Coercivity
4 members
http://coercivemag.net

A variable burn token based on magnetism. The higher the price, the higher the burn. The higher the burn, the higher the attraction level. Each trade results in an alternating magnetic field referred to as the hysteresis loop.
If you have Telegram, you can view and join
Coercivity right away.