/var/log/DMIT-NOC.log
Coresite ident an issue on the cross connect; moving to a new interface, CMIN2 currently been disconnected.
Replaced a new interface and observed it being good.

We will monitor for 24 hours.

The problem seems caused by dirt port on the MMR.

=======
Last reply from Coresite: “Patching was moved and cleaned to new LOA demarc. Light levels: rx from you +3.12 dBm and they are tx +7.34 dBm”

=======
Earlier messages from Coresite: “I traced down the issue and cleaned the ports and fiber ends. Can you please let me know if that fixed the problem?”
/var/log/DMIT-NOC.log
Scheduled maintenance Location: All LAX servers. Time: Sep 26, 2024 ~ Oct 26, 2024. Duration: - Estimated 60 minutes for each VM; (cumulatively) - Estimated 2 hours for each node. (cumulatively) - Exclude waiting in booting sequence. Sequence: 1. Partial…
The maintenance is almost complete; we are verifying the status;

The CMIN2 issue happened near days is covered by this statement; we expect to experience network degradation sometime.

We will let you know once the status returns to normal.

Between Oct 26 ~ 31, we will move out the current network equipment and clean up the legacy things. We should expect no more issue but please wait for the further confirmation.
/var/log/DMIT-NOC.log
Photo
Interface configuration error. Revised.
There is a pending upgrade on LAX's MX Edge Router.
Expect maximum 30 mins down time and 60 mins network downgrade.

Time: 3PM ~ 6PM PDT.

DMIT.io will also be impacted at the same time.
LAX:
Emergency Rebooting one of hypervisor
Schedule Maintenance:
Location: Tokyo;
Date: Nov 18 ~ Dec 18, 2024

Content:
- Network Upgrade
- Hardware Upgrade
- Storage Upgrade

Impact:
- Network jitter, instability and downgrade;
- Possible SSH Key change due to hardware migrate;
- Experience downtime.
/var/log/DMIT-NOC.log pinned «Schedule Maintenance: Location: Tokyo; Date: Nov 18 ~ Dec 18, 2024 Content: - Network Upgrade - Hardware Upgrade - Storage Upgrade Impact: - Network jitter, instability and downgrade; - Possible SSH Key change due to hardware migrate; - Experience downtime.»
LAX:
Emergency Rebooting one of hypervisor; replace NICs.
Done.
/var/log/DMIT-NOC.log
TYO: Pending reboot action in an hour, expect VM reboot, and upto 1hr.
- Extend 30 mins.
- Extend 45 mins again. Due to the initial RH does not record the label correct; it took many time to trace and re-cable.
- Ready in 11:30 JST
Observed TOR issue on TYO, dispatching engineer.
Done
/var/log/DMIT-NOC.log
Content:
- Network Upgrade
- Hardware Upgrade
- Storage Upgrade
- Network Upgrade in progress.
-- Adding: RETN 100G, NTT 100G, BBIX 100G;
-- Remove: Equinix IX 10G, Cogent 10G; NTT 10G;
-- ETA: within a week.

- Hardware Upgrade completed
-- 7402P > 7443P
-- 10G * 2 per Node > 100G * 2 per Node
-- 20G uplink per rack > 100G * 2 uplink per rack.

- Storage Upgrade completed
-- SATA 10G SDS Cluster > NVMe 100G*2 SDS Cluster.
Adjusting TYO network arch, some product experienced downtime, and it has been fixed now.
There are couple works need to be done before return to stable.
Edge Router hardware swap.

Time: 10AM-1PM JST, 12/18/2024

Expected maximum downtime: 60mins
DMIT already aware about LAX EB packet loss on China direction.

We observe there is no packet loss on PtP segment.

The CMIN2 NOC response there is an issue on NCP submarine. Their capacity has been impacted due to the submarine issue.

DMIT will keep you updated.