HKG Datacenter Maintenance Notice:
We have to install several new network devices and reboot Layer 2 Core Switch multiple times during 12:00 - 15:00 Feb 19 Hong Kong Time. Please prepare.
Expect offline time: 15 mins
Best,
NOC.
We have to install several new network devices and reboot Layer 2 Core Switch multiple times during 12:00 - 15:00 Feb 19 Hong Kong Time. Please prepare.
Expect offline time: 15 mins
Best,
NOC.
/var/log/DMIT-NOC.log pinned «HKG Datacenter Maintenance Notice: We have to install several new network devices and reboot Layer 2 Core Switch multiple times during 12:00 - 15:00 Feb 19 Hong Kong Time. Please prepare. Expect offline time: 15 mins Best, NOC.»
Network upgrade announcement:
Dear all,
Please note that we plan to enable our new Cisco Core Router at 24 and/or 25 Feb 2019. There will be an outage during switching the network to the new router.
Our new IP Transit Upstream will be available at the same time.
At the same time, after the upgrade is completed, we need time to deal with route optimization. at that time, it will also result in a certain period of time when Chinese routes cannot be directly connected. we will do this at night ( between 3: 00 and 6: 00 hong kong time )
Thank you for your understanding.
Also, after new Upstream Online. We will launch our new services:
- Dedicated Instance
- Shared Hosting (Multiple Features)
- Asian Routes VM ( Lower Price and Non-China Routes)
Best regards,
DMIT Inc.
Dear all,
Please note that we plan to enable our new Cisco Core Router at 24 and/or 25 Feb 2019. There will be an outage during switching the network to the new router.
Our new IP Transit Upstream will be available at the same time.
At the same time, after the upgrade is completed, we need time to deal with route optimization. at that time, it will also result in a certain period of time when Chinese routes cannot be directly connected. we will do this at night ( between 3: 00 and 6: 00 hong kong time )
Thank you for your understanding.
Also, after new Upstream Online. We will launch our new services:
- Dedicated Instance
- Shared Hosting (Multiple Features)
- Asian Routes VM ( Lower Price and Non-China Routes)
Best regards,
DMIT Inc.
/var/log/DMIT-NOC.log pinned «Network upgrade announcement: Dear all, Please note that we plan to enable our new Cisco Core Router at 24 and/or 25 Feb 2019. There will be an outage during switching the network to the new router. Our new IP Transit Upstream will be available at the same…»
Our new DDoS Firewall is available right now.
It will make very few packet loss (ICMP Only). Also, if you got very fewer clean packets/s when got DDoS Attack, it will make 10~15ms latency increased right now. The latency increase is happening because the packet forward engine is processing packet in batches.
Those errors will be fixed in the next patch which will be available in next few days by our DDoS Firewall vendor.
It will make very few packet loss (ICMP Only). Also, if you got very fewer clean packets/s when got DDoS Attack, it will make 10~15ms latency increased right now. The latency increase is happening because the packet forward engine is processing packet in batches.
Those errors will be fixed in the next patch which will be available in next few days by our DDoS Firewall vendor.
/var/log/DMIT-NOC.log
Network upgrade announcement: Dear all, Please note that we plan to enable our new Cisco Core Router at 24 and/or 25 Feb 2019. There will be an outage during switching the network to the new router. Our new IP Transit Upstream will be available at the same…
Note again:
There is an outage event at 3AM Feb 25, 2019, Hong Kong Time.
Please prepare.
Best regards,
NOC.
There is an outage event at 3AM Feb 25, 2019, Hong Kong Time.
Please prepare.
Best regards,
NOC.
Important:
Due to insufficient computing resources, in order to ensure server performance, we will suspend sales of some products according to the remaining resources. Our new infrastructure will be deployed in Mar 2019.
If you need to deploy more servers, please complete the deployment / order before February 27.
Best,
NOC.
Due to insufficient computing resources, in order to ensure server performance, we will suspend sales of some products according to the remaining resources. Our new infrastructure will be deployed in Mar 2019.
If you need to deploy more servers, please complete the deployment / order before February 27.
Best,
NOC.
Maintenance Progress: New Router Configuring
Online ETA: 45 min;
Online ETA: 45 min;
AUP modified notice:
There are 2 changes on our AUP Argument.
https://www.dmit.io/legal/aup/
Original:
> USE OF SERVICES
> Provide Public Proxy Services that could result in the blocking of DMIT IP space or ASN. [Encrypted Private Proxy are allowed]
.....
> TERMINATION/ACCESS RESTRICTION
Latest:
> USE OF SERVICES
> Provide Public Proxy Services that could result in the blocking of DMIT IP space or ASN. [Encrypted Private Proxy are allowed]. The principle of judgment: we received IP SPAM warming from other networks, at the same time, the Uplink and the Downlink Traffic was equal.
.......
> TERMINATION/ACCESS RESTRICTION
> At the first time, we will suspend VM for a week. At the second time, we will terminate VM directly.
In order to define the principle of this clause, we have revised the AUP protocol.
When your server's upstream and downstream traffic is equal > and ( at the same time ) < Your VM receives IP SPAM complaints from other networks, we will be treated as a public proxy server and we will execute below action:
The first time suspend your VM for a week,
Terminate the single VM service for the second time.
IP SPAM: Email SPAM, ports scanning, intrusion attacks, password explosion, access to piracy content, etc. ).
There are 2 changes on our AUP Argument.
https://www.dmit.io/legal/aup/
Original:
> USE OF SERVICES
> Provide Public Proxy Services that could result in the blocking of DMIT IP space or ASN. [Encrypted Private Proxy are allowed]
.....
> TERMINATION/ACCESS RESTRICTION
Latest:
> USE OF SERVICES
> Provide Public Proxy Services that could result in the blocking of DMIT IP space or ASN. [Encrypted Private Proxy are allowed]. The principle of judgment: we received IP SPAM warming from other networks, at the same time, the Uplink and the Downlink Traffic was equal.
.......
> TERMINATION/ACCESS RESTRICTION
> At the first time, we will suspend VM for a week. At the second time, we will terminate VM directly.
In order to define the principle of this clause, we have revised the AUP protocol.
When your server's upstream and downstream traffic is equal > and ( at the same time ) < Your VM receives IP SPAM complaints from other networks, we will be treated as a public proxy server and we will execute below action:
The first time suspend your VM for a week,
Terminate the single VM service for the second time.
IP SPAM: Email SPAM, ports scanning, intrusion attacks, password explosion, access to piracy content, etc. ).
/var/log/DMIT-NOC.log pinned «AUP modified notice: There are 2 changes on our AUP Argument. https://www.dmit.io/legal/aup/ Original: > USE OF SERVICES > Provide Public Proxy Services that could result in the blocking of DMIT IP space or ASN. [Encrypted Private Proxy are allowed] .....…»
Hi all,
We just enabled 1Gbps Vodafone Transit (CW, AS1273) network for outgoing. But we will not send our prefix to Vodafone due to Anti-DDoS needed. If there are any non-China routes adjustments needed, please contact our Network Operation Center: noc@biz.dmit.io.
Best Regards,
NOC DMIT
We just enabled 1Gbps Vodafone Transit (CW, AS1273) network for outgoing. But we will not send our prefix to Vodafone due to Anti-DDoS needed. If there are any non-China routes adjustments needed, please contact our Network Operation Center: noc@biz.dmit.io.
Best Regards,
NOC DMIT
Dear all,
The IPv6 address will be available during the next 7-10 days. We will send a notification when IPv6 becomes available.
Best regards,
DMIT INC.
The IPv6 address will be available during the next 7-10 days. We will send a notification when IPv6 becomes available.
Best regards,
DMIT INC.
Hi all,
We are now asking AnchNet to adjust China Unicom AS4837 bypassing AS4809 to our network. There will be a shortage.
The recovery time depends on AnchNet.
Best,
NOC.
We are now asking AnchNet to adjust China Unicom AS4837 bypassing AS4809 to our network. There will be a shortage.
The recovery time depends on AnchNet.
Best,
NOC.
For Security Reason,
We now only accept Google NTP server connection in Asia.
If you need to use NTP server, you can choose the server in EU/AU/NA/SA/AFR and/or Google Anycast NTP Server(The only server is allowed by DMIT in Asia ):
time1.google.com
time2.google.com
time3.google.com
time4.google.com
If you need to use a self-built NTP server, it is recommended to use tunnel protocol or add a non - 123 UDP port.
Also, we will drop all the packets which source port is 11211 to our network. There is no limitation on use port 11211 as a server in DMIT network.
The source port means that when you “downloading”, the server use port 123/11211 sending traffic to your server.
NOC
We now only accept Google NTP server connection in Asia.
If you need to use NTP server, you can choose the server in EU/AU/NA/SA/AFR and/or Google Anycast NTP Server(The only server is allowed by DMIT in Asia ):
time1.google.com
time2.google.com
time3.google.com
time4.google.com
If you need to use a self-built NTP server, it is recommended to use tunnel protocol or add a non - 123 UDP port.
Also, we will drop all the packets which source port is 11211 to our network. There is no limitation on use port 11211 as a server in DMIT network.
The source port means that when you “downloading”, the server use port 123/11211 sending traffic to your server.
NOC