Y29D02 with any payment period transfer to the new node.

However, the number is limited. Please contect with us ASAP.

This is to reduce the load on these two nodes. At the same time, you will get relatively better computing, IO performance.

Meanwhile, we will completely replace this node later in Q3.

The new orders will not be allocated to these two nodes.

NOC.
The bug of Transfer function has been fixed.
We have made some minor adjustments to the system architecture, which has improved performance to some extent. However, it may not be obvious.

These adjustments will only be used in new machines.

From Dev.

----------
Hi All,

We made few changes on China Routing.
There are still some adjustments to be made in the next month.
It will be proceed without affecting the network.


From NOC.
TOS Update:

https://www.dmit.io/legal/tos/

++16.8 If you unilaterally initiate a dispute from the payment company under the premise of violating TOS, we will reserve the right to shut down your account.

++16.9 If we receive the "unauthorized transaction" returned from the payment method, we will hand over some of your personal data (including name, IPs, payment information and server information) for verification by the payment gateway company.
Dear all,

Due to special circumstances, we allow the usage of SMTP TCP 25 port.

Please do not use our server to send SPAM email according to the AUP.

NOC
NOC:

Our physical connection with NTT is down, please wait.
/var/log/DMIT-NOC.log
We are waitng reply from NOC of Local Loop providers.
Unknown failure on local loop. The Local Loop provider is checking. We lost the NTT Connection right now. It will be fixed soon. We make CW as major IPv4 Transit ISP now.
Our computing resources will soon be exhausted.

At the same time, there are not too many IPv4 resources left. We will stop the expansion of Large Bandwidth China's direct-connected VM after the last batch of servers are installed next time.

NOC
We will stop accepting new server orders on May 10 (Eastern time). The final batch of hardware is expected to be installed on May 17 (Eastern time).

Sale
Hi all,

Thanks for using our services. But for now, all of our resources were used up again, because of the large amount of order today. We are very sorry about this situation. Our NOC team are urgently install the last servers. Please wait for us for a few days.

Best,
DMIT Inc.