Here is a more detailed list of construction projects at Guantanamo Bay, Cuba, since 2017:
1. Liquefied Natural Gas (LNG) Power Plant (2017β2022)
Cost: $368.8 million
Details: A 20-megawatt power plant designed to switch from diesel to natural gas, aiming to save approximately $10 million annually on fuel costs and significantly reduce carbon emissions. Other associated projects included photovoltaic systems, lighting upgrades, and improvements to the water system to enhance energy efficiency.
Status: Completed
Source: Various energy and defense reportsβ(CNIC Navy
).
2. New Secret Courtroom (2022βOngoing)
Cost: $4 million
Details: Construction of a new courtroom designed for military commission proceedings that do not allow public or media access. This courtroom is intended to support classified trials and hearings.
Status: Under construction
Source: Pentagon announcementsβ(Democracy Now!
).
3. Joint Task Force Barracks (2019β2022)
Contractor: RQ Construction LLC
Cost: $70.8 million
Details: A project to build austere standard design barracks, including living and sleeping quarters, information systems, fire protection and alarm systems, and energy monitoring and control systems.
Status: Completed by March 2022
Source: U.S. Navy contractsβ(San Diego Business Journal
).
4. Upgrades to Detention Center Facilities (2018β2021)
Details: Various infrastructure upgrades, including new roofing for certain detention facilities, repairs to air conditioning systems, and modernization of plumbing and electrical systems.
Status: Completed
Source: Defense spending reports.
5. Expansion of Medical Facilities (2020β2023)
Details: Expansion and renovation of existing medical facilities to better serve both the detainee population and U.S. personnel stationed at the base. This included upgrades to medical equipment, emergency care facilities, and patient rooms.
Status: Completed
Source: U.S. Department of Defense communications.
6. Marine Infrastructure and Wharf Repairs (2019β2021)
Cost: Not specified
Details: Repairs and upgrades to marine infrastructure, including the construction of a new wharf and improvements to existing docks to support naval and coast guard operations.
Status: Completed
Source: U.S. Navy and contractor reports.
7. Construction of a New Dining Facility (2018β2020)
Cost: Not specified
Details: A new dining facility was constructed to accommodate military personnel, contractors, and visitors. The facility included a modern kitchen, dining hall, and sanitation facilities.
Status: Completed
Source: Military infrastructure updates.
8. Reconstruction of Roadways and Airfields (2021β2023)
Cost: Not specified
Details: Reconstruction and resurfacing of key roadways within the base and improvements to the airfield to enhance logistical operations and safety standards.
Status: Completed
Source: U.S. Department of Defense infrastructure updates.
9. Perimeter Security Enhancements (2020β2022)
Cost: Not specified
Details: Improvements to perimeter fencing, surveillance systems, and security checkpoints to enhance the base's overall security.
Status: Completed
Source: Defense infrastructure reports.
These projects reflect a wide range of construction efforts aimed at upgrading and maintaining the infrastructure and facilities at Guantanamo Bay to support military and detention operations, improve living conditions, and enhance security.
1. Liquefied Natural Gas (LNG) Power Plant (2017β2022)
Cost: $368.8 million
Details: A 20-megawatt power plant designed to switch from diesel to natural gas, aiming to save approximately $10 million annually on fuel costs and significantly reduce carbon emissions. Other associated projects included photovoltaic systems, lighting upgrades, and improvements to the water system to enhance energy efficiency.
Status: Completed
Source: Various energy and defense reportsβ(CNIC Navy
).
2. New Secret Courtroom (2022βOngoing)
Cost: $4 million
Details: Construction of a new courtroom designed for military commission proceedings that do not allow public or media access. This courtroom is intended to support classified trials and hearings.
Status: Under construction
Source: Pentagon announcementsβ(Democracy Now!
).
3. Joint Task Force Barracks (2019β2022)
Contractor: RQ Construction LLC
Cost: $70.8 million
Details: A project to build austere standard design barracks, including living and sleeping quarters, information systems, fire protection and alarm systems, and energy monitoring and control systems.
Status: Completed by March 2022
Source: U.S. Navy contractsβ(San Diego Business Journal
).
4. Upgrades to Detention Center Facilities (2018β2021)
Details: Various infrastructure upgrades, including new roofing for certain detention facilities, repairs to air conditioning systems, and modernization of plumbing and electrical systems.
Status: Completed
Source: Defense spending reports.
5. Expansion of Medical Facilities (2020β2023)
Details: Expansion and renovation of existing medical facilities to better serve both the detainee population and U.S. personnel stationed at the base. This included upgrades to medical equipment, emergency care facilities, and patient rooms.
Status: Completed
Source: U.S. Department of Defense communications.
6. Marine Infrastructure and Wharf Repairs (2019β2021)
Cost: Not specified
Details: Repairs and upgrades to marine infrastructure, including the construction of a new wharf and improvements to existing docks to support naval and coast guard operations.
Status: Completed
Source: U.S. Navy and contractor reports.
7. Construction of a New Dining Facility (2018β2020)
Cost: Not specified
Details: A new dining facility was constructed to accommodate military personnel, contractors, and visitors. The facility included a modern kitchen, dining hall, and sanitation facilities.
Status: Completed
Source: Military infrastructure updates.
8. Reconstruction of Roadways and Airfields (2021β2023)
Cost: Not specified
Details: Reconstruction and resurfacing of key roadways within the base and improvements to the airfield to enhance logistical operations and safety standards.
Status: Completed
Source: U.S. Department of Defense infrastructure updates.
9. Perimeter Security Enhancements (2020β2022)
Cost: Not specified
Details: Improvements to perimeter fencing, surveillance systems, and security checkpoints to enhance the base's overall security.
Status: Completed
Source: Defense infrastructure reports.
These projects reflect a wide range of construction efforts aimed at upgrading and maintaining the infrastructure and facilities at Guantanamo Bay to support military and detention operations, improve living conditions, and enhance security.
π19β€5
Forwarded from Tironianae π π Z. - Ultra Verbum Vincet (Tironianae)
~T edit: This. What did I tell you over and over again after the "[biden]" AFG debacle. We have concurrence. I know what I know, and it's just logic. And remember, Ahmed didn't like that picture taken of his house, did he?
https://x.com/TGonTheCouch/status/1801209588714295415?t=fxDvC3ECB6AOURVj7yVCkw&s=19
https://x.com/TGonTheCouch/status/1801209588714295415?t=fxDvC3ECB6AOURVj7yVCkw&s=19
π12β€1
Forwarded from SECRETS OF CIVILIZATIONS
This is a DIY survival filter to clean water anywhere, also usable for those collecting the rain water.
Make sure to share this post guys!
Yours, Steve Johnson
Join: @Secrets_of_civilizations
Make sure to share this post guys!
Yours, Steve Johnson
Join: @Secrets_of_civilizations
π8β€4
chrome-extension://efaidnbmnnnibpcajpcglclefindmkaj/https://www.supremecourt.gov/DocketPDF/24/24-258/327699/20241007191944512_MarasTx_Amicus%20MAIN%20%20October%207%202024%20EFile.pdf
Forwarded from π¦
Aquila π¦
This media is not supported in your browser
VIEW IN TELEGRAM
π¨BREAKING - North Korean state media published footage of the launch of a new intercontinental ballistic missile (ICBM) model called the βHwasong-19β
π5