𝐂𝐫𝐲𝐩𝐭𝐨 𝐏𝐫𝐨𝐭𝐨𝐜𝐨π₯ πˆπƒ | 𝐀𝐒𝐫𝐝𝐫𝐨𝐩
11K subscribers
29K photos
241 videos
177 files
32.4K links
Updates Alpha Seputar Crypto Airdrop, Testnet, Memes.

Business & Advertising DM : @TriPratamaXYZ
Download Telegram
πŸ”΄LAYEREDGE INCENTIVIZED TESTNETπŸ”΄

🧧Reward Confirm

πŸ‘‰ Sign Up : https://dashboard.layeredge.io/
βž– Submited Code : Powh0kRZ
βž– Connect Wallet Testnet EVM
βž– Click Start Node
βž– Go To Proof
βž– Submited What Ever Proof
βž– Done

πŸ–₯ Detail : https://blog.layeredge.io/layeredge-testnet-launch-incentivized-building-the-bitcoin-backed-internet-a7874d2e5cea
Please open Telegram to view this post
VIEW IN TELEGRAM
πŸ‘17😁3πŸ”₯2
Off Hela Ker Ngala Kadu Tong Di Ganggu 🀣
Please open Telegram to view this post
VIEW IN TELEGRAM
🀣8😁1🀬1πŸ–•1
πŸ’₯ Teko Finance Whitelist πŸ’₯

βœ”οΈ https://teko.finance/waitlist?ref_id=X1GNW6BBC
βœ”οΈ Submit Email
βœ”οΈ Done
Please open Telegram to view this post
VIEW IN TELEGRAM
πŸ‘16πŸ”₯3
RECAP AIRDROP TODAY

πŸ”— AIRDROP :

πŸ”— WL & EARLY ACCES :

1. OTAKUAI
2. Teko Finance Whitelist

πŸ”— TESTNET :

1. ATLAS NETWORK
2. CAPX S2
3. LAYEREDGE

πŸ”„ UPDATE AIRDROP & TESTNET

1. WALRUS
2. ANIME
3. ARICHAIN
4. TAKER
5. SOSOVALUE

🀫 YESTERDAY'S RECAP : TAHI
Please open Telegram to view this post
VIEW IN TELEGRAM
πŸ‘3πŸ”₯2😁1🀣1
Bangun Woi Ngopi β˜•οΈ
Please open Telegram to view this post
VIEW IN TELEGRAM
πŸ‘3😁1
𝐂𝐫𝐲𝐩𝐭𝐨 𝐏𝐫𝐨𝐭𝐨𝐜𝐨π₯ πˆπƒ | 𝐀𝐒𝐫𝐝𝐫𝐨𝐩
update Dill Note Testnet Dill Testnet Node Snapshot Soon πŸ“Έ Starting January 13, 2025, there will be a two-week period dedicated to running nodes in Phase 8. At the conclusion of this period, a snapshot will be taken to capture the balance of all nodes, and…
Update Dill

As Dill wraps up the final phase of the Alps incentivized testnet, we are excited to announce a major network upgrade. This upgrade is designed to prepare the Alps network for Dill’s mainnet launch.

Important Dates:
πŸ’  Faucet Closure and Quota Redistribution
The current faucet will soon be closed and unused quotas will be reclaimed. These will be reallocated to members who are under-allocated for deserved referral quotas.
Faucet closure Time: 27 January 2025 13:00  (Your local time)

πŸ’ Alps Testnet Upgrade
All clients must update to the latest software version during the upgrade preparation period.
Details, including the timeline and step-by-step instructions, will be shared after Phase 8 concludes.

πŸ’  Snapshot and Airdrop
Alps snapshots will be taken before and after the upgrade, both contributing to final points and airdrop calculations for the mainnet launch.
P1–P8 Snapshot:  28 January 2025 6:00  (Your local time)
Please open Telegram to view this post
VIEW IN TELEGRAM
πŸ‘2πŸ”₯2😁1